visibility Similar

code Related

Antares Rocket Rollout. NASA public domain image colelction.

description

Summary

The Orbital Sciences Corporation Antares rocket, with the Cygnus spacecraft onboard, is rolled out of the Horizontal Integration Facility (HIF) to make the approximately half-mile journey to launch Pad-0A, Thursday, July 10, 2014, at NASA's Wallops Flight Facility in Virginia. The Antares will launch with the Cygnus spacecraft filled with over 3,000 pounds of supplies for the International Space Station, including science experiments, experiment hardware, spare parts, and crew provisions. The Orbital-2 mission is Orbital Sciences' second contracted cargo delivery flight to the space station for NASA. Photo Credit: (NASA/Aubrey Gemignani)

label_outline

Tags

antares cygnus orbital 2 wallops flight facility wallops island rollout hq nasa aubrey gemignani rocket high resolution rocket engines rocket technology nasa
date_range

Date

10/07/2014
place

Location

Wallops Flight Facility
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Orbital 2, Wallops Flight Facility, Wallops Island

STS-132 ATLANTIS ROLLOUT FROM VAB TO PAD 39A 2010-2919

Cygnus Orbital ATK OA-6 Transport from PHSF to VIF

A Delta II rocket launches from Space Launch Complex Two at Vandenberg AFB, California, in the early morning hours carrying five Iridium satellites into polar orbit on the 11th of February 2002

Orb3 Antares Rollout. NASA public domain image colelction.

Space shuttle Endeavour Lands at LAX

DATE: 1-12-14 LOCATION: Bldg. 30 - FCR-1 (30M/231) SUBJECT: Expedition 38 flight controllers during Orbital Sciences' Cygnus approaching ISS and being grappled. PHOTOGRAPHER: Lauren Harnett jsc2014e005996

Trucks wait to be hoisted out of the hold aboard the vehicle cargo/rapid response ship USNS ANTARES (T-AKR 294) during offloading operations at the Dundalk Marine Terminal. The trucks were used by the 32nd Separate Infantry Brigade (Mechanized), Wisconsin Army National Guard, during Exercise REFORGER '86

CAPE CANAVERAL, Fla. -- Space shuttle Discovery is attached to Launch Pad 39A as the sun rises over NASA's Kennedy Space Center in Florida. It took the spacecraft about six hours to make the journey, known as "rollout," from the Vehicle Assembly Building to the pad. Rollout sets the stage for Discovery's STS-133 crew to practice countdown and launch procedures during the Terminal Countdown Demonstration Test in mid-October. Targeted to liftoff Nov. 1, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the International Space Station. Photo credit: NASA/Jack Pfaller KSC-2010-4736

Antares Orbital-3 Mission. NASA public domain image colelction.

Viking 1 Launch, Cape Canaveral Air Force Station

OA-7 Transport from PHSF to VIF at Pad 41

Space shuttle Space Shuttle Enterprise Demate

Topics

antares cygnus orbital 2 wallops flight facility wallops island rollout hq nasa aubrey gemignani rocket high resolution rocket engines rocket technology nasa