visibility Similar

CAPE CANAVERAL, Fla. –In High Bay 4 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, a large crane is attached to the Ares I-X upper stage simulator service module/service adapter segment to lift and move it to a stand. Ares I-X is the test vehicle for the Ares I, which is part of the Constellation Program to return men to the moon and beyond. The Ares I-X is targeted for launch in July 2009. Photo credit: NASA/Kim Shiflett KSC-2009-2463

STS086-372-015 - STS-086 - Interior views of the Mir space station

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, workers check the U.S. Lab, named Destiny, as it settles into the rotation and handling fixture in preparation for testing in the altitude chamber. Destiny is scheduled to fly on mission STS-98 in early 2001. During the mission, the crew will install the Lab in the Space Station during a series of three space walks. The STS-98 mission will provide the Station with science research facilities and expand its power, life support and control capabilities. The U.S. Lab module continues a long tradition of microgravity materials research, first conducted by Skylab and later Shuttle and Spacelab missions. Destiny is expected to be a major feature in future research, providing facilities for biotechnology, fluid physics, combustion, and life sciences research KSC00pp0831

S115E06950 - STS-115 - Yeast GAP in the MDDK of the Space Shuttle Atlantis during Expedition 13 / STS-115 Joint Operations

KENNEDY SPACE CENTER, FLA. -- STS-111 Mission Specialist Franklin Chang-Diaz (left) tries another maneuver on the replacement pitch roll joint for the SSRMS (Canadarm 2). The joint will be installed during the mission to the International Space Station. Part of the payload on mission STS-111 is the Mobile Base System (MBS), which will be installed on the Mobile Transporter to complete the Canadian Mobile Servicing System, or MSS. The mechanical arm will then have the capability to "inchworm" from the U.S. Lab Destiny to the MSS and travel along the truss to work sites. STS-111 is the second utilization flight (UF-2) to the Space Station and will also carry the Expedition 5 crew to replace Expedition 4. Launch is scheduled for May 30, 2002 KSC-02pd0558

EVAS VII NBL Week I Crew runs.. NASA public domain image colelction.

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft

OVERHEAD VIEW OF NOZZLE ACOUSTIC TEST RIG POWERED LIFT RIG AND ACTIVE NOISE CONTROL FAN

Capsule Sections in High Bay. NASA public domain image. Kennedy space center.

code Related

Crew Module Water Landing Model Assessment

description

Summary

Crew Module Water Landing Model Assessment (CMWLMA) Test site photos at Aberdeen Test Center Aberdeen Maryland

Nothing Found.

label_outline

Tags

crew module cmwlma lrc sandra gibbs paul bagby langley research center crew module water crew module water model assessment high resolution nasa
date_range

Date

17/02/2011
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Cmwlma, Sandra Gibbs Paul Bagby, Crew Module Water

A crane lowers a geodesic vapor recovery dome onto a bulk fuel tank. The dome is being placed on the tank as part of the Environmental Protection Agency's Compliance Assessment and Management Program

[Severe Storms, Tornadoes, and Flooding] Iowa City, IA, July 25, 2008 -- Steve Fausch (left), Maintenance Manager for the Mayflower Dormitory at the University of Iowa, explains some of the damage done to the building's heating, cooling, water, and electrical systems by last month's massive flood to FEMA Building Assessment Team (BAT) member David Fila, Dave Flumerfelt with Mitigation, and BAT member Ryan Hembree. The Mayflower is the largest dorm at UI; getting it ready for students is a priority for FEMA. the university, and the state. Photo by Greg Henshall / FEMA

ORION Project-(SPLASH) Structural Passive Landing Attenuation fo

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians, lying on a work platform, remove window #8 from the top of the crew module of space shuttle Atlantis. Inspection and maintenance of the crew module windows is standard procedure between shuttle missions. Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission. The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight. Launch is targeted for May 14. Photo credit: NASA/Glenn Benson KSC-2010-1082

Weldon Spring, Mo., June 5, 2013 -- A home struck by a tornado on the evening of May 31, 2013 tore away the living room wall and roof. FEMA and the State of Missouri are doing Preliminary Damage Assessments (PDA) in the areas hit by a tornado. PDA is a joint assessment used to determine the magnitude and impact of an event's damage. The State uses the results of the PDA to determine if the situation is beyond the combined capabilities of the State and local resources and to verify the need for supplemental Federal assistance. Steve Zumwalt/FEMA

St Charles, Mo., June 5, 2013 -- A Preliminary Damage Assessment (PDA) team looks at a neighborhood damaged by a tornado. PDA is a joint assessment used to determine the magnitude and impact of an event's damage. The State uses the results of the PDA to determine if the situation is beyond the combined capabilities of the State and local resources and to verify the need for supplemental Federal assistance. Steve Zumwalt/FEMA

A crane is positioned near geodesic vapor recovery dome prior to placing the dome atop one of the bulk fuel tanks in the background. The domes are being used as part of the Environmental Protection Agency's Compliance Assessment and Management Program

Coast Guard crewmembers work alongside New York State

171027-N-MC499-029 BAYAMON, Puerto Rico (Oct. 27, 2017)

Crew Module Water Landing Model Assessment

A joint group of Royal Thai Armed Forces service members

Fire Island, N.Y., Nov. 26, 2012 -- A Preliminary Damage Assessment team comprised of state, local and federal officials, including experts from FEMA, New York State Office of Emergency Management (NYSOEM), Suffolk County Office of Emergency Management (SCOEM), the United States Army Corp of Engineers, The National Park Service and local Fire Island officials gather to assess a plan for debris removal. FEMA is working with state and local officials to assist residents who were affected by Hurricane Sandy. Chris Ragazzo/FEMA

Topics

crew module cmwlma lrc sandra gibbs paul bagby langley research center crew module water crew module water model assessment high resolution nasa