visibility Similar

Gemini 4 prime crew during water egress training

sts112-316-023 - STS-112 - Public domain NASA photogrpaph

Dan Bursch smiles for the camera in the U.S. Laboratory during Expedition Four.

KENNEDY SPACE CENTER, Fla. -- STS-105 Mission Specialist Patrick Forrester suits up for launch on mission STS-105. The mission is Forrester’s first space flight. On the mission, Discovery will be transporting the Expedition Three crew and several scientific experiments and payloads to the International Space Station, including the Early Ammonia Servicer (EAS) tank. The EAS, which will support the thermal control subsystems until a permanent system is activated, will be attached to the Station during two spacewalks. The three-member Expedition Two crew will be returning to Earth aboard Discovery after a five-month stay on the Station. Launch is scheduled for 5:38 p.m. EDT Aug. 9 KSC-01pp1446

STS-90 Payload Specialist Jay Buckey, M.D., prepares for launch during suit-up activities in KSC's Operations and Checkout Building. Buckey and the rest of the STS-90 crew will shortly depart for Launch Pad 39B, where the Space Shuttle Columbia awaits a second liftoff attempt at 2:19 p.m. EDT. His first trip into space, Buckey is participating in a life sciences research flight that will focus on the most complex and least understood part of the human body the nervous system. Neurolab will examine the effects of spaceflight on the brain, spinal cord, peripheral nerves and sensory organs in the human body KSC-98pc493

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-129 crew members put on their launch-and-entry suits before heading to the Astrovan for the 15-minute ride to Launch Pad 39A. Commander Charles O. Hobaugh, seen here, is ready for launch. Liftoff is set for 2:28 p.m. EST Nov. 16. On STS-129, the crew will deliver two Express Logistics Carriers to the International Space Station, the largest of the shuttle's cargo carriers, containing 15 spare pieces of equipment including two gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm. Atlantis will return to Earth a station crew member, Nicole Stott, who has spent more than two months aboard the orbiting laboratory. STS-129 is slated to be the final space shuttle Expedition crew rotation flight. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-6315

Test subject equipped with Gemini 12 Life Support System and waist tethers

KENNEDY SPACE CENTER, FLA. - STS-121 Commander Steven Lindsey is eager for a third launch attempt on the mission. Here, he is donning his launch suit before heading to Launch Pad 39B. The July 2 launch attempt was scrubbed due to the presence of showers and thunderstorms within the surrounding area of the launch site. The launch of Space Shuttle Discovery on mission STS-121 is the 115th shuttle flight and the 18th U.S. flight to the International Space Station. During the 12-day mission, the STS-121 crew will test new equipment and procedures to improve shuttle safety, as well as deliver supplies and make repairs to the International Space Station. Photo credit: NASA/Kim Shiflett KSC-06pd1397

Expedition 25 Launch. NASA public domain image colelction.

code Related

STS-106 Mission Specialist Richard A. Mastracchio is helped with his launch and entry suit in the White Room before entering Space Shuttle Atlantis. The perfect on-time liftoff of Atlantis on mission STS-106 occurred at 8:45:47 a.m. EDT. On the 11-day mission to the International Space Station, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall. Landing of Atlantis is targeted for 4:45 a.m. EDT on Sept. 19 KSC-00pp1283

STS-106 Mission Specialist Richard A. Mastracchio waves at the camera upon his arrival at the KSC Shuttle Landing Facility. He and the rest of the crew will be making pre-launch preparations for the fourth flight to the International Space Station. STS-106 is scheduled to launch Sept. 8, 2000, at 8:45 a.m. EDT from Launch Pad 39B. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall KSC00pp1235

Before entering Space Shuttle Atlantis, STS-106 Mission Specialist Yuri I. Malenchenko gets help with his launch and entry suit in the White Room. The perfect on-time liftoff of Atlantis on mission STS-106 occurred at 8:45:47 a.m. EDT. On the 11-day mission to the International Space Station, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall. Landing of Atlantis is targeted for 4:45 a.m. EDT on Sept. 19 KSC-00pp1281

Before entering Space Shuttle Atlantis, STS-106 Mission Specialist Edward T. Lu gets help with his launch and entry suit in the White Room. The perfect on-time liftoff of Atlantis on mission STS-106 occurred at 8:45:47 a.m. EDT. On the 11-day mission to the International Space Station, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall. Landing of Atlantis is targeted for 4:45 a.m. EDT on Sept. 19 KSC-00pp1280

