visibility Similar

code Related

Marshall Space Center construction progress

description

Summary

At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. North of the massive S-IC test stand, the F-1 Engine test stand was built. Designed to assist in the development of the F-1 Engine, the F-1 test stand is a vertical engine firing test stand, 239 feet in elevation and 4,600 square feet in area at the base. Capability was provided for static firing of 1.5 million pounds of thrust using liquid oxygen and kerosene. Like the S-IC stand, the foundation of the F-1 stand is keyed into the bedrock approximately 40 feet below grade. This photo, taken April 4, 1963 depicts the construction of the F-1 test stand foundation walls.

label_outline

Tags

saturn v s ic test stand f 1 test stand construction progress msfc marshall space flight center marshall high resolution test f 1 test s ic f 1 engines f 1 engine test foundation walls s ic static test s ic test west test area test area redstone test diameter saturn v s ic first stage ground level marshall space center construction progress construction pounds structure square feet nasa
date_range

Date

04/04/1963
place

Location

Huntsville, Madison County, Alabama ,  34.71143, -86.65408
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore F 1 Test Stand, F 1 Test, F 1 Engine Test

[Sullivan's Island, S.C. Guns at northeast angle of Fort Marshall]

INSTALLATION OF A 6000 PSI POUNDS PER SQUARE INCH GASEOUS HELIUM PRESSURE VESSEL

[Dunkirk] - [Marshall Plan Helps Revive Dunkirk]

A M35A2 2 1/2-ton cargo truck pulls a support vehicle up the starboard loading ramp of the United States Naval Ship (USNS) Gordon. USNS Gordon is the first United States Navy (USN) Large, Medium-Speed Roll-on/Roll-off Ships, or LMSR, cargo vessel. USNS Gordon is a former commercial tanker and underwent conversion to United States Navy Military Sealift Command specifications to make it ideal for the loading, transport and unloading of United States Army and United States Marine Corps combat equipment. It is more than 300 yards long and has a storage capacity of more than 300,000 square feet. The ship is named in honor of MASTER Sergeant Gary I. Gordon, US Army, who was posthumously...

Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Test Stand 1-5, Test Area 1-115, northwest end of Saturn Boulevard, Boron, Kern County, CA

Reevaluation of quarters' rates at Zion National Park. Garn Olsen house, 345 South Main. 1,500 square feet, 10 years old. Rent $85. 3 bedrooms - 1/2 basement, fireplace, wall to wall carpet in living room and bedroom. Comparable to 3 bedroom Oak Creek. ; Z

KENNEDY SPACE CENTER, FLA. - Members of a hurricane assessment team from Johnson Space Center and Marshall Space Flight Center look at damage on the roof of the Vehicle Assembly Building (VAB) a week after Hurricane Frances hit the east coast of Central Florida and Kennedy Space Center. The VAB lost 820, 4- x 16-foot panels from the side walls, or more than 52,000 square feet of its surface. KSC-04pd1767

450 POUNDS COMBUSTION AIR SYSTEM - SYSTEM CODE 304-0000-04AC

Eldora 360 Hall Way - Public Domain image, National Parks Gallery

Wernher von Braun, America Space Program

Nenana Landing, AK, May 27, 2014 -- FEMA logistics is underway moving millions of pounds of building supplies, tractors, and tools to inner Yukon villages. After severe flooding in 2013 inundated the villages of the Yukon, FEMA continues to rebuild during the summer months, coordinating supplies, labor and resources to the disaster survivors. Adam DuBrowa/ FEMA

Eastview Unity Apartments, in the renovated old Fairmont Hotel in Fairmont, West Virginia, is a subsidized apartment complex for the elderly and disabled, with more than 6,400 square feet of commercial space and a ballroom for social and civic functions

Topics

saturn v s ic test stand f 1 test stand construction progress msfc marshall space flight center marshall high resolution test f 1 test s ic f 1 engines f 1 engine test foundation walls s ic static test s ic test west test area test area redstone test diameter saturn v s ic first stage ground level marshall space center construction progress construction pounds structure square feet nasa