visibility Similar

code Related

Building 41, Air Compressor Installation Monthly Progress Photo, Looking East, Yard Labor

description

Summary

Photographs of the Construction and Repair of Buildings, Facilities, and Vessels at the New York Navy Yard

label_outline

Tags

air compressor installation air compressor installation progress progress photo yard labor new york new york navy yard ship building high resolution yard labor workers industrial history industrial facilities shipyard us national archives
date_range

Date

03/01/1911
create

Source

The U.S. National Archives
link

Link

https://catalog.archives.gov/
copyright

Copyright info

No known copyright restrictions

label_outline Explore Air Compressor Installation, Yard Labor, Progress Photo

Dams under construction. Watts Bar Dam, shown here under construction, has a semi-outdoors type powerhouse with an enormous gantry crane (to the right of the picture) for installation and removal of units. The project is further distinguished by a control building which is entirely removed from the hydro plant, being located some 120 feet higher on top of a steep cliff and with direct connection to the switchyard behind. The windowless left wing of the control building houses the control room; the tower-like structure in the back accomodates air conditioning, restrooms, etc. The glass wall, upper level, contains the reception room with a broad semi-circular overlook terrace, the story below the terrace devoted to offices

Power and conservation. Chickamauga Dam, Tennessee Valley Authority (TVA). Switchyard of the TVA's Chickamauga Dam, located near Chattanooga, 471 miles above the mouth of the Tennessee River. The dam has an authorized power installation of 81,000 kilowatts, which can be increased to a possible ultimate of 108,000 kilowatts. The reservoir at the dam adds 377,000 acre feet of water to controlled storage on the Tennessee River system. The power that passes through this switchyard serves many useful domestic, agricultural and industrial uses

Asbury Park, N.J., Jan. 17, 2013 -- The Calvary Chapel Relief volunteers, a FEMA Voluntary Organizations Active in Disasters (VOAD) organization, works tirelessly on the Asbury Park boardwalk removing damaged boards while prepping the walk for the installation of new boards. VOAD is the forum where organizations share knowledge and resources throughout the disaster cycle to help disaster survivors and their communities. Adam DuBrowa/FEMA

Dry Dock Number 4, Monthly Progress Photo, Grading and Paving Around Dock, Looking East, Yard Labor - Uvalde Asphalt Company Contractor

An interior view of auxiliary machine room No. 1 on the guided missile frigate USS CROMMELIN (FFG 37) at 80 percent completion

INSTALLATION OF A 6000 PSI POUNDS PER SQUARE INCH GASEOUS HELIUM PRESSURE VESSEL

U.S. Army Corps of Engineers South Pacific Border District

Lt. Gen. Todd Semonite, 54th Chief of Engineers and

Building 2, Storehouse, Wooden Addition on Warrington Avenue Side, Looking North, Yard Labor

Tornado - Joplin, Mo. , August 4, 2011 -- FEMA videographer Steve Zumwalt documents installation of a storm shelter at a temporary mobile home park for survivors of May 22 EF-5 tornado. FEMA is in the city to provide assistance to the disaster survivors. Elissa Jun/FEMA

Heavy concrete barriers block access to the entrance area of the Lowell E. Smith Elementary School, by vehicles, as personnel at Davis-Monthan Air Force Base carry out necessary procedures to ensure the safety and security of the installation and its personnel, in compliance with National Command Authority directives

Dominion Alkali & Chemical Co., Ltd., Beaunhois [i.e. Beauharnois], Canada. Close-up of compressor

Topics

air compressor installation air compressor installation progress progress photo yard labor new york new york navy yard ship building high resolution yard labor workers industrial history industrial facilities shipyard us national archives