visibility Similar

Tennessee Valley Authority power and conservation. Fort Loudoun Dam construction. Placing a structural member for the cofferdam at the new Fort Loudoun Dam, furthest upstream of the TVA's main Tennessee River projects. Scheduled for closure and first storage of water early in 1943, this dam will create a 15,000-acre lake reaching fifty-five miles upstream to the city of Knoxville. The reservoir will have a useful storage capacity of 126,000 acre-feet. Power installation of 64,000 kilowatts is authorized, with a possible ultimate of 96,000 kilowatts. Note safety precautions in the form of life preservers strapped to the backs of these workers

Tennessee Valley Authority power and conservation. Fort Loudoun Dam construction. Placing a structural member for the cofferdam at the new Fort Loudoun Dam, furthest upstream of the TVA's main Tennessee River projects. Scheduled for closure and first storage of water early in 1943, this dam will create a 15,000-acre lake reaching fifty-five miles upstream to the city of Knoxville. The reservoir will have a useful storage capacity of 126,000 acre-feet. Power installation of 64,000 kilowatts is authorized, with a possible ultimate of 96,000 kilowatts. Note safety precautions in the form of life preservers strapped to the backs of these workers

From left, Seaman Andranette Cuffe andPetty Officer

170629-N-BH414-066 HALIFAX, Nova Scotia (June 29,

Sailors from Naval Mobile Construction Battalion (NMCB)

U.S. Navy Seabees assigned to Naval Mobile Construction

Flooding ^ Hurricane/Tropical Storm - Prattsville, N. Y. , Jan. 24, 2012 -- Contractors work to place Temporary Housing Units on house pads for flood damage survivors. FEMA plays a vital role supporting State, Tribal and local governments as they respond to the impacts of Hurricane Irene. Hans Pennink/FEMA

Builder Constructionman Carrie Ernst, assigned to Echo

U.S. Army Reserve Soldiers from the 983rd Engineering

code Related

Kanonenerneuerungsprojekt - März 2017 (33586393242)

description

Zusammenfassung

Phase 1 des Cannon Renewal Project begann im Januar 2017 und soll im November 2018 abgeschlossen sein. Die gesamte Westseite des Gebäudes, vom Keller bis zum fünften Stock, ist geschlossen. Die Arbeiten umfassen den Abbruch und Wiederaufbau der fünften Etage, die Erhaltung des äußeren Mauerwerks und die Sanierung der einzelnen Büroräume. Vollständige Projektdetails unter www.aoc.gov / cannon.

label_outline

Tags

Kapitol Washington, D.C Kanonenerneuerungsprojekt Bilder des Architekten des Kapitols hohe Auflösung Zimmerleute Auftragnehmer Bauen & Konstruktion
date_range

Datum

30/03/2017
create

Quelle

Cannon Renewal Project - March 2017
link

Link

https://www.aoc.gov/
copyright

Copyright-info

public domain

label_outline Explore Cannon Renewal Project, Images Of The Architect Of The Capitol, Capitol

Themen

Kapitol Washington, D.C Kanonenerneuerungsprojekt Bilder des Architekten des Kapitols hohe Auflösung Zimmerleute Auftragnehmer Bauen & Konstruktion