STS-106 Mission Specialist Boris V. Morukov gives a thumbs up for launch during suitup in the Operations and Checkout Building before launch. This is Morukov’s first space flight. Space Shuttle Atlantis is set to lift off 8:45 a.m. EDT on the fourth flight to the International Space Station. During the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall KSC-00pp1257

STS-106 Pilot Scott D. Altman is suited up in the Operations and Checkout Building and ready for launch. This is Altman’s second space flight. Space Shuttle Atlantis is set to lift off 8:45 a.m. EDT on the fourth flight to the International Space Station. During the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall KSC-00pp1255

During suitup in the Operations and Checkout Building, STS-106 Mission Specialist Daniel C. Burbank smiles in anticipation of launch. This is Burbank’s first space flight. Space Shuttle Atlantis is set to lift off 8:45 a.m. EDT on the fourth flight to the International Space Station. During the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall KSC-00pp1259

In the Operations and Checkout Building, STS-101 Mission Specialist Jeffrey N. Williams gets final check on his launch and entry suit before heading a third time to Launch Pad 39A for launch of Space Shuttle Atlantis. The previous two launch attempts were scrubbed due to high cross winds at the Shuttle Landing Facility. The mission will take the crew to the International Space Station to deliver logistics and supplies and to prepare the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk. This is the third assembly flight to the Space Station. After the 10-day mission, Atlantis is expected to land at KSC May 6 at about 12:03 p.m. EDT KSC00pp0581

STS-106 Mission Specialist Edward T. Lu smiles as he gets suited up in the Operations and Checkout Building before launch. This is Lu’s second space flight. Space Shuttle Atlantis is set to lift off 8:45 a.m. EDT on the fourth flight to the International Space Station. During the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall KSC-00pp1256

Already suited up, Mission Specialist Richard A. Mastracchio gives thumbs up for launch today. This is Mastracchio’s first space flight. Space Shuttle Atlantis is set to lift off 8:45 a.m. EDT on the fourth flight to the International Space Station. During the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall KSC-00pp1258

description

Summary

Already suited up, Mission Specialist Richard A. Mastracchio gives thumbs up for launch today. This is Mastracchio’s first space flight. Space Shuttle Atlantis is set to lift off 8:45 a.m. EDT on the fourth flight to the International Space Station. During the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Space Shuttle Atlantis was a space shuttle that was operated by NASA as part of the Space Shuttle program. It was the fourth operational shuttle built, and the last one to be built before the program was retired in 2011. Atlantis was named after the first research vessel operated by the Woods Hole Oceanographic Institution, and it made its first flight in October 1985. Over the course of its career, Atlantis completed 33 missions and spent a total of 307 days in space. Its last mission was STS-135, which was the final mission of the Space Shuttle program. Atlantis is now on display at the Kennedy Space Center Visitor Complex in Florida. Space Shuttle Atlantis (Orbiter Vehicle Designation: OV-104) was one of the four first operational orbiters in the Space Shuttle fleet of NASA, the space agency of the United States. (The other two are Discovery and Endeavour.) Atlantis was the fourth operational shuttle built. Atlantis is named after a two-masted sailing ship that operated from 1930 to 1966 for the Woods Hole Oceanographic Institute. Atlantis performed well in 25 years of service, flying 33 missions.

label_outline

Tags

kennedy space center specialist richard mission specialist richard mastracchio flight mastracchio first space flight atlantis space shuttle atlantis international space station crew support tasks support tasks orbit transfer supplies transfer supplies quarters zvezda module zvezda service module long duration first long duration crew expedition expedition one fall fall ksc space shuttle astronauts nasa
date_range

Date

08/09/2000
collections

in collections

Space Shuttle Program

Space Shuttle Atlantis

The Fourth Pperational Shuttle Built
place

Location

Kennedy Space Center, FL
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Mission Specialist Richard, Fall Ksc, Support Tasks

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test (CEIT) activities at SPACEHAB, members of the STS-106 crew check out a Russian foot restraint, equipment that will be part of the payload on their mission to the International Space Station. Around the table are Mission Specialist Yuri I. Malenchenko (back to camera), a SPACEHAB worker, and Mission Specialists Daniel C. Burbank (at end of table) and Edward T. Lu (right). Others at KSC for the CEIT are Commander Terrence W. Wilcutt, Pilot Scott D. Altman, and Mission Specialists Boris V. Morukov and Richard A. Mastracchio. Malenchenko and Morukov represent the Russian Aviation and Space Agency. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B KSC00pp0961

