visibility Similar

KENNEDY SPACE CENTER, FLA. - Viewed from across the nearby water, the launch of Space Shuttle Endeavour fills the horizon. Liftoff at 5:22:49 p.m. EDT sent Endeavour and its crew of four, plus the Expedition 5 crew, on its way to the International space Station on mission STS-111. This mission marks the 14th Shuttle flight to the International Space Station and the third Shuttle mission this year. Mission STS-111 is the 18th flight of Endeavour and the 110th flight overall in NASA's Space Shuttle program KSC-02pp0911

STS-135 - Public domain NASA photogrpaph

STS-118 - LAUNCH - Public domain NASA photogrpaph

STS-126 - LAUNCH - Public domain NASA photogrpaph

STS-114 - LAUNCH - Public domain NASA photogrpaph

STS089-S-005 (22 Jan. 1998) --- The space shuttle Endeavour cuts a bright swath through the dark sky as it blazes a trail toward the Russian Mir Space Station. Endeavour lifted off from Launch Pad 39A at 9:48:15 p.m. (EST), Jan. 22, 1998. STS-89 represents the eighth docking mission with Mir (all previous such flights utilized the Atlantis). After the docking with Mir, Andrew S. W. Thomas, mission specialist, will transfer to the station, succeeding astronaut David A. Wolf as guest cosmonaut researcher. Wolf will return to Earth aboard Endeavour. Thomas is expected to live and work on Mir until June 1998. Other crew members onboard were Terrence W. Wilcutt, Joe F. Edwards Jr., Bonnie J. Dunbar, James F. Reilly, Michael P. Anderson and Salizhan S. Sharipov. Sharipov represents the Russian Space Agency (RSA). Photo credit: NASA sts089-s-005

CAPE CANAVERAL, Fla. -- Bathed in bright xenon lights, space shuttle Discovery makes its nighttime trek, known as "rollout," from the Vehicle Assembly Building to Launch Pad 39A at NASA's Kennedy Space Center in Florida. It will take the shuttle, attached to its external fuel tank, twin solid rocket boosters and mobile launcher platform, about six hours to complete the move atop a crawler-transporter. Rollout sets the stage for Discovery's STS-133 crew to practice countdown and launch procedures during the Terminal Countdown Demonstration Test in mid-October. Targeted to liftoff Nov. 1, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the International Space Station. Photo credit: NASA/Jim Grossmann KSC-2010-4708

Space Shuttle Discovery STS-116

STS-132 - Public domain NASA photogrpaph

code Related

KENNEDY SPACE CENTER, Fla. --Space Shuttle Discovery clears the lightning rod on Launch Pad 39A as it soars into the blue sky on mission STS-105 to the International Space Station. Liftoff occurred at 5:10:14 p.m. EDT. Besides the Shuttle crew of four, Discovery carries the Expedition Three crew who will replace Expedition Two on the Station. The mission includes the third flight of an Italian-built Multi-Purpose Logistics Module delivering additional scientific racks, equipment and supplies for the Space Station and the Early Ammonia Servicer (EAS) tank. The EAS, which will be attached to the Station during two spacewalks, contains spare ammonia for the Station’s cooling system. The three-member Expedition Two crew will be returning to Earth aboard Discovery after a five-month stay on the Station KSC-01PP1465

KENNEDY SPACE CENTER, Fla. -- The solid rocket booster on Space Shuttle Discovery expends a column of flame as it hurtles into the sky on mission STS-105 to the International Space Station. Liftoff from Launch Pad 39A occurred at 5:10:14 p.m. EDT. Besides the Shuttle crew of four, Discovery carries the Expedition Three crew who will replace Expedition Two on the Space Station. The mission includes the third flight of an Italian-built Multi-Purpose Logistics Module delivering additional scientific racks, equipment and supplies for the Space Station and the Early Ammonia Servicer (EAS) tank. The EAS, which will be attached to the Station during two spacewalks, contains spare ammonia for the Station’s cooling system. The three-member Expedition Two crew will be returning to Earth aboard Discovery after a five-month stay on the Station KSC-01pp1469

