multi purpose

1,200 media by topicpage 1 of 12
KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, an overhead crane carries the Integrated Truss Structure S0 to the payload canister which will transport it to the launch pad for mission STS-110.  Seen below the truss is the Multi-Purpose Logistics Module Donatello, currently not in use. The S0 truss will be part of the payload on Space Shuttle Atlantis. The S0 truss will be attached to the U.S. Lab, "Destiny,"  on the 11-day mission, becoming the backbone of the orbiting International Space Station (ISS). Launch is scheduled for April 4 KSC-02pd0344

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building,...

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, an overhead crane carries the Integrated Truss Structure S0 to the payload canister which will transport it to the launch pad for mission S... More

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility,  the Multi-Purpose Logistics Module Donatello is slowly lowered toward a work stand.  Previously housed in the Operations and Checkout Building, Donatello was brought into the SSPF for routine testing.  This is the first time all three MPLMs (Donatello, Raffaello and Leonardo) are in the SSPF.  The MPLMs were built by the Italian Space Agency, to serve as reusable logistics carriers and the primary delivery system to resupply and return station cargo requiring a pressurized environment.  The third MPLM, Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility,...

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, the Multi-Purpose Logistics Module Donatello is slowly lowered toward a work stand. Previously housed in the Operations and Checkout Buil... More

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility,  workers help the Multi-Purpose Logistics Module Donatello settle onto a work stand.  Previously housed in the Operations and Checkout Building, Donatello was brought into the SSPF for routine testing.  This is the first time all three MPLMs (Donatello, Raffaello and Leonardo) are in the SSPF.  The MPLMs were built by the Italian Space Agency, to serve as reusable logistics carriers and the primary delivery system to resupply and return station cargo requiring a pressurized environment.  The third MPLM, Raffaello, is scheduled to fly on Space Shuttle Atlantis on mission STS-114.

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility,...

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, workers help the Multi-Purpose Logistics Module Donatello settle onto a work stand. Previously housed in the Operations and Checkout Buil... More

Viewed from above in the Space Station Processing Facility are equipment and several future payloads on Shuttle missions to the International Space Station. At left near the front is the Integrated Electronics Assembly. Near the opposite end, under the large windows is the Multi-Purpose Logistics Module Donatello. On the right, center, is the P3 truss. Behind it are the airlock and another MPLM, Raffaello. The large windows on the left wall give visitors on bus tours a look at operations during the day KSC-01pp0675

Viewed from above in the Space Station Processing Facility are equipme...

Viewed from above in the Space Station Processing Facility are equipment and several future payloads on Shuttle missions to the International Space Station. At left near the front is the Integrated Electronics ... More

KENNEDY SPACE CENTER, FLA. - The Multi-Purpose Logistics Module Donatello is suspended by cables over the payload canister in the Space Station Processing Facility.  Previously housed in the Operations and Checkout Building, Donatello was brought into the SSPF for routine testing.  This is the first time all three MPLMs (Donatello, Raffaello and Leonardo) are in the SSPF.  The MPLMs were built by the Italian Space Agency, to serve as reusable logistics carriers and the primary delivery system to resupply and return station cargo requiring a pressurized environment.  The third MPLM, Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.

KENNEDY SPACE CENTER, FLA. - The Multi-Purpose Logistics Module Donate...

KENNEDY SPACE CENTER, FLA. - The Multi-Purpose Logistics Module Donatello is suspended by cables over the payload canister in the Space Station Processing Facility. Previously housed in the Operations and Chec... More

KENNEDY SPACE CENTER, FLA. - Workers in the Space Station Processing Facility prepare to release the overhead crane from the Multi-Purpose Logistics Module Raffaello now secure on a new work stand.  Raffaello is the second MPLM built by the Italian Space Agency, serving as a reusable logistics carrier and primary delivery system to resupply and return station cargo requiring a pressurized environment.  It has been moved to allow the third MPLM, Donatello, to be brought in for routine testing.  Donatello has been stored in the Operations and Checkout Building.  This is the first time all three MPLMs are in the SSPF; the other one is the Leonardo.  Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.

KENNEDY SPACE CENTER, FLA. - Workers in the Space Station Processing F...

KENNEDY SPACE CENTER, FLA. - Workers in the Space Station Processing Facility prepare to release the overhead crane from the Multi-Purpose Logistics Module Raffaello now secure on a new work stand. Raffaello i... More

KENNEDY SPACE CENTER, FLA. - Overhead cables carry the Multi-Purpose Logistics Module Donatello from the payload canister (lower right) to a work stand in the Space Station Processing Facility.  Previously housed in the Operations and Checkout Building, Donatello was brought into the SSPF for routine testing.  This is the first time all three MPLMs (Donatello, Raffaello and Leonardo) are in the SSPF.  The MPLMs were built by the Italian Space Agency, to serve as reusable logistics carriers and the primary delivery system to resupply and return station cargo requiring a pressurized environment.  The third MPLM, Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.

KENNEDY SPACE CENTER, FLA. - Overhead cables carry the Multi-Purpose L...

KENNEDY SPACE CENTER, FLA. - Overhead cables carry the Multi-Purpose Logistics Module Donatello from the payload canister (lower right) to a work stand in the Space Station Processing Facility. Previously hous... More

KENNEDY SPACE CENTER, FLA. - The Multi-Purpose Logistics Module Donatello is moved away from the payload canister in the Space Station Processing Facility.  Previously housed in the Operations and Checkout Building, Donatello was brought into the SSPF for routine testing.  This is the first time all three MPLMs (Donatello, Raffaello and Leonardo) are in the SSPF.  The MPLMs were built by the Italian Space Agency, to serve as reusable logistics carriers and the primary delivery system to resupply and return station cargo requiring a pressurized environment.  The third MPLM, Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.

KENNEDY SPACE CENTER, FLA. - The Multi-Purpose Logistics Module Donate...

KENNEDY SPACE CENTER, FLA. - The Multi-Purpose Logistics Module Donatello is moved away from the payload canister in the Space Station Processing Facility. Previously housed in the Operations and Checkout Buil... More

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility,  workers confirm the Multi-Purpose Logistics Module Donatello is safely in place on a work stand.  Previously housed in the Operations and Checkout Building, Donatello was brought into the SSPF for routine testing.  This is the first time all three MPLMs (Donatello, Raffaello and Leonardo) are in the SSPF.  The MPLMs were built by the Italian Space Agency, to serve as reusable logistics carriers and the primary delivery system to resupply and return station cargo requiring a pressurized environment.  The third MPLM, Raffaello, is scheduled to fly on Space Shuttle Atlantis on mission STS-114.

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility,...

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, workers confirm the Multi-Purpose Logistics Module Donatello is safely in place on a work stand. Previously housed in the Operations and ... More

KENNEDY SPACE CENTER, FLA. - Workers on the floor of the Space Station Processing Facility watch as overhead cables carry the Multi-Purpose Logistics Module Donatello to a work stand.  Previously housed in the Operations and Checkout Building, Donatello was brought into the SSPF for routine testing.  This is the first time all three MPLMs (Donatello, Raffaello and Leonardo) are in the SSPF.  The MPLMs were built by the Italian Space Agency, to serve as reusable logistics carriers and the primary delivery system to resupply and return station cargo requiring a pressurized environment.  The third MPLM, Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.

KENNEDY SPACE CENTER, FLA. - Workers on the floor of the Space Station...

KENNEDY SPACE CENTER, FLA. - Workers on the floor of the Space Station Processing Facility watch as overhead cables carry the Multi-Purpose Logistics Module Donatello to a work stand. Previously housed in the ... More

KENNEDY SPACE CENTER, FLA. - An overhead crane is attached to the Multi-Purpose Logistics Module Raffaello in order to move it to another work stand in the Space Station Processing Facility.  Raffaello is the second MPLM built by the Italian Space Agency, serving as a reusable logistics carrier and primary delivery system to resupply and return station cargo requiring a pressurized environment.  It is being moved to allow the third MPLM, Donatello, to be brought in for routine testing.  Donatello has been stored in the Operations and Checkout Building.  This is the first time all three MPLMs are in the SSPF; the other one is the Leonardo.  Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.

KENNEDY SPACE CENTER, FLA. - An overhead crane is attached to the Mult...

KENNEDY SPACE CENTER, FLA. - An overhead crane is attached to the Multi-Purpose Logistics Module Raffaello in order to move it to another work stand in the Space Station Processing Facility. Raffaello is the s... More

KENNEDY SPACE CENTER, FLA. - Workers in the Space Station Processing Facility secure the Multi-Purpose Logistics Module Raffaello onto a new work stand.  Raffaello is the second MPLM built by the Italian Space Agency, serving as a reusable logistics carrier and primary delivery system to resupply and return station cargo requiring a pressurized environment.  It has been moved to allow the third MPLM, Donatello, to be brought in for routine testing.  Donatello has been stored in the Operations and Checkout Building.  This is the first time all three MPLMs are in the SSPF; the other one is the Leonardo.  Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.

KENNEDY SPACE CENTER, FLA. - Workers in the Space Station Processing F...

KENNEDY SPACE CENTER, FLA. - Workers in the Space Station Processing Facility secure the Multi-Purpose Logistics Module Raffaello onto a new work stand. Raffaello is the second MPLM built by the Italian Space ... More

KENNEDY SPACE CENTER, FLA. - The Multi-Purpose Logistics Module Raffaello moves away from its stand in the Space Station Processing Facility.  Raffaello is the second MPLM built by the Italian Space Agency, serving as a reusable logistics carrier and primary delivery system to resupply and return station cargo requiring a pressurized environment.  It is being moved to allow the third MPLM, Donatello, to be brought in for routine testing.  Donatello has been stored in the Operations and Checkout Building.  This is the first time all three MPLMs are in the SSPF; the other one is the Leonardo.  Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.

KENNEDY SPACE CENTER, FLA. - The Multi-Purpose Logistics Module Raffae...

KENNEDY SPACE CENTER, FLA. - The Multi-Purpose Logistics Module Raffaello moves away from its stand in the Space Station Processing Facility. Raffaello is the second MPLM built by the Italian Space Agency, ser... More

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, the Multi-Purpose Logistics Module Raffaello glides above the floor as it moves to another stand on the other side.  Raffaello is the second MPLM built by the Italian Space Agency, serving as a reusable logistics carrier and primary delivery system to resupply and return station cargo requiring a pressurized environment.  It is being moved to allow the third MPLM, Donatello, to be brought in for routine testing.  Donatello has been stored in the Operations and Checkout Building.  This is the first time all three MPLMs are in the SSPF; the other one is the Leonardo.  Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility,...

