Marshall Space Center construction progress

description

Summary

At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. Again to the east, just south of the Block House, was a newly constructed Pump House. Its function was to provide water to the stand to prevent melting damage during testing. The water was sprayed through small holes in the stand’s 1900 ton water deflector at the rate of 320,000 gallons per minute. In this photo, taken May 22, 1963, the Pump House is undergoing construction.

Nothing Found.

label_outline

Tags

saturn v s ic stand pump house construction progress msfc marshall space flight center marshall high resolution test block house stand s ic static test west test area s ic ground level test area diameter saturn v s ic first stage marshall space center construction progress redstone test construction structure water ton water deflector control center facilities pounds steel boom nasa
date_range

Date

22/05/1962
place

Location

Huntsville, Madison County, Alabama ,  34.71143, -86.65408
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Ton Water Deflector, Marshall Space Center Construction Progress, Diameter Saturn V S Ic First Stage

Chemical Warfare Service - Plants - Edgewood Arsenal - Edgewood Arsenal, Maryland. Pump house - intake side

Marines monitor situation maps in the air combat element control center (mobile) during Exercise COLD WINTER'87

Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Test Stand 1-5, Test Area 1-115, northwest end of Saturn Boulevard, Boron, Kern County, CA

U.S. Air Force Staff Sgt. Dustin Haycox, 823rd Expeditionary

Eldora 360 Hall Way - Public Domain image, National Parks Gallery

Wernher von Braun, America Space Program

Galena, AK, June 12, 2014 -- FEMA Region 10 Administrator, Ken Murphy (L) and Federal Coordinating Officer, Willie Nunn (R) inspect the construction progress of a Cold Climate Home for a disaster survivor that is eligible for FEMA assistance. Each one of the homes will take approximately 8 weeks to complete and are being built concurrently by volunteers from Samaritans Purse and United Methodist Volunteers in Mission, while FEMA coordinates the volunteer labor and funds the construction materials and shipping. Adam DuBrowa/ FEMA

Attack of the Seminoles on the block house

Block House of Fort Pitt, Pittsburgh, Penn'a

Nenana Landing, AK, May 27, 2014 -- FEMA logistics is underway moving millions of pounds of building supplies, tractors, and tools to inner Yukon villages. After severe flooding in 2013 inundated the villages of the Yukon, FEMA continues to rebuild during the summer months, coordinating supplies, labor and resources to the disaster survivors. Adam DuBrowa/ FEMA

Youngstown City Water Works, Pump House, 160 North West Avenue, Youngstown, Mahoning County, OH

Phoenix Iron Company, Pump House, Between Rolling Mill & Girder Shop No. 6, Phoenixville, Chester County, PA

Topics

saturn v s ic stand pump house construction progress msfc marshall space flight center marshall high resolution test block house stand s ic static test west test area s ic ground level test area diameter saturn v s ic first stage marshall space center construction progress redstone test construction structure water ton water deflector control center facilities pounds steel boom nasa