Capitol Dome Restoration January 2015
Summary
Work on scaffold has completed moving up the Dome and repairs have begun in enclosed areas. This repair work includes lead paint removal, application of primer coat, cast iron repairs, new castings, epoxy filling of pits and voids in the cast iron surfaces and more. Details at www.aoc.gov/Dome ( http://www.aoc.gov/Dome ) .. .This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov ( http://www.aoc.gov ) .
The history of the United States Capitol Building begins in 1793. Since then, the U.S. Capitol has been built, burnt, rebuilt, extended and restored. The Capitol that we see today is the result of several major periods of construction; it stands as a monument to the ingenuity, determination and skill of the American people.
- Construction capital dome washington Stock Photos and Images
- Capitol building restoration Stock Photos and Images - Alamy
- Scaffolding in snow Stock Photos and Images - Alamy
- Capitol Dome Restoration January 2015 (15705362024) - PICRYL
- Us capitol winter snow building washington dc usa architecture hi ...
- Dome restoration project hi-res stock photography and images - Alamy
- Iron work in washington dc Stock Photos and Images - Alamy
- Capitol dome restoration project Stock Photos and Images - Alamy
- Capitol building with construction Stock Photos and Images - Alamy
- Capitol building washington snow Stock Photos and Images - Alamy