visibility Similar

code Related

KENNEDY SPACE CENTER, FLA. - Members of the Columbia Reconstruction Project Team are scattered around the RLV Hangar as they examine various pieces of debris. The final shipment of debris arrived on this date - recovery efforts have been concluded in East Texas. Prior to this final shipment, the total number of items at KSC is 82,567, weighing 84,800 pounds or 38 percent of the total dry weight of Columbia. Of those items, 78,760 have been identified, with 753 placed on the left wing grid in the RLV Hangar. KSC-03pd1421

KENNEDY SPACE CENTER, FLA. - Members of the Columbia Reconstruction Project Team place debris on the mounting fixture for RCC pieces of the leading edge of Columbia's left wing. The final shipment of debris arrived on this date - recovery efforts have been concluded in East Texas. Prior to this final shipment, the total number of items at KSC is 82,567, weighing 84,800 pounds or 38 percent of the total dry weight of Columbia. Of those items, 78,760 have been identified, with 753 placed on the left wing grid in the RLV Hangar. KSC-03pd1416

KENNEDY SPACE CENTER, FLA. - A member of the Columbia Reconstruction Project Team examines part of the Columbia debris in the RLV Hangar at KSC. The final shipment of debris arrived on this date - recovery efforts have been concluded in East Texas. Prior to this final shipment, the total number of items at KSC is 82,567, weighing 84,800 pounds or 38 percent of the total dry weight of Columbia. Of those items, 78,760 have been identified, with 753 placed on the left wing grid in the RLV Hangar. KSC-03pd1418

KENNEDY SPACE CENTER, FLA. - Members of the Columbia Reconstruction Project Team place part of the final shipment of debris on the floor grid of the RLV Hangar. The recovery efforts have been concluded in East Texas. Prior to this final shipment, the total number of items at KSC is 82,567, weighing 84,800 pounds or 38 percent of the total dry weight of Columbia. Of those items, 78,760 have been identified, with 753 placed on the left wing grid in the RLV Hangar. KSC-03pd1413

KENNEDY SPACE CENTER, FLA. - A member of the Columbia Reconstruction Project Team examines part of the Columbia debris on the floor of the RLV Hangar. The final shipment of debris arrived on this date - recovery efforts have been concluded in East Texas. Prior to this final shipment, the total number of items at KSC is 82,567, weighing 84,800 pounds or 38 percent of the total dry weight of Columbia. Of those items, 78,760 have been identified, with 753 placed on the left wing grid in the RLV Hangar. KSC-03pd1417

KENNEDY SPACE CENTER, FLA. - Members of the Columbia Reconstruction Project Team carry part of the final shipment of debris. The recovery efforts have been concluded in East Texas. Prior to this final shipment, the total number of items at KSC is 82,567, weighing 84,800 pounds or 38 percent of the total dry weight of Columbia. Of those items, 78,760 have been identified, with 753 placed on the left wing grid in the RLV Hangar. KSC-03pd1412

KENNEDY SPACE CENTER, FLA. - Mike Leinbach talks to the Columbia Reconstruction Project team before arrival of the final shipment of Columbia debris. The recovery efforts have been concluded in East Texas. Prior to this final shipment, the total number of items at KSC is 82,567, weighing 84,800 pounds or 38 percent of the total dry weight of Columbia. Of those items, 78,760 have been identified, with 753 placed on the left wing grid in the RLV Hangar. KSC-03pd1406

KENNEDY SPACE CENTER, FLA. - The Columbia Reconstruction Project team meets before arrival of the final shipment of Columbia debris. The recovery efforts have been concluded in East Texas. Prior to this final shipment, the total number of items at KSC is 82,567, weighing 84,800 pounds or 38 percent of the total dry weight of Columbia. Of those items, 78,760 have been identified, with 753 placed on the left wing grid in the RLV Hangar.

