visibility Similar

11-11-22: In the Integration Facility at the Baikonur Cosmodrome in Kazakhstan, Expedition 38/39 Flight Engineer Koichi Wakata of the Japan Aerospace Exploration Agency (left), Soyuz Commander Mikhail Tyurin (center) and Flight Engineer Rick Mastracchio of NASA (right) pose for pictures Nov. 3 outside the Soyuz TMA-11M spacecraft during their final fit check dress rehearsal. The Soyuz rocket’s payload fairing behind them is adorned with the insignia of the Sochi Olympic Organizing Committee . The crewmembers, who will launch Nov. 7, Kazakh time for a six-month mission on the International Space Station, are carrying the Olympic torch to the complex with them for a four-day visit. NASA/Victor Zelentsov jsc2013e091781

S130E006980 - STS-130 - Behnken and Patrick in Node 1

Unpacking Discovery. NASA public domain image colelction.

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft

KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, STS-123 Pilot Dominic Gorie (second from right) checks out the orbiter boom sensor system in Endeavour's payload bay. He and other crew members are at NASA's Kennedy Space Center for a crew equipment interface test, a process of familiarization with payloads, hardware and the space shuttle. The STS-123 mission is targeted for launch on space shuttle Endeavour on Feb. 14. It will be the 25th assembly flight of the station. Photo credit: NASA/Kim Shiflett KSC-07pd3564

Robonaut 2 performs tests in the U.S. Laboratory

KENNEDY SPACE CENTER, FLA. -- In the Payload Hazardous Servicing Facility, the lander petals and attached airbags of the Mars Exploration Rover 2 (MER-2) are closed around the spacecraft during testing prior to launch. The MER Mission consists of two identical rovers set to launch in Spring 2003. Landing at different regions of Mars, they are designed to cover roughly 110 yards each Martian day over various terrain. Each rover will carry five scientific instruments that will allow it to search for evidence of liquid water that may have been present in the planet's past. KSC-03pd1053

S125E007473 - STS-125 - STS-125 MS3 Grunsfeld during EVA1

Behnken and Patrick in Node 1. NASA public domain image colelction.

code Related

STS-92 Commander Brian Duffy (left) talks with a worker during inspection of the payload (behind them) in Space Shuttle Discovery’s payload bay. He and other crew members Pilot Pamela Ann Melroy and Mission Specialists Koichi Wakata of Japan, Leroy Chiao, Peter J.K. “Jeff” Wisoff, Michael E. Lopez-Alegria and William S. McArthur Jr. are preparing for launch on Oct. 5, 2000. The mission is the fifth flight for the construction of the International Space Station. The payload includes the Integrated Truss Structure Z-1 and the third Pressurized Mating Adapter. During the 11-day mission, four extravehicular activities (EVAs), or space walks, are planned KSC-00pp1474

STS-92 Mission Specialist William S. McArthur Jr. smiles for the camera during inspection of the payload (left) in Space Shuttle Discovery’s payload bay. He and other crew members Commander Brian Duffy, Pilot Pamela Ann Melroy and Mission Specialists Koichi Wakata of Japan, Leroy Chiao, Peter J.K. “Jeff” Wisoff and Michael E. Lopez-Alegria are preparing for launch on Oct. 5, 2000. The mission is the fifth flight for the construction of the International Space Station. The payload includes the Integrated Truss Structure Z-1 and the third Pressurized Mating Adapter. During the 11-day mission, four extravehicular activities (EVAs), or space walks, are planned KSC-00pp1471

The STS-92 crew pose for a group photo after a snack prior to suiting up for launch. Seated left to right are Mission Specialists Peter J.K. “Jeff” Wisoff and Michael E. Lopez-Alegria; Pilot Pamela Ann Melory; Commander Brian Duffy; and Mission Specialists Koichi Wakata of Japan, William S. McArthur Jr. and Leroy Chiao. The mission is the fifth flight for the construction of the ISS. The payload includes the Integrated Truss Structure Z-1 and the third Pressurized Mating Adapter. During the 11-day mission, four extravehicular activities (EVAs), or spacewalks, are planned. The Z-1 truss is the first of 10 that will become the backbone of the International Space Station, eventually stretching the length of a football field. PMA-3 will provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. This launch is the fourth for Duffy and Wisoff, the third for Chiao and McArthur, second for Wakata and Lopez-Alegria, and first for Melroy. Launch is scheduled for 8:05 p.m. EDT. Landing is expected Oct. 21 at 3:55 p.m. EDT KSC-00pp1522

KENNEDY SPACE CENTER, FLA. -- Members of the STS-92 crew inspect part of the payload (left) in Space Shuttle Discovery’s payload bay. From left, they are Mission Specialists William S. McArthur Jr., Peter J.K. “Jeff” Wisoff and Leroy Chiao; Commander Brian Duffy is behind them. They and other crew members Pilot Pamela Ann Melroy and Mission Specialists Koichi Wakata of Japan and Michael E. Lopez-Alegria are preparing for launch on Oct. 5, 2000. The mission is the fifth flight for the construction of the International Space Station. The payload includes the Integrated Truss Structure Z-1 and the third Pressurized Mating Adapter. During the 11-day mission, four extravehicular activities (EVAs), or space walks, are planned KSC-00pp1476

In the Space Station Processing Facility, workers who have supported mission STS-92 gather for a photo with the crew: (left to right) Mission Specialists Koichi Wakata of Japan, Michael Lopez-Alegria, Jeff Wisoff, Bill McArthur and Leroy Chiao; Pilot Pam Melroy; and Commander Brian Duffy. STS-92 is scheduled to launch Oct. 5 at 9:30 p.m. EDT on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program KSC-00pp1331

