visibility Similar

code Related

A view of construction progress on the site of a new dormitory, set for completion in late 1990 or early 1991

description

Summary

The original finding aid described this photograph as:

Base: Spangdahlem Air Base

State: Rheinland-Pfalz

Country: Deutschland / Germany (DEU)

Scene Camera Operator: TSGT Sorrells

Release Status: Released to Public

Combined Military Service Digital Photographic Files

label_outline

Tags

view construction progress construction progress site dormitory completion spangdahlem air base germany technical sergeant high resolution tsgt sorrells air force base us national archives
date_range

Date

01/05/1990
place

Location

create

Source

The U.S. National Archives
link

Link

https://catalog.archives.gov/
copyright

Copyright info

No known copyright restrictions

label_outline Explore Tsgt Sorrells, Spangdahlem Air Base, Construction Progress

US Army (USA) Corps of Engineers (USACE) Civilian, Billy Sellin (left, center in uniform), Resident Engineer, Balad Air Base (AB) Resident Office, Gulf Region North (GRN), speaks with several civilian subcontractors about the construction progress of the new medical supply warehouse at the Logistical Support Area (LSA) Balad, Balad Air Base (AB), Salah Ad Din Province, Iraq (IRQ), during Operation IRAQI FREEDOM

Oklahoma State University, Boys Dormitory, Northwest corner of Hester Street & Athletic Avenue, Stillwater, Payne County, OK

Before Completion of House of William Larvie - Bureau of Indian Affairs

Two 143-square-meter health clinics are taking shape for the Iraqi Army at Taji Military Base in Iraq. The East Clinic is 75% complete with the crew there installing electrical lights and ceiling tiles. At the West Clinic, floor tiles are being set in place. At both clinics, final grade around the structures is being worked. The $3 million contract was awarded July 7, 2004, with an expected completion date of Aug. 25, 2005. A crew of about 35 Iraqis are working at both projects. Each health clinic will feature five exam rooms and one isolation room. (U.S. Army photo by Norris Jones) (Released)

Farrans Construction started building the estimated thirty-one million dollar, 416 room, one to one dormitory on Royal Air Force, Lakenheath, United Kingdom. A one to one room consists of a separate bedroom and bathroom with a connected kitchen. Construction started on 4 November 1997, estimated completion date is 17 July 2000. (long view)

U.S. Air Force Tech. Sgt. Cameron Green, 470th Air

The US Naval Reserve Readiness Center, located on Lake Union waterfront, after completion of a $1.5 million renovation

CONSTRUCTION PROGRESS AT THE RAC RESEARCH ANALYSIS CENTER BUILDING

Administrative Site - General, National Forest Service photograph.

Rushing the SS George Washington Carver to completion. Negro skilled workers played an important part in the construction of the SS George Washington Carver, second Liberty Ship named for a Negro, in the Richmond Shipyard No. 1 of the Kaiser Company. Mack Hayes, journeyman welder, graduated from the Richmond welding school before beginning work for Kaiser eight months ago

Techwood Homes, McDaniel Dormitory, 581-587 Techwood Drive, Atlanta, Fulton County, GA

New Cafeteria Construction - Construction of new cafeteria, HUD Headquarters: progress views

Topics

view construction progress construction progress site dormitory completion spangdahlem air base germany technical sergeant high resolution tsgt sorrells air force base us national archives