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, the Multi-Purpose Logistics Module Raffaello glides above the floor as it moves to another stand on the other side. Raffaello is the secon... More

KENNEDY SPACE CENTER, FLA. - Workers watch as the Multi-Purpose Logistics Module Raffaello is lowered toward a work stand in the Space Station Processing Facility.  Raffaello is the second MPLM built by the Italian Space Agency, serving as a reusable logistics carrier and primary delivery system to resupply and return station cargo requiring a pressurized environment.  It has been moved across the floor to allow the third MPLM, Donatello, to be brought in for routine testing.  Donatello has been stored in the Operations and Checkout Building.  This is the first time all three MPLMs are in the SSPF; the other one is the Leonardo.  Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.

KENNEDY SPACE CENTER, FLA. - Workers watch as the Multi-Purpose Logist...

KENNEDY SPACE CENTER, FLA. - Workers watch as the Multi-Purpose Logistics Module Raffaello is lowered toward a work stand in the Space Station Processing Facility. Raffaello is the second MPLM built by the Ita... More

KENNEDY SPACE CENTER, FLA. - The Multi-Purpose Logistics Module Raffaello is lifted from its stand in the Space Station Processing Facility to move to another work stand.  Raffaello is the second MPLM built by the Italian Space Agency, serving as a reusable logistics carrier and primary delivery system to resupply and return station cargo requiring a pressurized environment.  It is being moved to allow the third MPLM, Donatello, to be brought in for routine testing.  Donatello has been stored in the Operations and Checkout Building.  This is the first time all three MPLMs are in the SSPF; the other one is the Leonardo.  Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.

KENNEDY SPACE CENTER, FLA. - The Multi-Purpose Logistics Module Raffae...

KENNEDY SPACE CENTER, FLA. - The Multi-Purpose Logistics Module Raffaello is lifted from its stand in the Space Station Processing Facility to move to another work stand. Raffaello is the second MPLM built by ... More

KENNEDY SPACE CENTER, FLA. - A worker on the floor watches as the Multi-Purpose Logistics Module Raffaello moves toward another work stand in the Space Station Processing Facility.  Raffaello is the second MPLM built by the Italian Space Agency, serving as a reusable logistics carrier and primary delivery system to resupply and return station cargo requiring a pressurized environment.  It has been moved across the floor to allow the third MPLM, Donatello, to be brought in for routine testing.  Donatello has been stored in the Operations and Checkout Building.  This is the first time all three MPLMs are in the SSPF; the other one is the Leonardo.  Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.

KENNEDY SPACE CENTER, FLA. - A worker on the floor watches as the Mult...

KENNEDY SPACE CENTER, FLA. - A worker on the floor watches as the Multi-Purpose Logistics Module Raffaello moves toward another work stand in the Space Station Processing Facility. Raffaello is the second MPLM... More

Mill Valley Air Force Station, Multi-Purpose Building, East Ridgecrest Boulevard, Mount Tamalpais, Mill Valley, Marin County, CA

Mill Valley Air Force Station, Multi-Purpose Building, East Ridgecrest...

Survey number: HABS CA-2615-M Building/structure dates: 1951 Initial Construction

KENNEDY SPACE CENTER, FLA. -  STS-114 Mission Specialist Soichi Noguchi is helped by the Closeout Crew with his launch and entry suit before entering Space Shuttle Discovery.  This is Noguchi’s first Shuttle flight.  He represents the Japan Aerospace Exploration Agency. The Return to Flight mission to the International Space Station carries the External Stowage Platform-2, equipped with spare part assemblies, and a replacement Control Moment Gyroscope contained in the Lightweight Multi-Purpose Experiment Support Structure and Multi-Purpose Logistics Module Raffaello, housing 15 tons of hardware and supplies that will be transferred to the Station after the Shuttle docks to the complex .  On this mission, the crew will perform inspections on-orbit for the first time of all of the Reinforced Carbon-Carbon (RCC) panels on the leading edge of the wings and the Thermal Protection System tiles using the new Canadian-built Orbiter Boom Sensor System and the data from 176 impact and temperature sensors. Mission Specialists will also practice repair techniques on RCC and tile samples during a spacewalk in the payload bay. KSC-05pp1797

KENNEDY SPACE CENTER, FLA. - STS-114 Mission Specialist Soichi Noguch...

KENNEDY SPACE CENTER, FLA. - STS-114 Mission Specialist Soichi Noguchi is helped by the Closeout Crew with his launch and entry suit before entering Space Shuttle Discovery. This is Noguchi’s first Shuttle fl... More

KENNEDY SPACE CENTER, FLA. -- Technicians unload the replacement wrist joint for the Space Station Remote Manipulator System before installing it in Space Shuttle Endeavour's payload bay. The new wrist joint, called an Orbital Replacement Unit (ORU), will be installed next to the arm's Latching End Effector during the final of three planned spacewalks. Mission STS-111 is designated UF-2, the 14th assembly flight to the International Space Station. Endeavour's payload includes the Multi-Purpose Logistics Module Leonardo and Mobile Base System. The mission also will swap resident crews on the Station, carrying the Expedition 5 crew and returning to Earth Expedition 4. Liftoff of Endeavour is scheduled between 4 and 8 p.m. May 30, 2002 KSC-02pd0640

KENNEDY SPACE CENTER, FLA. -- Technicians unload the replacement wrist...

KENNEDY SPACE CENTER, FLA. -- Technicians unload the replacement wrist joint for the Space Station Remote Manipulator System before installing it in Space Shuttle Endeavour's payload bay. The new wrist joint, c... More

KENNEDY SPACE CENTER, FLA. --  In the Space Station Processing Facility, STS-122 crew members inspect the Columbus European Laboratory, part of the payload on their mission.  Seen here is Commander Steve Frick. The crew is participating in a crew equipment interface test that provides opportunities for hands-on experience with payloads and equipment.  The other crew members are Pilot Alan Poindexter and Mission Specialists Rex Walheim, Stan Love, Leland Melvin and Hans Schlegel, who represents the European Space Agency. The 24th mission to the International Space Station, STS-122 will also include the Multi-Purpose Experiment Support Structure - Non-Deployable (MPESS-ND). Launch of STS-122 on Space Shuttle Discovery is scheduled no earlier than October. Photo credit: NASA/Kim Shiflett KSC-07pd0058

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facilit...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, STS-122 crew members inspect the Columbus European Laboratory, part of the payload on their mission. Seen here is Commander Steve Frick.... More

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Discovery begins rolling into the fog that shrouds Kennedy Space Center. Discovery is on its way from the Vehicle Assembly Building to Launch Pad 39B and mission STS-102 to the International Space Station. Its payload is the Multi-Purpose Logistics Module Leonardo, a “moving van,” to carry laboratory racks filled with equipment, experiments and supplies to and from the Space Station aboard the Space Shuttle. The flight will also carry the Expedition Two crew up to the Space Station, replacing Expedition One, who will return to Earth on Discovery.  Launch is scheduled for March 8 at 6:45 a.m. EST KSC01padig067

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Discovery begins rolling i...

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Discovery begins rolling into the fog that shrouds Kennedy Space Center. Discovery is on its way from the Vehicle Assembly Building to Launch Pad 39B and mission STS-... More

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service Structure on Launch Pad 39B, Space Shuttle Endeavour is bathed in light.  Twin solid rocket boosters flank the orange external tank behind Endeavour.  Above the external tank is the Gaseous Oxygen Vent Arm that vents gaseous oxygen vapors away from the Shuttle.  The vent hood assembly at the end is often referred to as the "beanie cap."  Stretching to the crew hatch on the side of Endeavour is the Orbiter Access Arm with its environmentally controlled White Room at the end, through which the crew enters the vehicle.  The Shuttle sits on the Mobile Launcher Platform with the two service tail masts on either side of the main engines.  The tail masts support the fluid, gas and electrical requirements of the orbiter's liquid oxygen and liquid hydrogen aft T-0 umbilicals.  Each tail mast is 31 feet (9.4 meters) high, 15 feet (4.6 meters) long and 9 feet (3.1 meters) wide.   Endeavour is scheduled to launch on mission STS-108 Dec. 4 at 5:45  p.m. EST.  On this 12th flight to the International Space Station, known as a Utilization Flight, Endeavour will carry a crew of four plus the Expedition 4 crew, who will replace Expedition 3 aboard the ISS.  The payload includes the Multi-Purpose Logistics Module Raffaello, filled with supplies, equipment and experiments KSC01PD1763

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service S...

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service Structure on Launch Pad 39B, Space Shuttle Endeavour is bathed in light. Twin solid rocket boosters flank the orange external tank behind En... More

KENNEDY SPACE CENTER, FLA. -- Workers at SPACEHAB gather to watch STS-102 Mission Specialist Andrew S.W. Thomas work on the Early Ammonia Servicer. Thomas and other crew members are at SPACEHAB to get acquainted with tools and equipment they will be using on their mission to the International Space Station. The second spacewalk of the mission will require the crew to transfer the Early Ammonia Servicer to the P6 truss. STS-102 is the 8th construction flight to the International Space Station and will carry the Multi-Purpose Logistics Module Leonardo. On that flight, Leonardo will be filled with equipment and supplies to outfit the U.S. laboratory module Destiny. The mission will also be carrying the Expedition Two crew to the Space Station, replacing the Expedition One crew who will return on Shuttle Discovery. STS-102 is scheduled for launch March 8, 2001 KSC01pp0199

KENNEDY SPACE CENTER, FLA. -- Workers at SPACEHAB gather to watch STS-...

KENNEDY SPACE CENTER, FLA. -- Workers at SPACEHAB gather to watch STS-102 Mission Specialist Andrew S.W. Thomas work on the Early Ammonia Servicer. Thomas and other crew members are at SPACEHAB to get acquainte... More

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour rests on Launch Pad 39A after rollout from the Vehicle Assembly Building.  The Shuttle comprises the orbiter, in front, and the taller orange external tank behind it flanked by twin solid rocket boosters. On either side of Endeavour's tail and main engines are the tail service masts that support the fluid,, gas and electrical requirements of the orbiter's liquid oxyen and liquid hydrogen aft T-0 umbilicals. Mission STS-111 is designated UF-2, the 14th assembly flight to the International Space Station.  Endeavour's payload includes the Multi-Purpose Logistics Module Leonardo and Mobile Base System.  The mission also will swap resident crews on the Station, carrying the Expedition 5 crew and returning to Earth Expedition 4.  Liftoff of Endeavour is scheduled between 4 and 8 p.m. May 30, 2002 KSC-02pd0591

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour rests on Launch ...

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour rests on Launch Pad 39A after rollout from the Vehicle Assembly Building. The Shuttle comprises the orbiter, in front, and the taller orange external tank ... More

An STS-102 crew member reaches for the release lever for the slidewire basket, used for emergency egress from the orbiter and pad. The crew is at KSC for Terminal Countdown Demonstration Test activities, which include the emergency training and a simulated launch countdown. On the horizon in the background can be seen the Vehicle Assembly Building. STS-102 is the eighth construction flight to the International Space Station, with Space Shuttle Discovery carrying the Multi-Purpose Logistics Module Leonardo. In addition, the Expedition Two crew will be on the mission, to replace Expedition One, who will return to Earth with Discovery. Launch on mission STS-102 is scheduled for March 8 KSC01pp0340

An STS-102 crew member reaches for the release lever for the slidewire...

