mabey

37 media by topicpage 1 of 1
Chas. R. Mabey - Public domain photograph, glass negative

Chas. R. Mabey - Public domain photograph, glass negative

A black and white photo of a man in a suit. Public domain portrait photograph, free to use, no copyright restrictions image - Picryl description

Left to right: W.C. Sproul, Pennsylvania; T.E. Campbell, Arizona; Chas T. Mabey, Utah; & D.W. Davis, Idaho [White House, Washington, D.C.]

Left to right: W.C. Sproul, Pennsylvania; T.E. Campbell, Arizona; Chas...

A black and white photo of three men in suits and hats. Public domain portrait photograph, free to use, no copyright restrictions image - Picryl description

Gov. Charles R. Mabey of Utah, [5/16/23]

Gov. Charles R. Mabey of Utah, [5/16/23]

A black and white photo of a man in a suit. Public domain portrait photograph, free to use, no copyright restrictions image - Picryl description

Sen. King of Utah, Gov. Chas. R. Mabey, 5/16/23

Sen. King of Utah, Gov. Chas. R. Mabey, 5/16/23

A couple of men standing next to each other. Public domain portrait photograph, free to use, no copyright restrictions image - Picryl description

Several miles from the city of Sarajevo, Bosnia, a detachement of Hungarian Army Engineers finish assembling a Mabey Johnson 200 bridge before moving it into position during Operation JOINT ENDEAVOR. The bridge will allow easier vehicular traffic access throughout the surrounding area. Beginning in December, 1995, US and allied nations deployed peacekeeping forces to Bosnia in support of JOINT ENDEAVOR. Romania is one fourteen Partnership for Peace (PfP) countries that participated in the NATO lead peace mission that includes providing a safe environment

Several miles from the city of Sarajevo, Bosnia, a detachement of Hung...

The original finding aid described this photograph as: Subject Operation/Series: JOINT ENDEAVOR Base: Sarajevo Country: Bosnia And/I Herzegovina (BIH) Scene Camera Operator: SGT Jean-Marc Schaible, USA Rel... More

Several miles from the city of Sarajevo, Bosnia, a detachement of Hungarian Army Engineers finish assembling a Mabey Johnson 200 bridge before moving it into position as part of Operation JOINT ENDEAVOR. The bridge will allow easier vehicular traffic access throughout the surrounding area. Beginning in December, 1995, US and allied nations deployed peacekeeping forces to Bosnia in support of JOINT ENDEAVOR. Romania is one fourteen Partnership for Peace (PfP) countries that participated in the NATO lead peace mission that includes providing a safe environment

Several miles from the city of Sarajevo, Bosnia, a detachement of Hung...

The original finding aid described this photograph as: Subject Operation/Series: JOINT ENDEAVOR Base: Sarajevo Country: Bosnia And/I Herzegovina (BIH) Scene Camera Operator: SGT Jean-Marc Schaible, USA Rel... More

Several miles from the city of Sarajevo, Bosnia, a detachement of Hungarian Army Engineers finish assembling a Mabey Johnson 200 bridge before moving it into position during Operation JOINT ENDEAVOR. The bridge will allow easier vehicular traffic access throughout the surrounding area. Beginning in December, 1995, US and allied nations deployed peacekeeping forces to Bosnia in support of JOINT ENDEAVOR. Romania is one fourteen Partnership for Peace (PfP) countries that participated in the NATO lead peace mission that includes providing a safe environment

Several miles from the city of Sarajevo, Bosnia, a detachement of Hung...

The original finding aid described this photograph as: Subject Operation/Series: JOINT ENDEAVOR Base: Sarajevo Country: Bosnia And/I Herzegovina (BIH) Scene Camera Operator: SGT Jean-Marc Schaible, USA Rel... More

Several miles from the city of Sarajevo, Bosnia a detachement of Hungarian Army Engineers finish the assembling a Mabey Johnson 200 with the help of local contractors and their 90 ton capacity crane used to lift it into position as part of Operation JOINT ENDEAVOR. The bridge will allow easier vehicular traffic access throughout the surrounding area. Beginning in December, 1995, US and allied nations deployed peacekeeping forces to Bosnia in support of JOINT ENDEAVOR. Romania is one fourteen Partnership for Peace (PfP) countries that participated in the NATO lead peace mission that includes providing a safe environment

Several miles from the city of Sarajevo, Bosnia a detachement of Hunga...

