visibility Similar

191210-N-QR336-1208 NARRA, Palawan (Dec. 10, 2019)

Colt Fire Arms Company, East Armory Building, 36-150 Huyshope Avenue, 17-170 Van Dyke Avenue, 49 Vredendale Avenue, Hartford, Hartford County, CT

U.S. Air Force Airmen from the 823rd Expeditionary

Equipment Operator 2nd Class Carlos Guzman cuts rebar to create a well covering at a local school.

Cowboy dishing up chili at noonday dinner. Cattle ranch near Marfa, Texas

S Air Force (USAF) STAFF Sergeant (SSGT) Andy Franks, (left), and USAF AIRMAN (AMN) Harold Neal Jr. (right), both assigned to the 100th Civil Engineering Squadron (CES), work with a Republic of Uganda Army Soldier to pour wet cement for the floor of a kitchen being built in Soroti, Uganda, during Exercise MEDFLAG 2002. MEDFLAG is a US European Command multinational multi-service medical exercise designed to provide care, training and disaster management for Doctors, Nurses, and Technicians in different countries around the world

KENNEDY SPACE CENTER, FLA. -- Quality inspectors with NASA and Lockheed Martin examine a red-line drawing of foam placement on space shuttle Atlantis's external tank (in front of them) to verify the foam insulation that was reapplied. The foam covers the feed-through engine cut-off, or ECO, sensor connector. The foam was removed to enable engineers to remove and replace the ECO sensor connector on the tank. The feed-through connector passes the wires from the inside of the tank to the outside. Results of a tanking test on Dec. 18 pointed to an open circuit in the feed-through connector wiring, which is located at the base of the tank. The pins in the replacement connector were precisely soldered to create a connection that allows sensors inside the tank to send signals to the computers onboard Atlantis. The repair work was done on Atlantis while the shuttle has been on Launch Pad 39A at NASA's Kennedy Space Center. The launch date for the shuttle's STS-122 mission has now been targeted for Feb. 7. Photo credit: NASA/Cory Husten KSC-08pd0078

Opnamen badschonen ( Pin Up ), Bestanddeelnr 907-3421

Old Control Room Cable & Old Racks Removal 2012-2601

code Related

Kanonenerneuerungsprojekt - März 2017 (33742964805)

description

Zusammenfassung

Phase 1 des Cannon Renewal Project begann im Januar 2017 und soll im November 2018 abgeschlossen sein. Die gesamte Westseite des Gebäudes, vom Keller bis zum fünften Stock, ist geschlossen. Die Arbeiten umfassen den Abbruch und Wiederaufbau der fünften Etage, die Erhaltung des äußeren Mauerwerks und die Sanierung der einzelnen Büroräume. Vollständige Projektdetails unter www.aoc.gov / cannon.

label_outline

Tags

Kapitol Washington, D.C Kanonenerneuerungsprojekt Bilder des Architekten des Kapitols hohe Auflösung Konstruktion Auftragnehmer Bauen & Konstruktion
date_range

Datum

30/03/2017
create

Quelle

Cannon Renewal Project - March 2017
link

Link

https://www.aoc.gov/
copyright

Copyright-info

public domain

label_outline Explore Cannon Renewal Project, Images Of The Architect Of The Capitol, Capitol

Themen

Kapitol Washington, D.C Kanonenerneuerungsprojekt Bilder des Architekten des Kapitols hohe Auflösung Konstruktion Auftragnehmer Bauen & Konstruktion