An STS-102 crew member reaches for the release lever for the slidewire basket, used for emergency egress from the orbiter and pad. The crew is at KSC for Terminal Countdown Demonstration Test activities, which ... More

KENNEDY SPACE CENTER, Fla. -- With the Rotating Service Structure rolled back, Space Shuttle Discovery is revealed, poised for launch on mission STS-102 at 6:42 a.m. EST March 8. It sits on the Mobile Launcher Platform, which straddles the flame trench below that helps deflect the intense heat of launch. Made of concrete and refractory brick, the trench is 490 feet long, 58 feet wide and 40 feet high. Situated above the external tank is the Gaseous Oxygen Vent Arm with the “beanie cap,” a vent hood. On this eighth construction flight to the International Space Station, Discovery carries the Multi-Purpose Logistics Module Leonardo, the primary delivery system used to resupply and return Station cargo requiring a pressurized environment. Leonardo will deliver up to 10 tons of laboratory racks filled with equipment, experiments and supplies for outfitting the newly installed U.S. Laboratory Destiny KSC01padig145

KENNEDY SPACE CENTER, Fla. -- With the Rotating Service Structure roll...

KENNEDY SPACE CENTER, Fla. -- With the Rotating Service Structure rolled back, Space Shuttle Discovery is revealed, poised for launch on mission STS-102 at 6:42 a.m. EST March 8. It sits on the Mobile Launcher ... More

In the Space Station Processing Facility, workers help guide the Multi-Purpose Logistics Module Donatello as it moves the length of the SSPF toward a workstand. In the SSPF, Donatello will undergo processing by the payload test team, including integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle’s payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo. Donatello will be launched on mission STS-130, currently planned for September 2004 KSC-01pp0247

In the Space Station Processing Facility, workers help guide the Multi...

In the Space Station Processing Facility, workers help guide the Multi-Purpose Logistics Module Donatello as it moves the length of the SSPF toward a workstand. In the SSPF, Donatello will undergo processing by... More

KENNEDY SPACE CENTER, FLA. --  In the Space Station Processing Facility, STS-122 crew members inspect the Multi-Purpose Experiment Support Structure - Non-Deployable (MPESS-ND), part of the payload on their mission.  Here, Mission Specialist Stan Love (left) and Commander Steve Frick get a close look.  The crew is participating in a crew equipment interface test that provides opportunities for hands-on experience with payloads and equipment.  The other crew members are Pilot Alan Poindexter and Mission Specialists Rex Walheim, Leland Melvin and Hans Schlegel, who represents the European Space Agency. The 24th mission to the International Space Station, STS-122 will also include the Columbus European Laboratory.  Launch of STS-122 on Space Shuttle Discovery is scheduled no earlier than October. Photo credit: NASA/Kim Shiflett KSC-07pd0061

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facilit...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, STS-122 crew members inspect the Multi-Purpose Experiment Support Structure - Non-Deployable (MPESS-ND), part of the payload on their mis... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's Kennedy Space Center in Florida, a crane lifts the gaseous nitrogen tank from space shuttle Discovery's payload bay with the aid of a "fish pole" lifting fixture.  The tank is being removed during processing for the shuttle's STS-131 mission to the International Space Station.    The tanks are used for atmosphere conditioning and for moving potable water in the crew module.  The seven-member STS-131 crew will deliver a Multi-Purpose Logistics Module filled with science racks to be transferred to laboratories on the station.  Three spacewalks will include work to attach a spare ammonia tank assembly to the station's exterior and return a European experiment from outside the station's Columbus module. This will be the 33rd shuttle mission to the station. Launch is targeted for March 18, 2010.  Photo credit: NASA/Troy Cryder KSC-2009-6101

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's ...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's Kennedy Space Center in Florida, a crane lifts the gaseous nitrogen tank from space shuttle Discovery's payload bay with the aid of a "fish ... More

STS-102 Mission Specialists Andrew Thomas (front, left) and Paul Richards take their seats in the slidewire basket, used for emergency egress from the orbiter and pad. Behind them, other crew members climb into their basket. The crew is at KSC for Terminal Countdown Demonstration Test activities, which include the emergency training and a simulated launch countdown.; STS-102 is the eighth construction flight to the International Space Station, with Space Shuttle Discovery carrying the Multi-Purpose Logistics Module Leonardo. In addition, the Expedition Two crew will be on the mission, to replace Expedition One, who will return to Earth with Discovery. Launch on mission STS-102 is scheduled for March 8 KSC01pp0341

STS-102 Mission Specialists Andrew Thomas (front, left) and Paul Richa...

STS-102 Mission Specialists Andrew Thomas (front, left) and Paul Richards take their seats in the slidewire basket, used for emergency egress from the orbiter and pad. Behind them, other crew members climb into... More

KENNEDY SPACE CENTER, Fla. --  In the glow of a setting sun, Space Shuttle Endeavour is revealed after the rollback of the Rotating Service Structure (left) on Launch Pad 39A. At the top of the external tank can be seen the “beanie cap,” a venting apparatus at the end of the Gaseous Oxygen Vent Arm. Endeavour is expected to lift off on mission STS-100 on April 19, carrying the Multi-Purpose Logistics Module Raffaello and the Canadian robotic arm, SSRMS, with a crew of seven to the International Space Station KSC-01pp0909

KENNEDY SPACE CENTER, Fla. -- In the glow of a setting sun, Space Shu...

KENNEDY SPACE CENTER, Fla. -- In the glow of a setting sun, Space Shuttle Endeavour is revealed after the rollback of the Rotating Service Structure (left) on Launch Pad 39A. At the top of the external tank ca... More

KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39-A, the STS-111 and Expedition Five crews take time out from a tour of the pad with their friends and family to pose for a group portrait.  From left, they are STS-111 Pilot Paul Lockhart, STS-111 Commander Kenneth Cockrell, Expedition Five Commander Valeri Korzun (RSA), Expedition Five astronaut Peggy Whitson, Expedition Five cosmonaut Sergei Treschev (RSA), and STS-111 Mission Specialists Philippe Perrin (CNES) and Franklin Chang-Diaz.  Expedition Five is traveling to the International Space Station on Space Shuttle Endeavour as the replacement crew for Expedition Four, who will return to Earth aboard the orbiter. Known as Utilization Flight 2, STS-111 is carrying supplies and equipment to the Station. The payload includes the Multi-Purpose Logistics Module Leonardo, the Mobile Base System, which will be installed on the Mobile Transporter to complete the Canadian Mobile Servicing System, or MSS, and a replacement wrist/roll joint for Canadarm 2. The mechanical arm will then have the capability to "inchworm" from the U.S. Lab Destiny to the MSS and travel along the truss to work sites. Launch is scheduled for May 30, 2002 KSC-02pd0814

KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39-A, the STS-111 and Expe...

KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39-A, the STS-111 and Expedition Five crews take time out from a tour of the pad with their friends and family to pose for a group portrait. From left, they are STS-... More

Members of the STS-102 crew check out Discovery’s payload bay in the Orbiter Processing Facility bay 1. Dressed in green, they are Mission Specialist Paul W. Richards (left) and Pilot James W. Kelly. The crew is at KSC for Crew Equipment Interface Test activities. Above their heads on the left side are two of the experiments being carried on the flight. STS-102 is the 8th construction flight to the International Space Station and will carry the Multi-Purpose Logistics Module Leonardo. STS-102 is scheduled for launch March 1, 2001. On that flight, Leonardo will be filled with equipment and supplies to outfit the U.S. laboratory module Destiny. The mission will also be carrying the Expedition Two crew to the Space Station, replacing the Expedition One crew who will return on Shuttle Discovery KSC01pp0173

Members of the STS-102 crew check out Discovery’s payload bay in the O...

Members of the STS-102 crew check out Discovery’s payload bay in the Orbiter Processing Facility bay 1. Dressed in green, they are Mission Specialist Paul W. Richards (left) and Pilot James W. Kelly. The crew i... More

CAPE CANAVERAL, Fla. -  At NASA's Kennedy Space Center in Florida, space shuttle Endeavour rolls up the ramp toward Launch Pad 39A.  At right are the open rotating service structure and the fixed service structure with the 80-foot-tall lightning mast on top.  The shuttle moved off Launch Pad 39B starting at 8:28 am. EDT and completed its move to Launch Pad 39A at 4:37 p.m. Endeavour is targeted to launch Nov. 14 on the STS-126 mission. On this 27th mission to the International Space Station, Endeavour will carry the Lightweight Multi-Purpose Experiment Support Structure Carrier and the Multi-Purpose Logistics Module Leonardo that will hold supplies and equipment, including additional crew quarters, additional exercise equipment, spare hardware and equipment for the regenerative life support system.  Photo credit: NASA/Troy Cryder KSC-08pd3356

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, spa...

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, space shuttle Endeavour rolls up the ramp toward Launch Pad 39A. At right are the open rotating service structure and the fixed service struct... More

KENNEDY SPACE CENTER, FLA. -- Trailing a plume of smoke, Space Shuttle Endeavour pierces a small cloud, briefly lighting it from within, during launch on mission STS-100. Liftoff of the ninth flight to the International Space Station occurred at 2:40:42 p.m. EDT. The 11-day mission will deliver and integrate the Spacelab Logistics Pallet/Launch Deployment Assembly, which includes the Space Station Remote Manipulator System and the UHF Antenna. The mission includes two planned spacewalks for installation of the SSRMS on the Station. Also onboard is the Multi-Purpose Logistics Module Raffaello, carrying resupply stowage racks and resupply/return stowage platforms KSC01pp0824

KENNEDY SPACE CENTER, FLA. -- Trailing a plume of smoke, Space Shuttle...

KENNEDY SPACE CENTER, FLA. -- Trailing a plume of smoke, Space Shuttle Endeavour pierces a small cloud, briefly lighting it from within, during launch on mission STS-100. Liftoff of the ninth flight to the Inte... More

In the Space Station Processing Facility, workers help guide the overhead crane as it lifts the Multi-Purpose Logistics Module Donatello out of the shipping container. In the SSPF, Donatello will undergo processing by the payload test team, including integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle’s payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo. Donatello will be launched on mission STS-130, currently planned for September 2004 KSC-01pp0246

In the Space Station Processing Facility, workers help guide the overh...