KENNEDY SPACE CENTER, Fla. -- The plume of smoke grows behind Space Shuttle Discovery as it hurtles into space on mission STS-105. Liftoff occurred on time at 5:10:14 p.m. EDT. Besides the Shuttle crew of four, Discovery carries the Expedition Three crew who will replace Expedition Two on the International Space Station. The mission includes the third flight of an Italian-built Multi-Purpose Logistics Module delivering additional scientific racks, equipment and supplies for the Space Station, and two spacewalks. Part of the payload is the Early Ammonia Servicer (EAS) tank, which will be attached to the Station during the spacewalks. The EAS will be installed on the P6 truss, which holds the Station’s giant U.S. solar arrays, batteries and the cooling radiators. The EAS contains spare ammonia for the Station’s cooling system. The three-member Expedition Two crew will be returning to Earth aboard Discovery after a five-month stay on the Station KSC01padig267

KENNEDY SPACE CENTER, Fla. -- Smoke and steam roll over the ground as Space Shuttle Discovery lifts off on mission STS-105. Liftoff occurred on time at 5:10:14 p.m. EDT. Besides the Shuttle crew of four, Discovery carries the Expedition Three crew who will replace Expedition Two on the International Space Station. The mission includes the third flight of an Italian-built Multi-Purpose Logistics Module delivering additional scientific racks, equipment and supplies for the Space Station, and two spacewalks. Part of the payload is the Early Ammonia Servicer (EAS) tank, which will be attached to the Station during the spacewalks. The EAS will be installed on the P6 truss, which holds the Station’s giant U.S. solar arrays, batteries and the cooling radiators. The EAS contains spare ammonia for the Station’s cooling system. The three-member Expedition Two crew will be returning to Earth aboard Discovery after a five-month stay on the Station KSC01padig268

KENNEDY SPACE CENTER, Fla. -- Clouds of smoke and steam roll across the ground as Space Shuttle Discovery hurtles into the blue sky against a backdrop of cumulus clouds. Liftoff from Launch Pad 39A occurred at 5:10:14 p.m. EDT. Besides the Shuttle crew of four, Discovery carries the Expedition Three crew who will replace Expedition Two on the Space Station. The mission payload includes the third flight of the Italian-built Multi-Purpose Logistics Module Leonardo, delivering additional scientific racks, equipment and supplies for the Space Station, and the Early Ammonia Servicer (EAS) tank. The EAS, which will be attached to the Station during two spacewalks, contains spare ammonia for the Station’s cooling system. The three-member Expedition Two crew will be returning to Earth aboard Discovery after a five-month stay on the Station KSC-01PP1471

KENNEDY SPACE CENTER, Fla. -- Trees frame Space Shuttle Discovery trailing columns of fire from the solid rocket boosters as it soars into the blue sky on mission STS-105 to the International Space Station. Liftoff from Launch Pad 39A occurred at 5:10:14 p.m. EDT. Besides the Shuttle crew of four, Discovery carries the Expedition Three crew who will replace Expedition Two on the Space Station. The mission payload includes the third flight of the Italian-built Multi-Purpose Logistics Module Leonardo, delivering additional scientific racks, equipment and supplies for the Space Station, and the Early Ammonia Servicer (EAS) tank. The EAS, which will be attached to the Station during two spacewalks, contains spare ammonia for the Station’s cooling system. The three-member Expedition Two crew will be returning to Earth aboard Discovery after a five-month stay on the Station KSC-01PP1470