The original finding aid described this photograph as: Subject Operation/Series: JOINT ENDEAVOR Base: Sarajevo Country: Bosnia And/I Herzegovina (BIH) Scene Camera Operator: SGT Jean-Marc Schaible, USA Rel... More

The Donji Bratinia Bridge, just north of the city of Gorazde, is re-opened after having been shut down after its' destruction by North Atlantic Treaty Organization air strikes. The new bridge is a British Mabey Johnson bridge assembled by a Battallion of German Engineers belonging and supporting the Implementation Force (IFOR) in Bosnia as part of Operation JOINT ENDEAVOR. Beginning in December, 1995, US and allied nations deployed peacekeeping forces to Bosnia in support of JOINT ENDEAVOR. The provision of a secure environment is at the heart of the reconstruction effort in Bosnia

The Donji Bratinia Bridge, just north of the city of Gorazde, is re-op...

The original finding aid described this photograph as: Subject Operation/Series: JOINT ENDEAVOR Base: Gorazde Country: Bosnia And/I Herzegovina (BIH) Scene Camera Operator: SGT Jean-Marc Schaible, USA Rele... More

The Donji Bratinia Bridge, just north of the city of Gorazde, is re-opened after having been shut down after its' destruction by North Atlantic Treaty Organization air strikes. The new bridge is a British Mabey Johnson bridge assembled by a Battallion of German Engineers belonging and supporting the Implementation Force (IFOR) in Bosnia as part of Operation JOINT ENDEAVOR. Beginning in December, 1995, US and allied nations deployed peacekeeping forces to Bosnia in support of JOINT ENDEAVOR. The provision of a secure environment is at the heart of the reconstruction effort in Bosnia

The Donji Bratinia Bridge, just north of the city of Gorazde, is re-op...

The original finding aid described this photograph as: Subject Operation/Series: JOINT ENDEAVOR Base: Gorazde Country: Bosnia And/I Herzegovina (BIH) Scene Camera Operator: SGT Jean-Marc Schaible Release S... More

The Donji Bratinia Bridge, just north of the city of Gorazde, is re-opened after having been shut down after its' destruction by North Atlantic Treaty Organization air strikes. The new bridge is a British Mabey Johnson bridge assembled by a Battalion of German Engineers belonging and supporting the Implementation Force (IFOR) in Bosnia as part of Operation JOINT ENDEAVOR. Lieutenant General Michael Walker, Commander of the Allied Command Europe Rapid Reaction Corps, with the assistance of a Bosnian interpreter and a German interpreter, speaks to the German Army Engineers and the local Bosnian population gathered there to witness the official opening ceremony. Beginning in December, 1995,...

The Donji Bratinia Bridge, just north of the city of Gorazde, is re-op...

The original finding aid described this photograph as: [Complete] Scene Caption: The Donji Bratinia Bridge, just north of the city of Gorazde, is re-opened after having been shut down after its' destruction by... More

The Donji Bratinia Bridge, just north of the city of Gorazde, is re-opened after having been shut down after its' destruction by North Atlantic Treaty Organization air strikes. The new bridge is a British Mabey Johnson bridge assembled by a Battallion of German Engineers belonging and supporting the Implementation Force (IFOR) in Bosnia as part of Operation JOINT ENDEAVOR. Beginning in December, 1995, US and allied nations deployed peacekeeping forces to Bosnia in support of JOINT ENDEAVOR. The provision of a secure environment is at the heart of the reconstruction effort in Bosnia

The Donji Bratinia Bridge, just north of the city of Gorazde, is re-op...

The original finding aid described this photograph as: Subject Operation/Series: JOINT ENDEAVOR Base: Gorazde Country: Bosnia And/I Herzegovina (BIH) Scene Camera Operator: SGT Jean-Marc Schaible, USA Rele... More

The Donji Bratinia Bridge, just north of the city of Gorazde, is re-opened after having been shut down after it s destruction by North Atlantic Treaty Organization air strikes. The new bridge is a British Mabey Johnson bridge assembled by a Battalion of German Engineers belonging and supporting the Implementation Force (IFOR) in Bosnia as part of Operation JOINT ENDEAVOR. Lieutenant General Michael Walker, Commander of the Allied Command Europe Rapid Reaction Corps, with the assistance of the local Bosnian mayor of Gorazde and the German Engineer Battalion Commander, cut the ribbon during the official opening ceremony. Beginning in December, 1995, US and allied nations deployed...