In the Space Station Processing Facility, workers help guide the overhead crane as it lifts the Multi-Purpose Logistics Module Donatello out of the shipping container. In the SSPF, Donatello will undergo proces... More

KENNEDY SPACE CENTER, Fla. - Astronaut E. Michael Fincke is ready to practice driving an M-113 armored personnel carrier. Fincke is a backup crew member for the International Space Station Expedition 4 crew, who are flying on Space Shuttle Endeavour as part of mission STS-108.  Both the mission crew and Expedition 4 crews are at KSC for Terminal Countdown Demonstration Test activities.  The TCDT includes emergency exit from the launch pad and a simulated launch countdown. The 11-day mission will also carry the Multi-Purpose Logistics Module Raffaello, filled with supplies and equipment.  STS-108 is scheduled to launch Nov. 29 KSC-01PP1658

KENNEDY SPACE CENTER, Fla. - Astronaut E. Michael Fincke is ready to p...

KENNEDY SPACE CENTER, Fla. - Astronaut E. Michael Fincke is ready to practice driving an M-113 armored personnel carrier. Fincke is a backup crew member for the International Space Station Expedition 4 crew, wh... More

KENNEDY SPACE CENTER, FLA. -  STS-114 Mission Specialist Stephen Robinson is helped by the Closeout Crew with his launch and entry suit before entering Space Shuttle Discovery.  The Return to Flight mission to the International Space Station carries the External Stowage Platform-2, equipped with spare part assemblies, and a replacement Control Moment Gyroscope contained in the Lightweight Multi-Purpose Experiment Support Structure and Multi-Purpose Logistics Module Raffaello, housing 15 tons of hardware and supplies that will be transferred to the Station after the Shuttle docks to the complex .  On this mission, the crew will perform inspections on-orbit for the first time of all of the Reinforced Carbon-Carbon (RCC) panels on the leading edge of the wings and the Thermal Protection System tiles using the new Canadian-built Orbiter Boom Sensor System and the data from 176 impact and temperature sensors. Mission Specialists will also practice repair techniques on RCC and tile samples during a spacewalk in the payload bay. KSC-05pp1799

KENNEDY SPACE CENTER, FLA. - STS-114 Mission Specialist Stephen Robin...

KENNEDY SPACE CENTER, FLA. - STS-114 Mission Specialist Stephen Robinson is helped by the Closeout Crew with his launch and entry suit before entering Space Shuttle Discovery. The Return to Flight mission to ... More

KENNEDY SPACE CENTER, Fla. --  STS-108 Mission Specialist Daniel M. Tani is ready to practice driving an M-113 armored personnel carrier.  He and other crew members are taking part in Terminal Countdown Demonstration Test activities, which include emergency exit from the launch pad and a simulated launch countdown.   STS-108 is a Utilization Flight that will carry the replacement Expedition 4 crew to the International Space Station, as well as the Multi-Purpose Logistics Module Raffaello, filled with supplies and equipment.  The l1-day mission is scheduled for launch Nov. 29 on Space Shuttle Endeavour KSC-01PP1653

KENNEDY SPACE CENTER, Fla. -- STS-108 Mission Specialist Daniel M. Ta...

KENNEDY SPACE CENTER, Fla. -- STS-108 Mission Specialist Daniel M. Tani is ready to practice driving an M-113 armored personnel carrier. He and other crew members are taking part in Terminal Countdown Demonst... More

CAPE CANAVERAL, Fla. - In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the accordion-like arm of a rack insertion device moves a science rack into position for installation inside Multi-Purpose Logistics Module Leonardo during processing for space shuttle Discovery's STS-131 mission to the International Space Station.    The science racks Leonardo delivers will be transferred to laboratories on the station. Three spacewalks during STS-131 will include work to attach a spare ammonia tank assembly to the station's exterior and return a European experiment from outside the station's Columbus module. STS-131 will be the 33rd shuttle mission to the station. Launch is targeted for March 18, 2010.  Photo credit: NASA/Amanda Diller KSC-2009-6568

CAPE CANAVERAL, Fla. - In the Space Station Processing Facility at NAS...

CAPE CANAVERAL, Fla. - In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the accordion-like arm of a rack insertion device moves a science rack into position for installation i... More

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, workers check the inside of the Multi-Purpose Logistics Module Leonardo before closing the hatch.  The module will carry science and storage racks on space shuttle Discovery's STS-128 mission to the International Space Station.  Launch of Discovery is targeted for Aug. 18.  Photo credit: NASA/Jim Grossmann KSC-2009-3815

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NAS...

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, workers check the inside of the Multi-Purpose Logistics Module Leonardo before closing the hatch. The ... More

KENNEDY SPACE CENTER, FLA. -- STS-102 Mission Specialist Andrew S.W. Thomas (center), and Expedition Two astronaut James S. Voss (right) talk with two workers inside Leonardo, one of the Multi-Purpose Logistics Modules in the Space Station Processing Facility. The MPLM, part of the payload on the STS-102 mission, is the first of three pressurized modules that will serve as the International Space Station’s “moving vans,” carrying laboratory racks filled with equipment, experiments and supplies to and from the Space Station aboard the Space Shuttle. STS-102 is scheduled to be launched in early March. On that flight, Leonardo will be filled with equipment and supplies to outfit the U.S. laboratory module Destiny. The mission will also be carrying the Expedition Two crew to the Space Station, replacing the Expedition One crew who will return on Shuttle Discovery KSC01pp0114

KENNEDY SPACE CENTER, FLA. -- STS-102 Mission Specialist Andrew S.W. T...

KENNEDY SPACE CENTER, FLA. -- STS-102 Mission Specialist Andrew S.W. Thomas (center), and Expedition Two astronaut James S. Voss (right) talk with two workers inside Leonardo, one of the Multi-Purpose Logistics... More

In the Space Station Processing Facility, workers help guide the Multi-Purpose Logistics Module Leonardo as it moves toward the weight and balance scale. The Italian-built MPLM is one of three such pressurized modules that will serve as the International Space Station's "moving vans," carrying laboratory racks filled with equipment, experiments and supplies to and from the station aboard the Space Shuttle. The cylindrical module is approximately 21 feet long and 15 feet in diameter, weighing almost 4.1 metric tons. It can carry up to 9.1 metric tons of cargo packed into 16 standard space station equipment racks. The Leonardo will be launched on mission STS-102 March 8. On that flight, Leonardo will be filled with equipment and supplies to outfit the U.S. laboratory module, to be carried to the ISS on the Feb. 7 launch of STS-98 KSC-01pp0253

In the Space Station Processing Facility, workers help guide the Multi...

In the Space Station Processing Facility, workers help guide the Multi-Purpose Logistics Module Leonardo as it moves toward the weight and balance scale. The Italian-built MPLM is one of three such pressurized ... More

KENNEDY SPACE CENTER, Fla. --  The STS-108 and Expedition 4 crews head for the Astrovan and a ride to Launch Pad 39B.  Leading the way are Pilot Mark E. Kelly (left) and Commander Dominic L. Gorie; behind them are Mission Specialists Daniel M. Tani and Linda A. Godwin; next is Expedition 4 Commander Yuri Onufrienko, followed by astronauts Daniel W. Bursch (left) and Carl E. Walz. This is the second launch attempt after the first attempt Dec. 4 was scrubbed due to poor weather conditions at KSC.  The main goals of the mission are to carry the Expedition 4 crew to the International Space Station as replacement for Expedition 3; carry the Multi-Purpose Logistics Module Raffaello filled with water, equipment and supplies; and  install thermal blankets over equipment at the base of the ISS solar wings. STS-108 is the final Shuttle mission of 2001 and the 107th Shuttle flight overall.  Launch is scheduled for 5:19 p.m. EST (22:19 GMT) Dec. 5, 2001, from Launch Pad 39B KSC01PD1784

KENNEDY SPACE CENTER, Fla. -- The STS-108 and Expedition 4 crews head...

KENNEDY SPACE CENTER, Fla. -- The STS-108 and Expedition 4 crews head for the Astrovan and a ride to Launch Pad 39B. Leading the way are Pilot Mark E. Kelly (left) and Commander Dominic L. Gorie; behind them ... More

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, the Forward Reaction Control System, or FRCS, for space shuttle Discovery arrives at Orbiter Processing Facility Bay 3.    Discovery is being prepared for the STS-131 mission, the 33rd flight to the International Space Station.  The FRCS provides the thrust for attitude (rotational) maneuvers (pitch, yaw and roll) and for small velocity changes along the orbiter axis (translation maneuvers).  The seven-member STS-131 crew will deliver a Multi-Purpose Logistics Module filled with resupply stowage platforms and racks to be transferred to locations around the station.  Three spacewalks will include work to attach a spare ammonia tank assembly to the station's exterior and return a European experiment from outside the station's Columbus module.  Discovery's launch is targeted for March 18, 2010.  For information on the STS-131 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts131/index.html.  Photo credit: NASA/Jack Pfaller KSC-2009-6706

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, the ...

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, the Forward Reaction Control System, or FRCS, for space shuttle Discovery arrives at Orbiter Processing Facility Bay 3. Discovery is being pr... More

KENNEDY SPACE CENTER, FLA. -- Workers in the Space Station Processing Facility watch as a laboratory rack moves into the Multi-Purpose Logistics Module Leonardo. The MPLM is the first of three such pressurized modules that will serve as the International Space Station’s “moving vans,” carrying laboratory racks filled with equipment, experiments and supplies to and from the Space Station aboard the Space Shuttle. Leonardo will be launched March 1, 2001, on Shuttle mission STS-102 On that flight, Leonardo will be filled with equipment and supplies to outfit the U.S. laboratory module, being carried to the ISS on the Jan. 19, 2001, launch of STS-98 KSC00pp1968

KENNEDY SPACE CENTER, FLA. -- Workers in the Space Station Processing ...

KENNEDY SPACE CENTER, FLA. -- Workers in the Space Station Processing Facility watch as a laboratory rack moves into the Multi-Purpose Logistics Module Leonardo. The MPLM is the first of three such pressurized ... More

Before entering Space Shuttle Discovery, STS-102 Pilot James Kelly gets help with his launch and entry suit from technicians in the White Room. The mission is Kelly’s first Shuttle flight. Discovery is carrying the Multi-Purpose Logistics Module Leonardo on the eighth construction flight to the International Space Station. The primary delivery system used to resupply and return Station cargo requiring a pressurized environment, Leonardo will deliver up to 10 tons of laboratory racks filled with equipment, experiments and supplies for outfitting the newly installed U.S. Laboratory Destiny. Discovery is set to launch March 8 at 6:42 a.m. EST. The 12-day mission is expected to end with a landing at KSC on March 20 KSC01pp0450

Before entering Space Shuttle Discovery, STS-102 Pilot James Kelly get...

