visibility Similar

THEMIS SPACECRAFT - Public domain NASA photogrpaph

THEMIS SPACECRAFT - Public domain NASA photogrpaph

CAPE CANAVERAL, Fla. -- In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, STS-127 crew members look at the MAXI (Monitor of All-Sky X-Ray Image), part of the payload for their mission. The crew members are at Kennedy for a crew equipment interface test, or CEIT, which provides experience handling tools, equipment and hardware they will use on the mission. The payload will be launched to the International Space Station aboard space shuttle Endeavour on the STS-127 mission, targeted for launch on May 15, 2009. Photo credit: NASA/Dimitrios Gerondidakis KSC-08pd4031

THEMIS SPACECRAFT - Public domain NASA photogrpaph

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft

The Rover Gets Strong-Armed. NASA public domain image colelction.

HUBBLE SPACE TELESCOPE BATTERY SERVICE

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, STS-123 crew members get a close look at hardware related to the mission. They are at the center for a crew equipment interface test, which allows familiarization with equipment they will use during the mission. Crew members are Commander Dominic Gorie, Pilot Gregory Johnson and Mission Specialists Richard Linnehan, Takao Doi, Robert Behnken, Gerrett Reisman and Michael Foreman. Doi represents the Japan Aerospace Exploration Agency. Reisman will remain on the space station after the mission as a flight engineer for Expedition 16. STS-123 will carry and install one of the components of the Japanese Experiment Module, or JEM. Known as Kibo, the JEM comprises six components: two research facilities -- the Pressurized Module and Exposed Facility; a Logistics Module attached to each of them; a Remote Manipulator System; and an Inter-Orbit Communication System unit. The various components of JEM will be assembled in space over the course of three space shuttle missions. The first of those three missions, STS-123, will carry the Experiment Logistics Module Pressurized Section aboard the space shuttle Endeavour, targeted for launch in February 2008. Photo credit: NASA/Dimitrios Gerondidakis KSC-07pd2833

code Related

LCROSS in Ames clean room N-240- cleaning and wrapping for transfer to Northrup Grumman Redondo Beach, CA where more calibration will be done before finally being sent for mating with the LRO spacecraft (with Steve Ord, Project Management Division (l) and Tony Colaprete (r) LCROSS P.I.) ARC-2008-ACD07-0073-412

LCROSS in Ames clean room N-240- cleaning and wrapping for transfer to Northrup Grumman Redondo Beach, CA where more calibration will be done before finally being sent for mating with the LRO spacecraft (with Steve Ord, Project Management Division (l) and Tony Colaprete (r) LCROSS P.I.) ARC-2008-ACD07-0073-408

LCROSS in Ames clean room N-240- cleaning and wrapping for transfer to Northrup Grumman Redondo Beach, CA where more calibration will be done before finally being sent for mating with the LRO spacecraft (with Steve Ord, Project Management Division (l) and Tony Colaprete (r) LCROSS P.I.) ARC-2008-ACD07-0073-409

LCROSS in Ames clean room N-240- cleaning and wrapping for transfer to Northrup Grumman Redondo Beach, CA where more calibration will be done before finally being sent for mating with the LRO spacecraft (with Steve Ord, Project Management Division (l) and Tony Colaprete (r) LCROSS P.I.) ARC-2008-ACD07-0073-415

LCROSS in Ames clean room N-240- packing into a special made crate for transfer to Northrup Grumman Redondo Beach, CA where more calibration will be done before finally being sent for mating with the LRO spacecraft (Tony Colaprete (r) LCROSS P.I.) ARC-2008-ACD07-0073-451

LCROSS in Ames clean room N-240- wrapping for transfer to Northrup Grumman Redondo Beach, CA where more calibration will be done before finally being sent for mating with the LRO spacecraft (with Steve Ord, Project Management Division (l) and Tony Colaprete (r), LCROSS P.I.) ARC-2008-ACD07-0073-421

LCROSS in Ames clean room N-240- wrapped for transfer to Northrup Grumman Redondo Beach, CA where more calibration will be done before finally being sent for mating with the LRO spacecraft ARC-2008-ACD07-0073-419

LCROSS in Ames clean room N-240- packing and crating for transfer to Northrup Grumman Redondo Beach, CA where more calibration will be done before finally being sent for mating with the LRO spacecraft ARC-2008-ACD07-0073-435

LCROSS in Ames clean room N-240- special made crate for transfer to Northrup Grumman Redondo Beach, CA where more calibration will be done before finally being sent for mating with the LRO spacecraft ARC-2008-ACD07-0073-426

LCROSS in Ames clean room N-240- cleaning and wrapping for transfer to Northrup Grumman Redondo Beach, CA where more calibration will be done before finally being sent for mating with the LRO spacecraft (with Tony Colaprete) ARC-2008-ACD07-0073-404

description

Summary

LCROSS in Ames clean room N-240- cleaning and wrapping for transfer to Northrup Grumman Redondo Beach, CA where more calibration will be done before finally being sent for mating with the LRO spacecraft (with Tony Colaprete)

Nothing Found.

label_outline

Tags

lcross arc dominic hart ames research center ames room room n transfer northrup grumman redondo beach northrup grumman redondo beach calibration lro spacecraft lro spacecraft tony colaprete tony colaprete high resolution nasa
date_range

Date

09/01/2008
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Lro Spacecraft, Tony Colaprete, Northrup Grumman Redondo Beach

Topics

lcross arc dominic hart ames research center ames room room n transfer northrup grumman redondo beach northrup grumman redondo beach calibration lro spacecraft lro spacecraft tony colaprete tony colaprete high resolution nasa