visibility Similar

code Related

CIR Maintenance Work Area Preparation

description

Summary

ISS037-E-013602 (15 Oct. 2013) --- NASA astronaut Michael Hopkins, Expedition 37 flight engineer, works on the Combustion Integrated Rack (CIR) in the Destiny laboratory of the International Space Station.

Nothing Found.

label_outline

Tags

johnson space center cir maintenance preparation high resolution astronauts laboratory science nasa
date_range

Date

15/10/2013
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Preparation, Maintenance, Cir

TRAINING - ASTRONAUT GLENN, JOHN - AEROMEDICAL LAB - CAPE

Mukai on middeck with food packets

Members of the Afghan air force Aerial Port Squadron

U.S. Air Force Staff Sgt. Brandon Currie, New Horizons

200821-N-JL568-1004 EAST CHINA SEA (August 21, 2020)

A Cardwell-500 drilling rig mast is lifted onto a support structure atop a 40-K-loader in preparation for loading onto a 60th Marine Air Wing C-5B Galaxy aircraft. The rig will be flown to Semipalatinsk, USSR, where it will be used to drill a satellite h

200513-N-PI330-0110 GULF OF ADEN (May 13, 2020) Boatswain’s

S126E008423 - STS-126 - WRS Configuration in US Lab

Sailor conducting maintenance on an F-14 Tomcat on the ship's flight deck.

190812-N-YG414-049 YOKOSUKA, Japan (August 12, 2019)

The maintenance electronic trainer (TAU-199/E) was developed by the Boeing Company for maintenance training on the flight loads recorder system, the AIMS (IFF) system, and the crash position indicator/flight recorder system of the E-3A Sentry aircraft

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians, lying on a work platform, remove window #8 from the top of the crew module of space shuttle Atlantis. Inspection and maintenance of the crew module windows is standard procedure between shuttle missions. Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission. The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight. Launch is targeted for May 14. Photo credit: NASA/Glenn Benson KSC-2010-1082

Topics

johnson space center cir maintenance preparation high resolution astronauts laboratory science nasa