Before entering Space Shuttle Discovery, STS-102 Pilot James Kelly gets help with his launch and entry suit from technicians in the White Room. The mission is Kelly’s first Shuttle flight. Discovery is carrying... More

CAPE CANAVERAL, Fla. –   In the Vehicle Assembly Building at NASA's Kennedy Space Center, external fuel tank 129 is lowered into high bay 1 between the solid rocket boosters at left for mating on the mobile launcher platform. The external tank-SRB stack will then be mated in two weeks to space shuttle Endeavour for the STS-126 mission.  The STS-126 mission will deliver a Multi-Purpose Logistics Module to the International Space Station.  Launch is targeted for Nov. 10. Photo credit: NASA/Jack Pfaller KSC-08pd2523

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Ke...

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center, external fuel tank 129 is lowered into high bay 1 between the solid rocket boosters at left for mating on the mobile lau... More

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, workers close the hatch to the Multi-Purpose Logistics Module Leonardo.  The module will carry science and storage racks on space shuttle Discovery's STS-128 mission to the International Space Station.  Launch of Discovery is targeted for Aug. 18.  Photo credit: NASA/Jim Grossmann KSC-2009-3819

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NAS...

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, workers close the hatch to the Multi-Purpose Logistics Module Leonardo. The module will carry science ... More

KENNEDY SPACE CENTER, FLA. --   In the Space Station Processing Facility, STS-122 crew members pause for a photo in front of the Columbus European Laboratory, part of the payload on their mission. From left are Pilot Alan Poindexter, Mission Specialists Hans Schlegel, Rex Walheim and Stan Love, and Commander Steve Frick. Schlegel represents the European Space Agency.  The crew is participating in a crew equipment interface test that provides opportunities for hands-on experience with payloads and equipment. The 24th mission to the International Space Station, STS-122 will also include the Multi-Purpose Experiment Support Structure - Non-Deployable (MPESS-ND). Launch of STS-122 on Space Shuttle Discovery is scheduled no earlier than October. Photo credit: NASA/Kim Shiflett KSC-07pd0060

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facili...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, STS-122 crew members pause for a photo in front of the Columbus European Laboratory, part of the payload on their mission. From left are... More

CAPE CANAVERAL, Fla. -  In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the Multi-Purpose Logistics Module Leonardo is lowered into the payload canister for transfer to Launch Pad 39A.  Leonardo is part of space shuttle Endeavour's payload on the STS-126 mission to the International Space Station. At the pad, the payload canister will release its cargo into the Payload Changeout Room.  Later, the payload will be installed in space shuttle Endeavour's payload bay.  The module contains supplies and equipment, including additional crew quarters, equipment for the regenerative life support system and spare hardware. Endeavour is targeted for launch on Nov. 14.  Photo credit: NASA/Troy Cryder KSC-08pd3298

CAPE CANAVERAL, Fla. - In the Space Station Processing Facility at NA...

CAPE CANAVERAL, Fla. - In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the Multi-Purpose Logistics Module Leonardo is lowered into the payload canister for transfer to Launc... More

KENNEDY SPACE CENTER, Fla. -- This closeup shows Space Shuttle Discovery as it travels to Launch Pad 39B. Underneath Discovery is the Mobile Launcher Platform, a two-story movable launch base. Part of the MPLM is the tail service mast, seen here at the bottom of the wind and next to the Shuttle’s main engines. The tail service mast is 31 feet high, 15 feet long and 9 feet wide. A second TSM is on the other side. They support the fluid, gas and electrical requirements of the orbiter’s liquid oxygen and liquid hydrogen aft T-0 umbilicals. Discovery will be flying on mission STS-102 to the International Space Station. Its payload is the Multi-Purpose Logistics Module Leonardo, a “moving van,” to carry laboratory racks filled with equipment, experiments and supplies to and from the Space Station aboard the Space Shuttle. The flight will also carry the Expedition Two crew up to the Space Station, replacing Expedition One, who will return to Earth on Discovery. Launch is scheduled for March 8 at 6:45 a.m. EST KSC01padig074

KENNEDY SPACE CENTER, Fla. -- This closeup shows Space Shuttle Discove...

KENNEDY SPACE CENTER, Fla. -- This closeup shows Space Shuttle Discovery as it travels to Launch Pad 39B. Underneath Discovery is the Mobile Launcher Platform, a two-story movable launch base. Part of the MPLM ... More

The orbiter Discovery is lifted by cranes in the transfer aisle of the Vehicle Assembly Building. It will next be lifted into a vertical position and into high bay 1 for mating with its solid rocket boosters and external tank. Discovery will be launched March 8 on mission STS-102, the eighth construction flight to the International Space Station. The Shuttle will carry the Multi-Purpose Logistics Module Leonardo, the first of three pressurized modules provided by the Italian Space Agency to carry supplies and equipment to the Space Station and back to Earth KSC01pp0229

The orbiter Discovery is lifted by cranes in the transfer aisle of the...

The orbiter Discovery is lifted by cranes in the transfer aisle of the Vehicle Assembly Building. It will next be lifted into a vertical position and into high bay 1 for mating with its solid rocket boosters an... More

KENNEDY SPACE STATION, FLA. -- Space Shuttle Endeavour hurtles into a clear blue sky from Launch Pad 39A on mission STS-100. On the horizon is the Atlantic Ocean. Liftoff of the ninth flight to the International Space Station occurred at 2:40:42 p.m. EDT. The 11-day mission will deliver and integrate the Spacelab Logistics Pallet/Launch Deployment Assembly, which includes the Space Station Remote Manipulator System and the UHF Antenna. The mission includes two planned spacewalks for installation of the SSRMS on the Station. Also onboard is the Multi-Purpose Logistics Module Raffaello, carrying resupply stowage racks and resupply/return stowage platforms. <i>(Photo by Red Huber, Orlando Sentinel)</i KSC01padig214

KENNEDY SPACE STATION, FLA. -- Space Shuttle Endeavour hurtles into a ...

KENNEDY SPACE STATION, FLA. -- Space Shuttle Endeavour hurtles into a clear blue sky from Launch Pad 39A on mission STS-100. On the horizon is the Atlantic Ocean. Liftoff of the ninth flight to the Internationa... More

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, workers prepare to close the hatch on the Multi-Purpose Logistics Module Leonardo.  The module is the payload for space shuttle Endeavour's STS-126 mission to the International Space Station. The 15-day mission will deliver equipment and supplies to the space station in preparation for expansion from a three- to six-person resident crew aboard the complex. Leonardo holds supplies and equipment, including additional crew quarters, equipment for the regenerative life support system and spare hardware. Endeavour is targeted for launch Nov. 14. Photo credit: NASA/Jim Grossmann KSC-08pd3200

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NAS...

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, workers prepare to close the hatch on the Multi-Purpose Logistics Module Leonardo. The module is the p... More

CAPE CANAVERAL, Fla. -  At NASA's Kennedy Space Center in Florida, space shuttle Endeavour rolls off Launch Pad 39B for the 3.4-mile rollaround to Launch Pad 39A. First motion was at 8:28 a.m. EDT. Endeavour is targeted to launch Nov. 14 on the STS-126 mission. On this 27th mission to the International Space Station, Endeavour will carry the Lightweight Multi-Purpose Experiment Support Structure Carrier and the Multi-Purpose Logistics Module Leonardo that will hold supplies and equipment, including additional crew quarters, additional exercise equipment, spare hardware and equipment for the regenerative life support system.  Photo credit: NASA/Troy Cryder KSC-08pd3355

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, spa...

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, space shuttle Endeavour rolls off Launch Pad 39B for the 3.4-mile rollaround to Launch Pad 39A. First motion was at 8:28 a.m. EDT. Endeavour is... More

CAPE CANAVERAL, Fla. –  In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the crane lowers the Multi-Purpose Logistics Module Leonardo toward the payload canister. The canister will transport the module to Launch Pad 39A for installation in space shuttle Discovery for the STS-128 mission.   The module will carry science and storage racks to the International Space Station. Launch is targeted for Aug. 18.  Photo credit: NASA/Jack  Pfaller KSC-2009-4234

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NA...

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the crane lowers the Multi-Purpose Logistics Module Leonardo toward the payload canister. The canister... More

A model of the Multi-purpose Chemical Laser

A model of the Multi-purpose Chemical Laser

The original finding aid described this photograph as: Country: Unknown Scene Camera Operator: Unknown Release Status: Released to Public Combined Military Service Digital Photographic Files

M998 high mobility, Multi-purpose wheeled vehicles are offloaded from the utility landing craft LCU 1624 during the joint Thai/US combined exercise THALAY THAI '89

M998 high mobility, Multi-purpose wheeled vehicles are offloaded from ...

The original finding aid described this photograph as: Subject Operation/Series: THALAY THAI '89 Country: Thailand (THA) Scene Camera Operator: Unknown Release Status: Released to Public Combined Military S... More

Curious Thai citizens watch the slow progress of US Marines caught up in traffic in their M998 high mobility, Multi-purpose wheeled vehicle. The Marines are in Thailand to take part in the joint Thai/US combined exercise THALAY THAI '89

Curious Thai citizens watch the slow progress of US Marines caught up ...

The original finding aid described this photograph as: Subject Operation/Series: THALAY THAI '89 Country: Thailand (THA) Scene Camera Operator: PH1 Ted Salois Release Status: Released to Public Combined Mil... More

An M998 high mobility, Multi-purpose wheeled vehicle comes ashore at Pattaya Beach as another M998 is offloaded from the utility landing craft LCU 1634. The equipment will be used during the joint Thai/US combined exercise THALAY THAI '89

An M998 high mobility, Multi-purpose wheeled vehicle comes ashore at P...

The original finding aid described this photograph as: Subject Operation/Series: THALAY THAI '89 Country: Thailand (THA) Scene Camera Operator: PH1 Ted Salois Release Status: Released to Public Combined Mil... More

An M109 Paladin kicks up the dust at the Multi-Purpose Range Complex (MPRC) during a training mission

An M109 Paladin kicks up the dust at the Multi-Purpose Range Complex (...

The original finding aid described this photograph as: Base: Fort Stewart State: Georgia (GA) Country: United States Of America (USA) Scene Camera Operator: Don Teft Release Status: Released to Public Comb... More

A close right side view of a M1A1 Abrams Tank from the 2nd, 72nd Armored Battalion firing its gun at the Multi-Purpose Range Complex (MPRC)

A close right side view of a M1A1 Abrams Tank from the 2nd, 72nd Armor...

The original finding aid described this photograph as: Subject Operation/Series: LIVE FIRE Base: Kunsan Air Base Country: Republic Of Korea (KOR) Scene Camera Operator: Unknown Release Status: Released to ... More

A medium shot of a M2 Bradley from the 2nd, 9th Infantry at the Multi-Purpose Range Complex (MPRC)

A medium shot of a M2 Bradley from the 2nd, 9th Infantry at the Multi-...