KENNEDY SPACE CENTER, Fla. -- Spectators gather on the grounds in front of the bleachers at the turn basin to watch the launch of Space Shuttle Discovery. A breeze from the southeast that has the flags snapping also kept gathering clouds away for the on-time liftoff at 5:10:14 p.m. EDT. Besides the Shuttle crew of four, Discovery carries the Expedition Three crew who will replace Expedition Two on the International Space Station. The mission includes the third flight of an Italian-built Multi-Purpose Logistics Module delivering additional scientific racks, equipment and supplies for the Space Station, and two spacewalks. Part of the payload is the Early Ammonia Servicer (EAS) tank, which will be attached to the Station during the spacewalks. The EAS will be installed on the P6 truss, which holds the Station’s giant U.S. solar arrays, batteries and the cooling radiators. The EAS contains spare ammonia for the Station’s cooling system. The three-member Expedition Two crew will be returning to Earth aboard Discovery after a five-month stay on the Station KSC01padig265

KENNEDY SPACE CENTER, Fla. -- -- Space Shuttle Discovery lifts off Launch Pad 39A with a crew of seven on board. Flames from the solid rocket boosters and external tank are drawn away by a flame trench below while water jets flood the area to help suppress the deafening sound. A rainbird can be seen to the left of the white solid rocket booster. In the background is the Atlantic Ocean. Liftoff of Discovery on mission STS-105 occurred at 5:10:14 p.m. EDT. Besides the Shuttle crew of four, Discovery carries the Expedition Three crew who will replace Expedition Two on the Space Station. The mission includes the third flight of an Italian-built Multi-Purpose Logistics Module delivering additional scientific racks, equipment and supplies for the Space Station and the Early Ammonia Servicer (EAS) tank. The EAS, which will be attached to the Station during two spacewalks, contains spare ammonia for the Station’s cooling system. The three-member Expedition Two crew will be returning to Earth aboard Discovery after a five-month stay on the Station KSC-01pp1473

KENNEDY SPACE CENTER, Fla. -- STS-105 Commander Scott Horowitz suits up for launch on mission STS-105. On the mission, Discovery will be transporting the Expedition Three crew and several scientific experiments and payloads to the ISS, including the Early Ammonia Servicer (EAS) tank. The EAS, which will support the thermal control subsystems until a permanent system is activated, will be attached to the Station during two spacewalks. The three-member Expedition Two crew will be returning to Earth aboard Discovery after a five-month stay on the Station. Launch is scheduled for 5:38 p.m. EDT Aug. 9 KSC-01pp1441

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Discovery soars from Launch Pad 39A into the blue sky on mission STS-105 to the International Space Station. Liftoff occurred at 5:10:14 p.m. EDT. Besides the Shuttle crew of four, Discovery carries the Expedition Three crew who will replace Expedition Two on the Station. The mission includes the third flight of an Italian-built Multi-Purpose Logistics Module delivering additional scientific racks, equipment and supplies for the Space Station and the Early Ammonia Servicer (EAS) tank. The EAS, which will be attached to the Station during two spacewalks, contains spare ammonia for the Station’s cooling system. The three-member Expedition Two crew will be returning to Earth aboard Discovery after a five-month stay on the Station KSC-01PP1466

description

Summary

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Discovery soars from Launch Pad 39A into the blue sky on mission STS-105 to the International Space Station. Liftoff occurred at 5:10:14 p.m. EDT. Besides the Shuttle crew of four, Discovery carries the Expedition Three crew who will replace Expedition Two on the Station. The mission includes the third flight of an Italian-built Multi-Purpose Logistics Module delivering additional scientific racks, equipment and supplies for the Space Station and the Early Ammonia Servicer (EAS) tank. The EAS, which will be attached to the Station during two spacewalks, contains spare ammonia for the Station’s cooling system. The three-member Expedition Two crew will be returning to Earth aboard Discovery after a five-month stay on the Station

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Nothing Found.

label_outline

Tags

kennedy space center discovery launch pad sky sts mission sts international space station liftoff crew shuttle crew expedition expedition three crew expedition two third flight italian built logistics module logistics module racks equipment supplies ammonia servicer ammonia servicer eas tank spacewalks two spacewalks system expedition two crew earth station ksc space shuttle space shuttle liftoff high resolution nasa
date_range

Date

1960 - 1969
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Station Ksc, Expedition Three Crew, Third Flight

STS105-306-021 - STS-105 - Usachev shoots water from a dispenser into his mouth

Space shuttle STS-66 Launch. NASA public domain image colelction.