KENNEDY SPACE CENTER, FLA. -- As part of Crew Equipment Interface Test (CEIT) activities at SPACEHAB, members of the STS-106 crew check out a Maximum Envelope Support Structure (MESS) rack they will be using during their mission to the International Space Station. Seen here (with backs to camera, in uniform) are Mission Specialist Richard A. Mastracchio, Pilot Scott D. Altman, Boris V. Morukov, and Edward T. Lu (at right). Also taking part in the CEIT are Commander Terrence W. Wilcutt and Mission Specialists Yuri I. Malenchenko and Daniel C. Burbank. Malenchenko and Morukov represent the Russian Aviation and Space Agency. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B on an 11-day mission. The seven-member crew will prepare the Space Station for its first resident crew and begin outfitting the newly arrived Zvezda Service Module. They will perform support tasks on orbit, transfer supplies and prepare the Zvezda living quarters for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall KSC00pp0952

STS068-21-017 - STS-068 - STS-68 crewmembers perform various tasks onboard Endeavour's middeck

STS097-315-035 - STS-097 - Expedition One's Krikalev in Zvezda during STS-97's ISS visit

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. From left are Mission Specialists Richard A. Mastracchio, Daniel C. Burbank, Yuri I. Malenchenko, Edward T. Lu and Boris V. Morukov. Behind Lu is Pilot Scott D. Altman. Not seen is Commander Terrence W. Wilcutt. Malenchenko and Morukov represent the Russian Aviation and Space Agency. The astronauts are taking part in Crew Equipment Interface Test activities at KSC. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module for the first long-duration crew, dubbed "Expedition One," which is due to arrive at the Station in late fall. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B KSC-00pp0955

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. From left are Mission Specialists Richard A. Mastracchio, Daniel C. Burbank, Yuri I. Malenchenko, Edward T. Lu and Boris V. Morukov. Behind Lu is Pilot Scott D. Altman. Not seen is Commander Terrence W. Wilcutt. Malenchenko and Morukov represent the Russian Aviation and Space Agency. The astronauts are taking part in Crew Equipment Interface Test activities at KSC. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module for the first long-duration crew, dubbed "Expedition One," which is due to arrive at the Station in late fall. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B KSC00pp0955

STS068-33-006 - STS-068 - STS-68 crewmembers perform various tasks onboard Endeavour's middeck

KENNEDY SPACE CENTER, Fla. -- At the 217-foot level of the Rotating Service Structure on Launch Pad 39B, the STS-106 crew takes a break during Terminal Countdown Demonstration Activities (TCDT) for a group photo. Pictured from left are Mission Specialists Richard A. Mastracchio, Yuri I. Malenchenko and Daniel C. Burbank; Pilot Scott D. Altman; Commander Terrence W. Wilcutt; and Mission Specialists Boris V. Morukov and Edward T. Lu. The TCDT provides the crew with emergency egress training, opportunities to inspect their mission payload in the orbiter’s payload bay, and a simulated launch countdown. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall KSC-00pp1177

STS063-29-036 - STS-063 - Astronauts performing various tasks on aft flight deck

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test activities, the STS-106 crew check equipment at SPACEHAB that they will be using on their mission. From left are Mission Specialists Yuri I. Malenchenko, Boris V. Morukov and Richard A. Mastracchio, Pilot Scott D. Altman, and Mission Specialists Daniel C. Burbank and Edward T. Lu. Malenchenko and Morukov represent the Russian Aviation and Space Agency. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B on an 11-day mission to the International Space Station. The seven-member crew will prepare the Space Station for its first resident crew and begin outfitting the newly arrived Zvezda Service Module. They will perform support tasks on orbit, transfer supplies and prepare the Zvezda living quarters for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall KSC00pp0944

In the Space Station Processing Facility, workers prepare an S-band Antenna Support Assembly (SASA) to be lifted and moved to the Integrated Truss Structure (ITS) Z1, an element of the International Space Station. The antenna will be attached to the truss. The SASA antenna is primarily for local communications between the orbiter and Space Station. The Z1 is an early exterior framework to allow the first U.S. solar arrays, on mission STS-97, flight 4A, to be temporarily installed on Unity for early power. The Z1 is scheduled on mission STS-92, the fifth flight to the Space Station, in the fall KSC-00pp0757

S97E5079 - STS-097 - Expedition One and STS-97 crew on Endeavour flight deck

Topics

kennedy space center specialist richard mission specialist richard mastracchio flight mastracchio first space flight atlantis space shuttle atlantis international space station crew support tasks support tasks orbit transfer supplies transfer supplies quarters zvezda module zvezda service module long duration first long duration crew expedition expedition one fall fall ksc space shuttle astronauts nasa