The original finding aid described this photograph as: Base: Kunsan Air Base Country: Republic Of Korea (KOR) Scene Camera Operator: Unknown Release Status: Released to Public Combined Military Service Digi... More

Close up view of a M2 Bradley from the 2nd, 9th Infantry at the Multi-Purpose Range Complex (MPRC)

Close up view of a M2 Bradley from the 2nd, 9th Infantry at the Multi-...

The original finding aid described this photograph as: Subject Operation/Series: LIVE FIRE Base: Kunsan Air Base Country: Republic Of Korea (KOR) Scene Camera Operator: Unknown Release Status: Released to ... More

A medium right side view of a M1A1 Abrams Tank from the 2nd, 72nd Armored Battalion at the Multi-Purpose Range Complex (MPRC)

A medium right side view of a M1A1 Abrams Tank from the 2nd, 72nd Armo...

The original finding aid described this photograph as: Subject Operation/Series: LIVE FIRE Base: Kunsan Air Base Country: Republic Of Korea (KOR) Scene Camera Operator: Unknown Release Status: Released to ... More

A rine from Fox Company, 2d Battalion, 6th rines, observes the impact of his 83mm rocket, after firing the SMAW (Shoulder launched Multi-purpose Assault Weapon), at range 400 during COMBINED ARMS Exercise (CAX) 6-97. Range 400 is a reinforced company level training range, consisting of an initial breech (simulated mine field), overhead live firing from "chine-Gun Hill", and a platoon traversing through a canyon to reach the objective. CAX 5/6-97 is a MAGTF (rine Air Ground Task Force) exercise being conducted at MCAGCC (rine Corps Air Ground Combat Center), 29 Palms, California. The command element for this exercise is MAGTF-6, which is built around the 6th rine Regiment, 2d...

A rine from Fox Company, 2d Battalion, 6th rines, observes the impact ...

The original finding aid described this photograph as: [Complete] Scene Caption: A Marine from Fox Company, 2d Battalion, 6th Marines, observes the impact of his 83mm rocket, after firing the SMAW (Shoulder la... More

The Manipulator Flight Demonstration (MFD) payload is lowered into the payload bay of the Space Shuttle Orbiter Discovery in Orbiter Processing Facility 2. The MFD is one of several payloads that will fly on the STS-85 mission. This payload is designed to test the operational capability of the Japanese Experiment Module Remote Manipulator System (JEM RMS) Small Fine Arm (SFA), which can be seen atop its Multi-Purpose Experiment Support Structure (MPESS) carrier that will serve as a platform in the payload bay for the robotic arm experiment. The arm, which will be a part of the JEM element of the International Space Station, will be operated from the orbiter’s aft flight deck during the 11-day mission. Other payloads that will be aboard Discovery on this space flight include the Cryogenic Infrared Spectro-meters and Telescopes for the Atmosphere-Shuttle Pallet Satellite-2 (CRISTA-SPAS-2),  Technology Applications and Science-1 (TAS-1) and International Extreme Ultraviolet Hitchhiker (IEH-2) experiments KSC-97PC815

The Manipulator Flight Demonstration (MFD) payload is lowered into the...

The Manipulator Flight Demonstration (MFD) payload is lowered into the payload bay of the Space Shuttle Orbiter Discovery in Orbiter Processing Facility 2. The MFD is one of several payloads that will fly on th... More

The Manipulator Flight Demonstration (MFD) payload is installed into the payload bay of the Space Shuttle Orbiter Discovery in Orbiter Processing Facility 2. The MFD is one of several payloads that will fly on the STS-85 mission. This payload is designed to test the operational capability of the Japanese Experiment Module Remote Manipulator System (JEM RMS) Small Fine Arm (SFA), which can be seen atop its Multi-Purpose Experiment Support Structure (MPESS) carrier that will serve as a platform in the payload bay for the robotic arm experiment. The arm, which will be a part of the JEM element of the International Space Station, will be operated from the orbiter’s aft flight deck during the 11-day mission. Other payloads that will be aboard Discovery on this space flight include the  Cryogenic Infrared Spectrometers and Telescopes for the Atmosphere-Shuttle Pallet Satellite-2 (CRISTA- SPAS-2),  Technology Applications and Science-1 (TAS-1) and International Extreme Ultraviolet Hitchhiker (IEH-2) experiments KSC-97PC816

The Manipulator Flight Demonstration (MFD) payload is installed into t...

The Manipulator Flight Demonstration (MFD) payload is installed into the payload bay of the Space Shuttle Orbiter Discovery in Orbiter Processing Facility 2. The MFD is one of several payloads that will fly on ... More

The Manipulator Flight Demonstration (MFD) payload is hoisted for installation into the payload bay of the Space Shuttle Orbiter Discovery in Orbiter Processing Facility 2. The MFD is one of several payloads that will fly on the STS-85 mission. This payload is designed to test the operational capability of the Japanese Experiment Module Remote Manipulator System (JEM RMS) Small Fine Arm (SFA), which can be seen atop its Multi-Purpose Experiment Support Structure (MPESS) carrier that will serve as a platform in the payload bay for the robotic arm experiment. The arm, which will be a part of the JEM element of the International Space Station, will be operated from the orbiter’s aft flight deck during the 11-day mission. Other payloads that will be aboard Discovery on this space flight include the  Cryogenic Infrared Spectrometers and Telescopes for the Atmosphere-Shuttle Pallet Satellite-2 (CRISTA-SPAS-2), Technology Applications and Science-1 (TAS-1) and International Extreme Ultraviolet Hitchhiker (IEH-2) experiments KSC-97PC814

The Manipulator Flight Demonstration (MFD) payload is hoisted for inst...

The Manipulator Flight Demonstration (MFD) payload is hoisted for installation into the payload bay of the Space Shuttle Orbiter Discovery in Orbiter Processing Facility 2. The MFD is one of several payloads th... More

The Manipulator Flight Demonstration (MFD) payload is installed into the payload bay of the Space Shuttle Orbiter Discovery in Orbiter Processing Facility 2. The MFD is one of several payloads that will fly on the STS-85 mission. This payload is designed to test the operational capability of the Japanese Experiment Module Remote Manipulator System (JEM RMS) Small Fine Arm (SFA), which can be seen atop its Multi-Purpose Experiment Support Structure (MPESS) carrier that will serve as a platform in the payload bay for the robotic arm experiment. The arm, which will be a part of the JEM element of the International Space Station, will be operated from the orbiter’s aft flight deck during the 11-day mission. Other payloads that will be aboard Discovery on this space flight include the  Cryogenic Infrared Spectrometers and Telescopes for the Atmosphere-Shuttle Pallet Satellite-2 (CRISTA- SPAS-2),  Technology Applications and Science-1 (TAS-1) and International Extreme Ultraviolet Hitchhiker (IEH-2) experiments KSC-97PC817

The Manipulator Flight Demonstration (MFD) payload is installed into t...

The Manipulator Flight Demonstration (MFD) payload is installed into the payload bay of the Space Shuttle Orbiter Discovery in Orbiter Processing Facility 2. The MFD is one of several payloads that will fly on ... More

The Manipulator Flight Demonstration (MFD) payload is prepared for hoisting and installation into the payload bay of the Space Shuttle Orbiter Discovery in Orbiter Processing Facility 2. The MFD is one of several payloads that will fly on the STS-85 mission. This payload is designed to test the operational capability of the Japanese Experiment Module Remote Manipulator System (JEM RMS) Small Fine Arm (SFA), which can be seen atop its Multi-Purpose Experiment Support Structure (MPESS) carrier that will serve as a platform in the payload bay for the robotic arm experiment. The arm, which will be a part of the JEM element of the International Space Station, will be operated from the orbiter’s aft flight deck during the 11-day mission. Other payloads that will be aboard Discovery on this space flight include the  Cryogenic Infrared Spectrometers and Telescopes for the Atmosphere-Shuttle Pallet Satellite-2 (CRISTA-SPAS-2), Technology Applications and Science-1 (TAS-1) and International Extreme Ultraviolet Hitchhiker (IEH-2) experiments KSC-97PC813

The Manipulator Flight Demonstration (MFD) payload is prepared for hoi...

The Manipulator Flight Demonstration (MFD) payload is prepared for hoisting and installation into the payload bay of the Space Shuttle Orbiter Discovery in Orbiter Processing Facility 2. The MFD is one of sever... More

KENNEDY SPACE CENTER, FLA. -- Members of the STS-85 flight crew examine the Manipulator Flight Demonstraton (MFD) payload in the payload bay of the Space Shuttle Orbiter Discovery during Crew Equipment Interface Test (CEIT) activities for that mission.  They are (left) Mission Specialists Stephen K. Robinson and Robert L. Curbeam Jr. (right).  They are accompanied by a United Space Alliance (USA) payload technician.  The MFD is one of several payloads that will fly on the STS-85 mission.  This payload is designed to test the operational capability of the Japanese Experiment Module Remote Manipulator System (JEM RMS) Small Fine Arm (SFA), which can be seen atop its Multi-Purpose Experiment Support Structure (MPES) carrier that will serve as a platform in the payload bay for the robotic arm experiment.  The arm, which will be a part of the JEM element of the Interntional Space Station, will be operated from the orbiter's aft flight deck during the 11-day mission.  Other payloads that will be aboard Discovery on this space flight include the Cryogenic Infrared Spectrometers and Telescopes for the Atmosphere-Shuttle Pallet Satellite-2 (CRISTA-SPAS-2) Technology Applications and Science-1 (TAS-1) and International Extreme Ultraviolet Hitchhhiker (IEH-2) experiments. KSC-97PC906

KENNEDY SPACE CENTER, FLA. -- Members of the STS-85 flight crew examin...

KENNEDY SPACE CENTER, FLA. -- Members of the STS-85 flight crew examine the Manipulator Flight Demonstraton (MFD) payload in the payload bay of the Space Shuttle Orbiter Discovery during Crew Equipment Interfac... More

A John Deere 644E Tractor, Rubber-tired, Articulated Steering, Multi-Purpose (TRAM) from Beach MASTER Unit (BMU) 1 is loaded with mobility matting (MOMAT) for onload to Landing Craft Utility (LCU) 1635 during Exercise KERNEL BLITZ '97. KERNEL BLITZ is taking place off the coast of Southern California and Camp Pendleton to train Navy and Marine Corps personnel in amphibious operations

A John Deere 644E Tractor, Rubber-tired, Articulated Steering, Multi-P...

The original finding aid described this photograph as: Subject Operation/Series: KERNEL BLITZ '97 Base: Marine Corps Base Camp Pendleton State: California (CA) Country: United States Of America (USA) Scene... More

The Honorable William Cohen, Secretary of Defense, jokes with soldiers at the Multi-Purpose Range Complex (MPRC)

The Honorable William Cohen, Secretary of Defense, jokes with soldiers...