The Donji Bratinia Bridge, just north of the city of Gorazde, is re-op...

The original finding aid described this photograph as: [Complete] Scene Caption: The Donji Bratinia Bridge, just north of the city of Gorazde, is re-opened after having been shut down after it s destruction by... More

The Donji Bratinia Bridge, just north of the city of Gorazde, is re-opened after having been shut down after its' destruction by North Atlantic Treaty Organization air strikes. The new bridge is a British Mabey Johnson bridge assembled by a Battalion of German Engineers belonging and supporting the Implementation Force (IFOR) in Bosnia as part of Operation JOINT ENDEAVOR. Lieutenant General Michael Walker, Commander of the Allied Command Europe Rapid Reaction Corps with the assistance of the local Bosnian mayor of Gorazde and the German Engineer Battalion Commander, sign an official ledger to commemorate the official opening ceremony. Beginning in December, 1995, US and allied nations...

The Donji Bratinia Bridge, just north of the city of Gorazde, is re-op...

The original finding aid described this photograph as: [Complete] Scene Caption: The Donji Bratinia Bridge, just north of the city of Gorazde, is re-opened after having been shut down after its' destruction by... More

The Donji Bratinia Bridge, just north of the city of Gorazde, is re-opened after having been shut down after its' destruction by North Atlantic Treaty Organization air strikes. The new bridge is a British Mabey Johnson bridge assembled by a Battallion of German Engineers belonging and supporting the Implementation Force (IFOR) in Bosnia as part of Operation JOINT ENDEAVOR. Beginning in December, 1995, US and allied nations deployed peacekeeping forces to Bosnia in support of JOINT ENDEAVOR. The provision of a secure environment is at the heart of the reconstruction effort in Bosnia

The Donji Bratinia Bridge, just north of the city of Gorazde, is re-op...

The original finding aid described this photograph as: Subject Operation/Series: JOINT ENDEAVOR Base: Gorazde Country: Bosnia And/I Herzegovina (BIH) Scene Camera Operator: SGT Jean-Marc Schaible, USA Rele... More

The Donji Bratinia Bridge, just north of the city of Gorazde, is re-opened after having been shut down after its' destruction by North Atlantic Treaty Organization air strikes. The new bridge is a British Mabey Johnson bridge assembled by a Battalion of German Engineers belonging and supporting the Implementation Force (IFOR) in Bosnia as part of Operation JOINT ENDEAVOR. Lieutenant General Michael Walker, Commander of the Allied Command Europe Rapid Reaction Corps, with the assistance of a Bosnian interpreter and a German interpreter, speaks to the German Army Engineers and the local Bosnian population gathered there to witness the official opening ceremony. Beginning in December, 1995,...

The Donji Bratinia Bridge, just north of the city of Gorazde, is re-op...

The original finding aid described this photograph as: [Complete] Scene Caption: The Donji Bratinia Bridge, just north of the city of Gorazde, is re-opened after having been shut down after its' destruction by... More

The Donji Bratinia Bridge, just north of the city of Gorazde, is re-opened after having been shut down after its' destruction by North Atlantic Treaty Organization air strikes. The new bridge is a British Mabey Johnson bridge assembled by a Battallion of German Engineers belonging and supporting the Implementation Force (IFOR) in Bosnia as part of Operation JOINT ENDEAVOR. Beginning in December, 1995, US and allied nations deployed peacekeeping forces to Bosnia in support of JOINT ENDEAVOR. The provision of a secure environment is at the heart of the reconstruction effort in Bosnia

The Donji Bratinia Bridge, just north of the city of Gorazde, is re-op...

The original finding aid described this photograph as: Subject Operation/Series: JOINT ENDEAVOR Base: Gorazde Country: Bosnia And/I Herzegovina (BIH) Scene Camera Operator: SGT Jean-Marc Schaible, USA Rele... More

Right side rear view as engineers from the Hungarian Contingent, place a decking section onto the skeleton of the Mabey and Johnson bridge. The section will be bolted onto the bridge enabling travel across the Bosnia River. Main supply routes for Stabilization Force (SFOR) Personnel, have to be in good condition to allow freedom of movement in Bosnia-Herzegovina. Many bridges are downgraded by Stabilization Force (SFOR), Engineers due to various safety reasons. A bridge in Doboj (Not shown), failed an inspection due to heavy traffic flow. The solution to the problem is the Mabey and Johnson Bridge. The project has been on going since September and is expected to be completed November 21,...