KENNEDY SPACE CENTER, Fla. -- The landing lights on Runway 15 cast a glow as Space Shuttle Atlantis approaches touchdown on KSC’s Shuttle Landing Facility to complete the 9-day, 20-hour, 9-minute-long STS-101 mission. At the controls are Commander James D. Halsell Jr. and Pilot Scott “Doc” Horowitz. Also onboard the orbiter are Mission Specialists Mary Ellen Weber, James S. Voss, Jeffrey N. Williams, Susan J. Helms and Yury Usachev of Russia. The crew is returning from the third flight to the International Space Station. This was the 98th flight in the Space Shuttle program and the 21st for Atlantis, also marking the 51st landing at KSC, the 22nd consecutive landing at KSC, the 14th nighttime landing in Shuttle history and the 29th in the last 30 Shuttle flights. Main gear touchdown was at 2:20:17 a.m. EDT May 29 , landing on orbit 155 of the mission. Nose gear touchdown was at 2:20:30 a.m. EDT, and wheel stop at 2:21:19 a.m. EDT KSC00pp0675

KENNEDY SPACE CENTER, Fla. -- Workers in the payload changeout room on Launch Pad 39A keep watch as they move the Multi-Purpose Logistics Module Leonardo out of the payload canister. The MPLM is the primary payload on mission STS-105 to the International Space Station. The mission includes a crew changeover on the Space Station. Expedition Three will be traveling on Discovery to replace Expedition Two, who will return to Earth on board Discovery. Launch of STS-105 is scheduled for Aug. 9 KSC-01pp1392

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Discovery begins rolling into the fog that shrouds Kennedy Space Center. Discovery is on its way from the Vehicle Assembly Building to Launch Pad 39B and mission STS-102 to the International Space Station. Its payload is the Multi-Purpose Logistics Module Leonardo, a “moving van,” to carry laboratory racks filled with equipment, experiments and supplies to and from the Space Station aboard the Space Shuttle. The flight will also carry the Expedition Two crew up to the Space Station, replacing Expedition One, who will return to Earth on Discovery. Launch is scheduled for March 8 at 6:45 a.m. EST KSC01padig067

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, the Mobile Remote Servicer Base System (MBS) is viewed from the front right side. The MBS is part of the Canadian Space Agency’s (CSA) Space Station Remote Manipulator System (SSRMS), known as the Canadian arm. Scheduled to be launched in February 2002 on flight UF-2 to the International Space Station, the MBS will complete the Canadian Mobile Servicing System, or MSS. The mechanical arm will have the capability to "inchworm" from the U.S. Lab fixture to the MSS and travel along the Truss to work sites on the Space Station KSC00pp1413

STS108-718-087 - STS-108 - The Expedition Three crew poses for a portrait in the U.S. Laboratory

U.S. Soldiers with 2nd Battalion, 7th Infantry Regiment,

S104E5057 - STS-104 - Expedition Two and STS-104 joint crew portrait

STS105-347-030 - STS-105 - Helms eating in the middeck

S105E5200 - STS-105 - Meal for Expedition Two, Three and STS-105 crews in the ISS Service Module/Zvezda

STS108-718-062 - STS-108 - STS-108, Expedition Three and Expedition Four crews pose for a portrait in Destiny

Topics

kennedy space center discovery launch pad sky sts mission sts international space station liftoff crew shuttle crew expedition expedition three crew expedition two third flight italian built logistics module logistics module racks equipment supplies ammonia servicer ammonia servicer eas tank spacewalks two spacewalks system expedition two crew earth station ksc space shuttle space shuttle liftoff high resolution nasa