The original finding aid described this photograph as: Country: Republic Of Korea (KOR) Scene Camera Operator: SPC April Johnson Release Status: Released to Public Combined Military Service Digital Photographic Files

The Honorable William Cohen, Secretary of Defense, rides with soldiers in a M1 tank at the Multi-Purpose Range Complex (MPRC)

The Honorable William Cohen, Secretary of Defense, rides with soldiers...

The original finding aid described this photograph as: Country: Republic Of Korea (KOR) Scene Camera Operator: SPC April Johnson Release Status: Released to Public Combined Military Service Digital Photographic Files

The Honorable William Cohen discusses the different maneuvers being observed from the Multi-Purpose Range complex view stands

The Honorable William Cohen discusses the different maneuvers being ob...

The original finding aid described this photograph as: Country: Republic Of Korea (KOR) Scene Camera Operator: SPC April Johnson Release Status: Released to Public Combined Military Service Digital Photographic Files

The Honorable William Cohen, Secretary of Defense, reviews the troops at the Multi-Purpose Range Complex (MPRC)

The Honorable William Cohen, Secretary of Defense, reviews the troops ...

The original finding aid described this photograph as: Country: Republic Of Korea (KOR) Scene Camera Operator: SPC April Johnson Release Status: Released to Public Combined Military Service Digital Photographic Files

Secretary of Defense William Cohen watches a live-fire exercise from the viewing stand at the Multi-Purpose Range Complex (MPRC)

Secretary of Defense William Cohen watches a live-fire exercise from t...

The original finding aid described this photograph as: Country: Republic Of Korea (KOR) Scene Camera Operator: SPC April Johnson Release Status: Released to Public Combined Military Service Digital Photographic Files

US Marine Corps Air Ground Combat Center (MCAGCC). Marine participants from the 1ST Battalion, 8th Regiment Weapons Company participating in Combined Arms Exercise (CAX) 3-98, fire a Shoulder Launched Multi-purpose Assault Weapon (SMAW) during fire advances

US Marine Corps Air Ground Combat Center (MCAGCC). Marine participants...

The original finding aid described this photograph as: Base: Mcagcc, Twentynine Palms State: California (CA) Country: United States Of America (USA) Scene Camera Operator: LCPL W. Makela Release Status: Re... More

KENNEDY SPACE CENTER, FLA. -- KSC personnel watch as workers at the Shuttle Landing Facility begin unloading the canister containing the Multi-Purpose Logistics Module (MPLM), the Leonardo, from the Airbus Beluga transporter. Leonardo is scheduled to be launched on STS-100 in December 1999. The modules are being provided by Alenia Aerospazio, in Italy, and will be operated by NASA and supported by ASI, the Italian space agency. The MPLMs will be carried in the payload bay of a Shuttle orbiter, and will provide storage and additional work space for up to two astronauts when docked to the International Space Station. The second MPLM, to be handed over in April 1999, is named Raffaello. A third module, to be named Donatello, is due to be delivered in October 2000 for launch in January 2001 KSC-98pc883

KENNEDY SPACE CENTER, FLA. -- KSC personnel watch as workers at the Sh...

KENNEDY SPACE CENTER, FLA. -- KSC personnel watch as workers at the Shuttle Landing Facility begin unloading the canister containing the Multi-Purpose Logistics Module (MPLM), the Leonardo, from the Airbus Belu... More

KENNEDY SPACE CENTER, FLA. -- Technicians prepare to remove the Multi-Purpose Logistics Module (MPLM), the Leonardo, from the canister that carried it from Italy to KSC. Destined for use in constructing the International Space Station (ISS), the module is one of three being provided by Alenia Aerospazio, and will be operated by NASA and supported by ASI, the Italian space agency. The MPLMs will be carried in the payload bay of a Shuttle orbiter, and will provide storage and additional work space for up to two astronauts when docked to the ISS. Leonardo is scheduled to be launched on STS-100 in December 1999. The second MPLM, named Raffaello, is scheduled to be handed over in April 1999. A third module, to be named Donatello, is due to be delivered in October 2000 for launch in January 2001 KSC-98pc888

KENNEDY SPACE CENTER, FLA. -- Technicians prepare to remove the Multi-...

KENNEDY SPACE CENTER, FLA. -- Technicians prepare to remove the Multi-Purpose Logistics Module (MPLM), the Leonardo, from the canister that carried it from Italy to KSC. Destined for use in constructing the Int... More

KENNEDY SPACE CENTER, FLA. -- Technicians from Boeing and Alenia Aerospazio wait on a work stand at the Space Station Processing Facility to check out the Multi-Purpose Logistics Module (MPLM), being lowered. KSC personnel below watch the process. The module, named Leonardo, is one of three from Alenia Aerospazio, and will be operated by NASA and supported by ASI, the Italian space agency. The MPLMs will be carried in the payload bay of a Shuttle orbiter, and will provide storage and additional work space for up to two astronauts when docked to the International Space Station. Leonardo is scheduled to be launched on STS-100 in December 1999. The second MPLM, named Raffaello, is scheduled to be handed over in April 1999. A third module, to be named Donatello, is due to be delivered in October 2000 for launch in January 2001 KSC-98pc889

KENNEDY SPACE CENTER, FLA. -- Technicians from Boeing and Alenia Aeros...

KENNEDY SPACE CENTER, FLA. -- Technicians from Boeing and Alenia Aerospazio wait on a work stand at the Space Station Processing Facility to check out the Multi-Purpose Logistics Module (MPLM), being lowered. K... More

Michael Kinnan (left), with International Space Station (ISS) Launch Site Integration Office, and Todd McIntyre, with ISS International Elements, review paperwork for the Multi-Purpose Logistics Module (MPLM) in the Space Station Processing Facility at KSC. The Italian-built module, named Leonardo, is one of three to be provided by Alenia Aerospazio, and will be operated by NASA and supported by ASI, the Italian space agency. In the background, technicians from The Boeing Company and Alenia Aerospazio are preparing the first MPLM for flight. The MPLMs will be carried in the payload bay of a Shuttle orbiter, and will provide storage and additional work space for up to two astronauts when docked to the ISS. Leonardo is scheduled to be launched on STS-100 in December 1999. The second MPLM, named Raffaello, is scheduled to be handed over in April 1999. A third module, to be named Donatello, is due to be delivered in October 2000 for launch in January 2001 KSC-98pc905

Michael Kinnan (left), with International Space Station (ISS) Launch S...

Michael Kinnan (left), with International Space Station (ISS) Launch Site Integration Office, and Todd McIntyre, with ISS International Elements, review paperwork for the Multi-Purpose Logistics Module (MPLM) i... More

Michael Kinnan (left), with International Space Station (ISS) Launch Site Integration Office, and Todd McIntyre, with ISS International Elements, review paperwork for the Multi-Purpose Logistics Module (MPLM) in the Space Station Processing Facility at KSC. The Italian-built module, named Leonardo, is one of three to be provided by Alenia Aerospazio, and will be operated by NASA and supported by ASI, the Italian space agency. In the background, technicians from The Boeing Company and Alenia Aerospazio are preparing the first MPLM for flight. The MPLMs will be carried in the payload bay of a Shuttle orbiter, and will provide storage and additional work space for up to two astronauts when docked to the ISS. Leonardo is scheduled to be launched on STS-100 in December 1999. The second MPLM, named Raffaello, is scheduled to be handed over in April 1999. A third module, to be named Donatello, is due to be delivered in October 2000 for launch in January 2001 KSC-98pc906

Michael Kinnan (left), with International Space Station (ISS) Launch S...

Michael Kinnan (left), with International Space Station (ISS) Launch Site Integration Office, and Todd McIntyre, with ISS International Elements, review paperwork for the Multi-Purpose Logistics Module (MPLM) i... More

Salimbeti Andrea, with the Italian company Alenia Aerospazio, and STS-100 Mission Specialists Robert Curbeam and Chris Hadfield (Canada) inspect the opening to the Multi-Purpose Logistics Module (MPLM) that will be launched on STS-100 on Dec. 2, 1999. The Italian-built MPLM will be carried in the payload bay of the Shuttle orbiter, and will provide storage and additional work space for up to two astronauts when docked to the International Space Station. Named Leonardo, the MPLM is the first of three modules being provided by Alenia. The second MPLM, to be handed over in April 1999, is named Raffaello. A third module, to be named Donatello, is due to be delivered in October 2000 for launch in January 2001 KSC-98pc922

Salimbeti Andrea, with the Italian company Alenia Aerospazio, and STS-...

Salimbeti Andrea, with the Italian company Alenia Aerospazio, and STS-100 Mission Specialists Robert Curbeam and Chris Hadfield (Canada) inspect the opening to the Multi-Purpose Logistics Module (MPLM) that wil... More

STS-100 Mission Specialist Robert Curbeam crawls through the hatch of the Multi-Purpose Logistics Module (MPLM) that will be launched on STS-100 on Dec. 2, 1999. The Italian-built MPLM will be carried in the payload bay of the Shuttle orbiter, and will provide storage and additional work space for up to two astronauts when docked to the International Space Station. Named Leonardo, the MPLM is the first of three modules being provided by Alenia Aerospazio. The second MPLM, to be handed over in April 1999, is named Raffaello. A third module, to be named Donatello, is due to be delivered in October 2000 for launch in January 2001 KSC-98pc924

STS-100 Mission Specialist Robert Curbeam crawls through the hatch of ...

STS-100 Mission Specialist Robert Curbeam crawls through the hatch of the Multi-Purpose Logistics Module (MPLM) that will be launched on STS-100 on Dec. 2, 1999. The Italian-built MPLM will be carried in the pa... More

STS-100 Mission Specialist Chris Hadfield (Canada), Salimbeti Andrea (of Alenia Aerospazio), observers Astronaut Winston Scott and Scott McIntyre, and Mission Specialist Robert Curbeam take a close look at the opening of the Multi-Purpose Logistics Module (MPLM) that will be launched on STS-100 on Dec. 2, 1999. Behind them is Paolo Prato , a systems engineer with Alenia. The MPLM will be carried in the payload bay of the Shuttle orbiter, and will provide storage and additional work space for up to two astronauts when docked to the International Space Station. Named Leonardo, the MPLM is the first of three modules being provided by Alenia Aerospazio. The second MPLM, to be handed over in April 1999, is named Raffaello. A third module, to be named Donatello, is due to be delivered in October 2000 for launch in January 2001 KSC-98pc923

STS-100 Mission Specialist Chris Hadfield (Canada), Salimbeti Andrea (...

