Diese Seite ist nicht vollständig übersetzt. Klicken Sie auf die Schaltfläche Übersetzen, um die neueste übersetzte Version zu laden.

visibility Similar

code Related

Bulletin (1910) (14794016503) - Public domain map

description

Zusammenfassung

Identifier: bulletin88unit (find matches)

Title: Bulletin

Year: 1910 (1910s)

Authors: United States. Bureau of Mines

Subjects: Mines and mineral resources Mines and mineral resources Mining engineering

Publisher: Washington U.S. Govt. Print. Off. (etc.)

Contributing Library: Gerstein - University of Toronto

Digitizing Sponsor: University of Toronto

View Book Page: Book Viewer

About This Book: Catalog Entry

View All Images: All Images From Book

Click here to view book online to see this illustration in context in a browseable online version of this book.

Text Appearing Before Image:

ubic feet perminute. or 2,056,564 cubic feet of gas in 24 hours. Using the same data but referring them to the approximate values given in the tableon page 39, one finds the quantity of gas to be 2,103,185 cubic feet in 24 hours. Thedifference is 46,621 cubic feet, or 2.3 per cent of the first value. Example 2.Suppose a water-gage reading of 0.3 inch on a 6-inch pipe at 60° F. and 14.65 poundsper square inch, the specific gravity of the gas being 0.6. Proceeding as in the first example, according to the formula: Q=(5773.68)X1963^j-fgl2 ©

Text Appearing After Image:

R e iEiaHxaHHVJ saaaoaa ni htv ao aanivaadKaii 44 CONDENSATION OF GASOLINE FKOM NATURAL GAS. Example 3. Suppose a water-gage reading of 0.3 inch on a 1-inch pipe at 60° F. and 14.65 poundsper square inch, the specific gravity of the gas being 0.60. From the table on page 39 the cubic feet of gas per 24 hours is found to be 20,568. Ifthe more exact formula be used, the quantity of natural gas per 24 hours is found to be21,824. The difference is 1,256, or 5.8 per cent. These three examples will serve to show the errors involved in gasmeasurement by means of the Pitot tube when the static pressure ofthe gas is not measured. As regards the measurement of a gas flow on a lease for the purpose of determiningthe quantity available for gasolinemaking, the use of the more simpleform of Pitot tube appears to besatisfactory. 100 95 H M §90 2 a< ft oq ws ft 85 80 75 70 65 60 GENERAL COMMENTS ON USE OFPITOT TUBE. 55 0.0362 0.0361 0.0360 0.0359 0.0358 WEIGHT OF WATER IN POUNDSPER CUBIC INCH Fi

Note About Images

Please note that these images are extracted from scanned page images that may have been digitally enhanced for readability - coloration and appearance of these illustrations may not perfectly resemble the original work.

label_outline

Tags

Bulletin des United States Bureau of Mines 1910 Buchillustrationen Maschinenbau Minen und Bodenschätze Geologie hohe Auflösung
date_range

Datum

1910
create

Quelle

University of Toronto
link

Link

http://commons.wikimedia.org/
copyright

Copyright-info

public domain

label_outline Explore Bulletin By United States Bureau Of Mines 1910

Themen

Bulletin des United States Bureau of Mines 1910 Buchillustrationen Maschinenbau Minen und Bodenschätze Geologie hohe Auflösung