The war demonstration hospital - its plan and construction (1917) (14594157648)
Zusammenfassung
Identifier: 53410800R.nlm.nih.gov
Title: The war demonstration hospital : its plan and construction
Year: 1917 (1910s)
Authors: Rockefeller Institute for Medical Research, author
Subjects: Hospitals, Military Hospital Design and Construction
Publisher:
Contributing Library: U.S. National Library of Medicine
Digitizing Sponsor: Open Knowledge Commons, U.S. National Library of Medicine
Text Appearing Before Image:
-ings are used. Connecting corridors at a base hospitalwould naturally not be closed, and in mostcases would not be covered, but the slatwalk connecting all buildings by inclinesand without steps should always bepresent. The portable ice machine installed in thetemporary hospital is, as has been said,like those which are being shipped abroadfor use in base hospitals. Ice for fieldhospitals would doubtless be distributedfrom a base rather than manufactured onthe spot. The electric installation would of course be the same for the lield as forthe base hospital, including X-Rayequipment. Time ofCoiistrurlion The erection of the Rockefeller Hos-pital was commenced on June 1st, andthe buildings completed ready for occu-pancy by July 13th. This result wasachieved in six weeks due to the intelli-gent handling of the work by the generalcontractors, and the hearty co-operationof each and every trade employed onthe work. The record shows how quicklythis form of construction can behandled. ( 22 )
Text Appearing After Image:
Manujoctutta eyAYLORD BROS. IiwSyr.cu.e, N. Y.Stockton, Calif.
- White GRC Architectural Column - IndiaMART
- GRC Grill, For Decoration, Size: 10x4 Feet - IndiaMART
- Rectangular GRC Jali - IndiaMART
- White GRC Jali, For Wall Decoration - IndiaMART
- White GRC Jali, For Decoration, Size: 4x1.5 Feet - IndiaMART
- Decoration GRC Jali, Size: 4x2.5 Feet - IndiaMART
- White GRC Jali, For Decoration, Size: 4x1.5 Feet - IndiaMART