STS-100 Mission Specialist Chris Hadfield (Canada), Salimbeti Andrea (of Alenia Aerospazio), observers Astronaut Winston Scott and Scott McIntyre, and Mission Specialist Robert Curbeam take a close look at the ... More

(Left to right) STS-100 Mission Specialist Chris Hadfield, Salimbeti Andrea of Alenia Aerospazio, observer Astronaut Winston Scott, and Mission Specialist Robert Curbeam examine the interior of the Multi-Purpose Logistics Module (MPLM) Leonardo. The Italian-built MPLM will be carried in the payload bay of the Shuttle orbiter, and will provide storage and additional work space for up to two astronauts when docked to the International Space Station. It is expected to fly on the Space Shuttle Endeavour scheduled for launch on Dec. 2, 1999. Leonardo is the first of three modules being provided by Alenia. The second MPLM, to be handed over in April 1999, is named Raffaello. A third module, to be named Donatello, is due to be delivered in October 2000 for launch in January 2001 KSC-98pc925

(Left to right) STS-100 Mission Specialist Chris Hadfield, Salimbeti A...

(Left to right) STS-100 Mission Specialist Chris Hadfield, Salimbeti Andrea of Alenia Aerospazio, observer Astronaut Winston Scott, and Mission Specialist Robert Curbeam examine the interior of the Multi-Purpos... More

(Center) The Multi-Purpose Launch Module, named Leonardo, awaits processing in the Space Station Processing Facility (SSPF). At left is a Rack Insertion Device. Above the Leonardo are the windows of the tour room where visitors can watch the activities in the SSPF. Scheduled to be launched on STS-100 on Dec. 2, 1999, the Italian-built MPLM will be carried in the payload bay of the Shuttle orbiter, and will provide storage and additional work space for up to two astronauts when docked to the International Space Station. The Leonardo is the first of three modules being provided by Alenia Aerospazio. The second MPLM, to be handed over in April 1999, is named Raffaello. A third module, to be named Donatello, is due to be delivered in October 2000 for launch in January 2001 KSC-98pc992

(Center) The Multi-Purpose Launch Module, named Leonardo, awaits proce...

(Center) The Multi-Purpose Launch Module, named Leonardo, awaits processing in the Space Station Processing Facility (SSPF). At left is a Rack Insertion Device. Above the Leonardo are the windows of the tour ro... More

Workers watch as the Hubble Space Telescope Orbiting Systems Test (HOST)is lowered onto a workstand in the Space Shuttle Processing Facility. To the right can be seen the Rack Insertion Device and Leonardo, a Multi-Purpose Logistics Module. The HOST platform, one of the payloads on the STS-95 mission, is carrying four experiments to validate components planned for installation during the third Hubble Space Telescope servicing mission and to evaluate new technologies in an earth orbiting environment. The STS-95 mission is scheduled to launch Oct. 29. It will carry three other payloads: the Spartan solar-observing deployable spacecraft, the International Extreme Ultraviolet Hitchhiker, and the SPACEHAB single module with experiments on space flight and the aging process KSC-98pc1038

Workers watch as the Hubble Space Telescope Orbiting Systems Test (HOS...

Workers watch as the Hubble Space Telescope Orbiting Systems Test (HOST)is lowered onto a workstand in the Space Shuttle Processing Facility. To the right can be seen the Rack Insertion Device and Leonardo, a M... More

A USAF C-17 Globemaster III cargo aircraft carrying hurricane relief supplies is off loaded by a John Deere 644E Tractor, Rubber-tired, Articulated Steering, Multi-Purpose (TRAM) at Naval Station Roosevelt Roads, Puerto Rico. The C-17 from the 437th Airlift Wing at Charleston AFB, South Carolina, is one of many Air Mobility Command (AMC) aircraft currently tasked to airlift equipment and supplies to Puerto Rico and neighboring Caribbean Islands struck by Hurricane George

A USAF C-17 Globemaster III cargo aircraft carrying hurricane relief s...

The original finding aid described this photograph as: Base: Nas, Roosevelt Roads State: Puerto Rico (PR) Country: United States Of America (USA) Scene Major Command Shown: AMC Scene Camera Operator: SSGT ... More

Using a John Deere 644E Tractor, Rubber-tired, Articulated Steering, Multi-Purpose (TRAM), USAF Aerial Port personnel download a C-5 Galaxy cargo aircraft at Naval Station Roosevelt Roads, Puerto Rico. The Travis AFB, California, based C-5 Galaxy airlifted 73 US Marine Corps, Camp Lejeune, personnel and bridge building equipment to the Hurricane George battered Carribbean Island to support humanitarian relief efforts

Using a John Deere 644E Tractor, Rubber-tired, Articulated Steering, M...

The original finding aid described this photograph as: Base: Nas, Roosevelt Roads State: Puerto Rico (PR) Country: United States Of America (USA) Scene Major Command Shown: AMC Scene Camera Operator: SSGT ... More

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, STS-88 Mission Specialists Sergei Krikalev, a Russian cosmonaut, and Jerry L. Ross check out equipment on the Unity connecting module, primary payload on the mission. The STS-88 crew members are participating in a Crew Equipment Interface Test (CEIT), familiarizing themselves with the orbiter's midbody and crew compartments. Scheduled for launch on Dec. 3, 1998, STS-88 will be the first Space Shuttle launch for the International Space Station. The Unity connecting module will be mated to the Russian-built Zarya control module, already on orbit after a November launch. Unity will have two Pressurized Mating Adapters (PMAs) attached and 1 stowage rack installed inside. PMA-1 will connect U.S. and Russian elements; PMA-2 will provide a Shuttle docking location. Eventually, Unity's six ports will provide connecting points for the Z1 truss exterior framework, U.S. lab, airlock, cupola, Node 3, and the Multi-Purpose Logistics Module, as well as the control module. Zarya is a self-supporting active vehicle, providing propulsive control capability and power through the early assembly stages. It provides fuel storage capability and a rendezvous and docking capability to the Service Module KSC-98pc1224

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, STS-88 Mission Specialists Sergei Krikalev, a Russian cosmonaut, and Jerry L. Ross check out equipment on the Unity connecting module, pri... More

KENNEDY SPACE CENTER, FLA. -- Under clear and cloud-spotted skies at the Shuttle Landing Facility, cranes support the Multi-Purpose Logistics Module (MPLM) called Raffaello after the "Beluga" Super Transporter (left) has rolled away from it. Raffaello will be transferred to the Space Station Processing Facility for testing, joining the first Italian-built MPLM, Leonardo. One of Italy's major contributions to the ISS program, the MPLM is a reusable logistics carrier and the primary delivery system used to resupply and return station cargo requiring a pressurized environment. Weighing nearly 4.5 tons, the module measures 21 feet long and 15 feet in diameter. Raffaello is scheduled to be launched on mission STS-100 July 27, 2000 KSC-99pp1016

KENNEDY SPACE CENTER, FLA. -- Under clear and cloud-spotted skies at t...

KENNEDY SPACE CENTER, FLA. -- Under clear and cloud-spotted skies at the Shuttle Landing Facility, cranes support the Multi-Purpose Logistics Module (MPLM) called Raffaello after the "Beluga" Super Transporter ... More

KENNEDY SPACE CENTER, FLA. -- Inside a high bay of the Space Station Processing Facility (SSPF), workers begin removing the shipping canister from around the Multi-Purpose Logistics Module (MPLM) called Raffaello. After transfer to a workstand, the MPLM will undergo testing, joining the first Italian-built MPLM, Leonardo, in the SSPF. One of Italy's major contributions to the ISS program, the MPLM is a reusable logistics carrier and the primary delivery system used to resupply and return station cargo requiring a pressurized environment. Weighing nearly 4.5 tons, the Raffaello measures 21 feet long and 15 feet in diameter. Raffaello is scheduled to be launched on mission STS-100 July 27, 2000 KSC-99pp1020

KENNEDY SPACE CENTER, FLA. -- Inside a high bay of the Space Station P...

KENNEDY SPACE CENTER, FLA. -- Inside a high bay of the Space Station Processing Facility (SSPF), workers begin removing the shipping canister from around the Multi-Purpose Logistics Module (MPLM) called Raffael... More

KENNEDY SPACE CENTER, FLA. -- Inside a high bay in the Space Station Processing Facility (SSPF), workers on the floor oversee the transfer of the Multi-Purpose Logistics Module (MPLM) called Raffaello to a workstand where it will undergo testing. Sharing the space in the SSPF is the first Italian-built MPLM, Leonardo, seen at right, and the U.S. Lab, Destiny, in the background. One of Italy's major contributions to the ISS program, the MPLM is a reusable logistics carrier and the primary delivery system used to resupply and return station cargo requiring a pressurized environment. Weighing nearly 4.5 tons, the Raffaello measures 21 feet long and 15 feet in diameter. Raffaello is scheduled to be launched on mission STS-100 July 27, 2000 KSC-99pp1024

KENNEDY SPACE CENTER, FLA. -- Inside a high bay in the Space Station P...

KENNEDY SPACE CENTER, FLA. -- Inside a high bay in the Space Station Processing Facility (SSPF), workers on the floor oversee the transfer of the Multi-Purpose Logistics Module (MPLM) called Raffaello to a work... More

KENNEDY SPACE CENTER, FLA. -- The Multi-Purpose Logistics Module (MPLM) called Raffaello arrives in its shipping canister at the Space Station Processing Facility (SSPF). There it will undergo testing, joining the first Italian-built MPLM, Leonardo, in the SSPF. One of Italy's major contributions to the ISS program, the MPLM is a reusable logistics carrier and the primary delivery system used to resupply and return station cargo requiring a pressurized environment. Weighing nearly 4.5 tons, the Raffaello measures 21 feet long and 15 feet in diameter. Raffaello is scheduled to be launched on mission STS-100 July 27, 2000 KSC-99pp1019

KENNEDY SPACE CENTER, FLA. -- The Multi-Purpose Logistics Module (MPLM...

KENNEDY SPACE CENTER, FLA. -- The Multi-Purpose Logistics Module (MPLM) called Raffaello arrives in its shipping canister at the Space Station Processing Facility (SSPF). There it will undergo testing, joining ... More

KENNEDY SPACE CENTER, FLA. -- Cranes supporting the Multi-Purpose Logistics Module (MPLM) called Raffaello lower it onto a transporter for transfer to the Space Station Processing Facility (SSPF). At the SSPF the Raffaello will undergo testing, joining the first Italian-built MPLM, Leonardo. One of Italy's major contributions to the ISS program, the MPLM is a reusable logistics carrier and the primary delivery system used to resupply and return station cargo requiring a pressurized environment. Weighing nearly 4.5 tons, the Raffaello measures 21 feet long and 15 feet in diameter. Raffaello is scheduled to be launched on mission STS-100 July 27, 2000 KSC-99pp1017

KENNEDY SPACE CENTER, FLA. -- Cranes supporting the Multi-Purpose Logi...

KENNEDY SPACE CENTER, FLA. -- Cranes supporting the Multi-Purpose Logistics Module (MPLM) called Raffaello lower it onto a transporter for transfer to the Space Station Processing Facility (SSPF). At the SSPF t... More

Previous

of 12

Next