visibility Similar

STS-134 - EOM - Public domain NASA photogrpaph

STS-131 - EOM - Public domain NASA photogrpaph

CAPE CANAVERAL, Fla. – A tugboat pulls the barge transporting the high-fidelity space shuttle model through the turn basin into the Banana River at NASA’s Kennedy Space Center in Florida on its way to Space Center Houston, NASA Johnson Space Center’s official visitor center. The model was built in Apopka, Fla., by Guard-Lee and installed at the Kennedy Space Center Visitor Complex in 1993. The model is expected to arrive June 1 in Houston and to be transported June 3 to Space Center Houston, its final destination, where it will become part of a unique display telling the story of the space shuttle’s achievements and the nationwide team that made them possible. For more information about Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Dimitri Gerondidakis KSC-2012-2984

CAPE CANAVERAL, Fla. – At NASA Kennedy Space Center’s Shuttle Landing Facility in Florida, space shuttle Discovery is shown attached atop the Shuttle Carrier Aircraft, or SCA, in the mate/demate device. Known as the MDD, the devise is a large gantry-like steel structure used to hoist a shuttle off the ground and position it onto the back of the SCA. The SCA is a Boeing 747 jet that was originally manufactured for commercial use and modified by NASA to transport the shuttles between destinations on Earth. This SCA, designated NASA 905, is assigned to the remaining ferry missions, delivering the shuttles to their permanent public display sites. NASA 905 is scheduled to ferry Discovery to the Washington Dulles International Airport in Virginia on April 17, after which the shuttle will be placed on display in the Smithsonian’s National Air and Space Museum, Steven F. Udvar-Hazy Center in Chantilly, Va. For more information on the SCA, visit http://www.nasa.gov/centers/dryden/news/FactSheets/FS-013-DFRC.html. For more information on shuttle transition and retirement activities, visit http://www.nasa.gov/transition. Photo credit: NASA/Dimitri Gerondidakis KSC-2012-2267

STS-133 DISCOVERY GUCP REPAIR PERSONNEL 2010-5571

CAPE CANAVERAL, Fla. – Sunrise at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida finds space shuttle Endeavour secured atop NASA's Shuttle Carrier Aircraft, or SCA. Preparations are under way to roll them away from the mate-demate device surrounding them. The SCA, a modified 747 jetliner, will fly Endeavour to Los Angeles where it will be placed on public display at the California Science Center. This is the final ferry flight scheduled in the Space Shuttle Program era. For more information on the shuttles' transition and retirement, visit http://www.nasa.gov/transition. Photo credit: NASA/Dimitri Gerondidakis KSC-2012-5241

STS103-712-023 - STS-103 - FSS in the payload bay after release of HST

Inside Orbiter Processing Facility bay 3, Atlantis is ready for rollover to the Vehicle Assembly Building. In the VAB it will be raised to vertical and lifted up and into high bay 3 for stacking with its external tank and solid rocket boosters. Atlantis will fly on mission STS-98, the seventh construction flight to the International Space Station. The orbiter will carry in its payload bay the U.S. Laboratory, named Destiny, that will have five system racks already installed inside of the module. After delivery of electronics in the lab, electrically powered attitude control for Control Moment Gyroscopes will be activated. Atlantis is scheduled for launch on Jan. 18, 2001, at 2:44 a.m. EST, with a crew of five KSC-00pp1823

STS-127 - EOM - Public domain NASA photogrpaph

code Related

Shuttle Replica (High Fidelity) from Turn Basin thru Port going to Texas 2012-2984

description

Summary

Shuttle Replica (High Fidelity) from Turn Basin thru Port going to Texas

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Nothing Found.

label_outline

Tags

kennedy space center replica shuttle replica high fidelity high fidelity basin thru port basin thru port texas space shuttle high resolution nasa
date_range

Date

24/05/2012
collections

in collections

Space Shuttle Program

place

Location

Kennedy Space Center / Cape Canaveral Air Force Station Fire Station 2 ,  28.52650, -80.67093
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Basin Thru Port, Shuttle Replica, Fidelity

Sailors and Marines aboard High Speed Vessel Swift (HSV 2) launch a small boat during a Southern Partnership Station 2010 training exercise.

[The Danny Kaye Show, Carter Barron Amphitheater, July 17th thru July 30th, 1961]

Peruvian sailors observe proper handcuffing techniques during a week-long training provided by a security subject matter expert team embarked aboard High Speed Vessel Swift (HSV 2)

FIFTIETH ANNIVERSARY DINNER [held by] FIDELITY LODGE NO. 120 [at] "FAIRMONT HOTEL, SAN FRANCISCO, CA" (HOTEL;)

ENSIGN Jorge Parra, communications officer for the USS LAKE CHAMPLAIN (CG-57), discusses ship board operations with junior Reserve Officers Training Candidate (ROTC) students from Orange Glen and Escondido High Schools during a tour of the USS LAKE CHAMPLAIN (CG-57) at the 32nd St. Naval Base. In addition, he discussed the educational opportunities available and the commissioning programs the Navy can offer young Hispanics

S126E009602 - STS-126 - Time Lapse Photography of Kibo and Port Truss

High oblique view of Naval Base Guantanamo Bay looking southwest. Vessels in port include (left to right) the guided missile destroyer USS DALGREN (DDG-43) and a Spruance class destroyer moored at pier L, the guided missile destroyer USS FARRAGUT (DDG-37) moored at pier A and the guided missile cruiser USS WAINRIGHT (CG-28) and the Venezuelan frigate GENERAL SOUBLETTE (F-24) moored at wharf B

COAST GUARD CUTTER MELLON, SEATTLE, WASHINGTON

Friendship replica, Salem Maritime National Historic Site, 2012.

A port bow view of the nuclear-powered aircraft carrier USS THEODORE ROOSEVELT (CVN 71) during its launching ceremony at Newport News Shipbuilding and Drydock Company. To the left is a replica of the sailing ship "Godspeed"

STS082-377-010 - STS-082 - Flight deck documentation during STS-82 mission

Mineman 1st Class April Morehouse assigned to the High Speed Vessel (HSV) 2 Swift prepares to load medical supplies that were donated by Project Handclasp.

Topics

kennedy space center replica shuttle replica high fidelity high fidelity basin thru port basin thru port texas space shuttle high resolution nasa