KENNEDY SPACE CENTER, FLA. - Shuttle Launch Director Mike Leinbach talks to the Columbia Reconstruction Project team before arrival of the final shipment of Columbia debris. The recovery efforts have been concluded in East Texas. Prior to this final shipment, the total number of items at KSC is 82,567, weighing 84,800 pounds or 38 percent of the total dry weight of Columbia. Of those items, 78,760 have been identified, with 753 placed on the left wing grid in the RLV Hangar. KSC-03pd1405

KENNEDY SPACE CENTER, FLA. - Members of the Columbia Reconstruction Project Team place debris on the mounting fixture for RCC pieces of the leading edge of Columbia’s left wing. The final shipment of debris arrived on this date - recovery efforts have been concluded in East Texas. Prior to this final shipment, the total number of items at KSC is 82,567, weighing 84,800 pounds or 38 percent of the total dry weight of Columbia. Of those items, 78,760 have been identified, with 753 placed on the left wing grid in the RLV Hangar.

description

Summary

KENNEDY SPACE CENTER, FLA. - Members of the Columbia Reconstruction Project Team place debris on the mounting fixture for RCC pieces of the leading edge of Columbia’s left wing. The final shipment of debris arrived on this date - recovery efforts have been concluded in East Texas. Prior to this final shipment, the total number of items at KSC is 82,567, weighing 84,800 pounds or 38 percent of the total dry weight of Columbia. Of those items, 78,760 have been identified, with 753 placed on the left wing grid in the RLV Hangar.

Nothing Found.

label_outline

Tags

kennedy space center members columbia reconstruction project team debris columbia reconstruction project team place debris fixture rcc pieces rcc pieces edge shipment recovery efforts recovery efforts texas east texas items percent weight grid rlv hangar rlv hangar high resolution workers nasa florida cape canaveral
date_range

Date

28/04/2003
place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore East Texas, Rcc, Fixture

U.S. Air Force sheet metal technicians with the 116th

KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, United Space Alliance worker Dan Kenna (right) positions a Reinforced Carbon Carbon panel on the table to perform flash thermography. In the background, Paul Ogletree observes the monitor. Attached to the leading edge of the wing of the orbiters, the gray carbon composite RCC panels have sufficient strength to withstand the aerodynamic forces experienced during launch and reentry, which can reach as high as 800 pounds per square foot. The operating range of RCC is from minus 250º F to about 3,000º F, the temperature produced by friction with the atmosphere during reentry.

KENNEDY SPACE CENTER, FLA. -- In the RLV Hangar, the floor grid is marked with a growing number of pieces of Columbia debris. The Columbia Reconstruction Project Team will attempt to reconstruct the orbiter as part of the investigation into the accident that caused the destruction of Columbia and loss of its crew as it returned to Earth on mission STS-107. KSC-03pd0586

KENNEDY SPACE CENTER, FLA. - Members of the Columbia Reconstruction Project Team carry part of the final shipment of debris. The recovery efforts have been concluded in East Texas. Prior to this final shipment, the total number of items at KSC is 82,567, weighing 84,800 pounds or 38 percent of the total dry weight of Columbia. Of those items, 78,760 have been identified, with 753 placed on the left wing grid in the RLV Hangar. KSC-03pd1412

Coil winding fixture in position. Photograph taken November 21, 1956. Bubble Chamber-191

KENNEDY SPACE CENTER, FLA. -- Members of a U.S. Forest Service search team walk a grid during a Columbia Recovery search near the Hemphill site. The group is accompanied by a space program worker able to identify potential hazards of Shuttle parts. Kennedy Space Center workers are participating in the Columbia Recovery efforts at the Lufkin (Texas) Command Center, four field sites in East Texas, and the Barksdale, La., hangar site. KSC is working with representatives from other NASA Centers and with those from a number of federal, state and local agencies in the recovery effort. KSC provides vehicle technical expertise in the field to identify, collect and return Shuttle hardware to KSC. KSC-03pd1106

A toy lies in a flooded road in Orange, Texas, March

Navy Rear Adm. Mike Shatynski, retired, explains the

Production. B-24 bombers and C-87 transports. The tail of a consolidated transport plane is fitted to the wing center section in the fuselage mating fixture at a Western aircraft plant. This new transport, an adaptation of the B-24 bomber, is known as the C-87, and carries one of the greatest human or cargo loads of any plane now in mass production. It is built in a plant equipped with the best and most modern air conditioning and fluorescent lighting systems in the country

S121E06666 - STS-121 - View of RCC repair sample pallet for DTO 484 taken during STS-121 / Expedition 13 joint operations

U.S. airmen assigned to the 455th Expeditionary Maintenance

Secretary Alphonso Jackson [and aides] touring East Texas [and meeting with officials and residents] after Hurricane Rita

Topics

kennedy space center members columbia reconstruction project team debris columbia reconstruction project team place debris fixture rcc pieces rcc pieces edge shipment recovery efforts recovery efforts texas east texas items percent weight grid rlv hangar rlv hangar high resolution workers nasa florida cape canaveral