visibility Similar

Cannon Renewal Project - June 2018 (43296854802)

US Embassy in Beirut - Chancery Office Building - 1982

CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, steady progress is made by a team of construction workers to erect the walls of the Propellants North Administrative and Maintenance Facility. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann KSC-2010-1119

Hightstown, New Jersey. Progress photograph taken during construction of the Jersey homesteads, a U.S. Resettlement Administration project

LEED PROPELLANT PROJECT CONSTRUCTION PROGRESS - WALLS GOING UP W/ CRANE 2010-1119

SCHOFIELD BARRACKS, Hawaii — A gray wall of cement

Green & Silley Weir a vessel in dry dock (5954214250)

February 2019 - Senate Park Restoration (32536776037)

Flood and Storm Damage, Taylor Bridge washed out. Remarks: C.L. Taylor standing on the other side.

code Related

Esseltes byggnad, FinntorpLanternintakExteriör

description

Summary

Esseltes byggnad, FinntorpLanternintakExteriör

Public domain photograph - 1950s, 1960s, Sweden, Scandinavian architecture, free to use, no copyright restrictions image - Picryl description

Nothing Found.

label_outline

Tags

sodermanland nacka sune sundahl arkdes neck building high resolution construction sites building construction digital museum sweden
date_range

Date

01/01/1958
create

Source

Digital museum
link

Link

https://digitaltmuseum.org/
copyright

Copyright info

No known restrictions on publication.

label_outline Explore Nacka, Neck, Sodermanland

Topics

sodermanland nacka sune sundahl arkdes neck building high resolution construction sites building construction digital museum sweden