visibility Similar

Generator and Switch Board Sub-Station 6, Contract 1838

description

Summary

Photographs of the Construction and Repair of Buildings, Facilities, and Vessels at the New York Navy Yard

label_outline

Tags

generator switch board switch board contract new york new york navy yard ship building high resolution switch board sub station industrial history power generator shipyard us national archives
date_range

Date

02/12/1914
create

Source

The U.S. National Archives
link

Link

https://catalog.archives.gov/
copyright

Copyright info

No known copyright restrictions

label_outline Explore Contract, New York Navy Yard, Power Generator

Commercial buses under contract to U.S. Forces are used to transport troops during the NATO-sponsored Autumn Forge exercises

[Monitor, Receiver switch, United States Veterans Hospital. Designed and constructed by Radio Construction Corp., Washington, D.C.]

An Air Force Plant Representative Office (AFPRO) officer inspects air-launched cruise missiles to insure quality as part of the Air Force Contract Management program

Cicero, Illinois. Engineer in the cab of a diesel switch engine at the Clyde yard of the Chicago, Burlington and Quincy Railroad

Bridges. Ashokan reservoir. ... Contract 49. April 28, 1914.

SWITCH GEAR IN THE CENTER SECTION

Chicago, Illinois. Diesel switch engine working in a railway yard

Technical Sergeant Bill Dimsdale, and MASTER Sergeant Bill Allen, crew chiefs, for the 169th Operations Support Flight (OSF), troubleshoot a secondary fuel pump pressure switch on engine number three at Charleston Air Force Base, South Carolina. The 169th OSF is assigned to the 169th Fighter Wing at McEntire Air National Guard Station in South Carolina. During this five-day mission, this crew will make two trips to Soto Cano AB, Honduras. They will deliver much needed water purification units, food, and medical supplies to assist local civilians affected from the aftermath of Hurricane Mitch

Generating equipment lies beneath a section of collapsed roof in the base power plant. The roof collapsed under the weight of the volcanic ash that fell during the eruption of Mount Pinatubo

Wallkill pressure tunnel. Side-wall and arch forms in place ready for concrete, with inclined track to platform on level with top of side-wall. Contract 47. April 11, 1911.

Strömbrytare i bakelit?, Tekniska museet, Sweden

A close up of a button on a machine. Easy instrument machine manually, work.

Topics

generator switch board switch board contract new york new york navy yard ship building high resolution switch board sub station industrial history power generator shipyard us national archives