visibility Similar

code Related

STS-133 PMM Insulation Blankets Installation 2010-4551

description

Summary

STS-133 PMM Insulation Blankets Installation

Nothing Found.

label_outline

Tags

kennedy space center sts pmm insulation blankets installation pmm insulation blankets installation high resolution nasa
date_range

Date

01/09/2010
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Blankets, Insulation, Pmm

SMALL TEST FACILITY IN INSULATION ASSEMBLY AREA

SPIN RIG FOR MODEL TESTING INSTALLATION

STS081-376-025 - STS-081 - Antenna and insulation on Mir space station Kristall module

STS103-710-025 - STS-103 - 7th EVA - FGS replacement and installation

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, members of the STS-124 crew get a close look at equipment on the Japanese Experiment Module, called Kibo, including the Remote Manipulator System, or RMS, two robotic arms that support operations on the outside of the Kibo. Crew members are at Kennedy for a crew equipment interface test that includes familiarization with tools and equipment that will be used on the mission. The STS-124 mission is the second of three flights that will launch components to complete the Japanese pressurized module, the Kibo laboratory. The mission will include two spacewalks to install the new lab and its remote manipulator system. The lab's logistics module, which will have been installed in a temporary location during STS-123, will be attached to the new lab. Photo credit: NASA/Kim Shiflett KSC-08pd0058

ION THRUSTER INSTALLATION AND FACILITY

STS103-714-085 - STS-103 - 15th EVA - Nicollier and Foale perform 486 installation

STS082-325-002 - STS-082 - HST, documentation of the Multilayer Insulation (MLI) patches on the telescope

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility at NASA's Kennedy Space Center, STS-115 Mission Specialist Daniel Burbank is practicing folding a sequential shunt unit launch to activation multilayer installation blanket. Burbank and other crew members are at the center for Crew Equipment Interface Test activities. Equipment familiarization is a routine part of astronaut training and launch preparations. The mission will deliver the second port truss segment, the P3/P4 Truss, to attach to the first port truss segment, the P1 Truss, as well as deploy solar array set 2A and 4A. Launch on Space Shuttle Atlantis is scheduled for late August. Photo credit: NASA/Kim Shiflett KSC-06pd1181

STS103-710-034 - STS-103 - 16th EVA - FGS replacement and installation

STS061-94-061 - STS-061 - Astronauts Akers and Thornton during installation of COSTAR on HST

S129E007210 - STS-129 - View of ELC2 installation on the S3 Truss

Topics

kennedy space center sts pmm insulation blankets installation pmm insulation blankets installation high resolution nasa