The STS-92 crew exits the Operations and Checkout Building on their way to the Astrovan and Launch Pad 39A for a simulated countdown. Walking left to right are (foreground) Mission Specialists Koichi Wakata of Japan, Peter J.K. “Jeff” Wisoff and Leroy Chiao; and Pilot Pamela Ann Melroy. Behind them are Mission Specialists Michael E. Lopez-Alegria and William S. McArthur Jr.; and Commander Brian Duffy. The crew is taking part in Terminal Countdown Demonstration Test activities that provide emergency egress training, opportunities to inspect the mission payload, and the simulated countdown. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program KSC-00pp1360

STS-92 Pamela Ann Melroy pauses during inspection of the payload (behind her) in Space Shuttle Discovery’s payload bay. She and other crew members Commander Brian Duffy and Mission Specialists Koichi Wakata of Japan, Leroy Chiao, Peter J.K. “Jeff” Wisoff. Michael E. Lopez-Alegria and William S. McArthur Jr. are preparing for launch on Oct. 5, 2000. The mission is the fifth flight for the construction of the International Space Station. The payload includes the Integrated Truss Structure Z-1 and the third Pressurized Mating Adapter. During the 11-day mission, four extravehicular activities (EVAs), or space walks, are planned KSC-00pp1473

The STS-92 crew exits the Operations and Checkout Building on their way to the Astrovan and Launch Pad 39A for a simulated countdown. On the left, front to back, are Pilot Pamela Ann Melroy and Mission Specialists Leroy Chiao, Peter J.K. “Jeff” Wisoff, and Koichi Wakata of Japan. On the right, front to back, are Commander Brian Duffy and Mission Specialists William S. McArthur Jr. and Michael E. Lopez-Alegria. The crew is taking part in Terminal Countdown Demonstration Test activities that provide emergency egress training, opportunities to inspect the mission payload, and the simulated countdown. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program KSC-00pp1361

The STS-92 crew strides across the runway at KSC’s Shuttle Landing Facility, heading toward the aircraft that will take them back to Houston. They were at KSC for Crew Equipment Interface Test (CEIT) activities, looking over their mission payload and related equipment. From left are Mission Specialists Bill McArthur and Jeff Wisoff, Pilot Pam Melroy, Mission Specialist Michael Lopez-Alegria, Commander Brian Duffy and Mission Specialist Koichi Wakata, who is with the Japanese space agency. Not seen is Mission Specialist Leroy Chiao, who was also at KSC for the CEIT. STS-92 is scheduled to launch Oct. 5 on Shuttle Discovery from Launch Pad 39A on the fifth flight to the International Space Station. Discovery will carry the Integrated Truss Structure (ITS) Z1, the PMA-3, Ku-band Communications System, and Control Moment Gyros (CMGs) KSC-00pp0942

Members of the STS-92 crew look over the payload (left) in Space Shuttle Discovery’s payload bay. Left to right, in masks, are Mission Specialists Leroy Chiao, Peter J.K. “Jeff” Wisoff and William S. McArthur Jr. They and the other crew members Commander Brian Duffy, Pilot Pamela Ann Melroy and Mission Specialists Koichi Wakata of Japan, and Michael E. Lopez-Alegria are preparing for launch on Oct. 5, 2000. The mission is the fifth flight for the construction of the International Space Station. The payload includes the Integrated Truss Structure Z-1 and the third Pressurized Mating Adapter. During the 11-day mission, four extravehicular activities (EVAs), or space walks, are planned KSC-00pp1472

description

Summary

Members of the STS-92 crew look over the payload (left) in Space Shuttle Discovery’s payload bay. Left to right, in masks, are Mission Specialists Leroy Chiao, Peter J.K. “Jeff” Wisoff and William S. McArthur Jr. They and the other crew members Commander Brian Duffy, Pilot Pamela Ann Melroy and Mission Specialists Koichi Wakata of Japan, and Michael E. Lopez-Alegria are preparing for launch on Oct. 5, 2000. The mission is the fifth flight for the construction of the International Space Station. The payload includes the Integrated Truss Structure Z-1 and the third Pressurized Mating Adapter. During the 11-day mission, four extravehicular activities (EVAs), or space walks, are planned

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

label_outline

Tags

kennedy space center sts payload discovery bay space shuttle discovery payload bay masks specialists leroy chiao mission specialists leroy chiao peter peter j jeff wisoff jeff wisoff william mcarthur mcarthur jr commander brian duffy crew members commander brian duffy pilot pamela ann melroy pilot pamela ann melroy koichi wakata mission specialists koichi wakata japan michael michael e lopez alegria construction international space station truss truss structure z adapter extravehicular activities four extravehicular activities evas crew members space shuttle nasa
date_range

Date

1960 - 1969
collections

in collections

Space Shuttle Program

place

Location

Kennedy Space Center, FL
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Crew Members Commander Brian Duffy, Space Shuttle Discovery Payload Bay, Four Extravehicular Activities

Topics

kennedy space center sts payload discovery bay space shuttle discovery payload bay masks specialists leroy chiao mission specialists leroy chiao peter peter j jeff wisoff jeff wisoff william mcarthur mcarthur jr commander brian duffy crew members commander brian duffy pilot pamela ann melroy pilot pamela ann melroy koichi wakata mission specialists koichi wakata japan michael michael e lopez alegria construction international space station truss truss structure z adapter extravehicular activities four extravehicular activities evas crew members space shuttle nasa