Right side rear view as engineers from the Hungarian Contingent, place...

The original finding aid described this photograph as: [Complete] Scene Caption: Right side rear view as engineers from the Hungarian Contingent, place a decking section onto the skeleton of the Mabey and Joh... More

Right side front view medium shot as STAFF Sergeant Fereige Sass, of the Hungarian Engineering Contingent, guides a stack of decking sections onto the Mabey and Johnson bridge. The sections will be bolted on the bridges skeleton that will enable travel across the Bosnia river. Main supply routes for Stabilization Force (SFOR), Personnel have to be in good condition to allow freedom of movement in Bosnia-Herzegovina Many bridges are downgraded by Stabilization Force (SFOR), Engineers due to various safety reasons. A bridge in Doboj (Not shown), failed an inspection due to heavy traffic flow. The solution to the problem is the Mabey and Johnson Bridge. The project has been on going since ...

Right side front view medium shot as STAFF Sergeant Fereige Sass, of t...

The original finding aid described this photograph as: [Complete] Scene Caption: Right side front view medium shot as Staff Sergeant Fereige Sass, of the Hungarian Engineering Contingent, guides a stack of de... More

Straight on close-up shot of the hands as MASTER Sergeant Zoltan, Urban of the Hungarian Engineer Contingent, latches a decking section onto the skeleton of the Mabey and Johnson Bridge. The sections on the bridge will enable travel across the Bosnia river. Main supply routes for Stabilization Force (SFOR) Personnel, have to be in good condition to allow freedom of movement in Bosnia-Herzegovina. Many bridges are downgraded by Stabilization Force (SFOR), Engineers due to various safety reasons. A bridge in Doboj (Not shown), failed an inspection due to heavy traffic flow. The solution to the problem is the Mabey and Johnson Bridge. The project has been on going since September and is ...

Straight on close-up shot of the hands as MASTER Sergeant Zoltan, Urba...

The original finding aid described this photograph as: [Complete] Scene Caption: Straight on close-up shot of the hands as Master Sergeant Zoltan, Urban of the Hungarian Engineer Contingent, latches a decking... More

Rear side rear view medium close-up shot as Sergeant Aurel Lazarica, a Romanian welder welds the base of the bridge as the Hungarian Engineers, latch decking sections unto the skeleton of the Mabey and Johnson Bridge. The sections on the bridge will enable travel across the Bosnia River. Main supply routes for Stabilization Force (SFOR) Personnel (Not shown), have to be in good condition to allow freedom of movement in Bosnia-Herzegovina. Many bridges are downgraded by Stabilization Force(SFOR), Engineers due to various safety reasons. A bridge in Doboj (Not shown), failed an inspection due to heavy traffic flow. The solution to the problem is the Mabey and Johnson Bridge. The project has...

Rear side rear view medium close-up shot as Sergeant Aurel Lazarica, a...

The original finding aid described this photograph as: [Complete] Scene Caption: Rear side rear view medium close-up shot as Sergeant Aurel Lazarica, a Romanian welder welds the base of the bridge as the Hung... More

Right side rear view medium close-up shot as a Desta Lifter is used to maneuver a decking section unto the skeleton of the Mabey and Johnson Bridge. The section will be bolted onto the bridge enabling travel across the Bosnia River. Main supply routes for Stabilization Force (SFOR), Personnel have to be in good condition to allow freedom of movement in Bosnia-Herzegovina. Many bridges are downgraded by Stabilization Force (SFOR), Engineers due to various safety reasons. A bridge in Doboj (Not shown), failed an inspection due to heavy traffic flow. The solution to the problem is the Mabey and Johnson Bridge. The project has been on going since September and is expected to be completed ...

Right side rear view medium close-up shot as a Desta Lifter is used to...

The original finding aid described this photograph as: [Complete] Scene Caption: Right side rear view medium close-up shot as a Desta Lifter is used to maneuver a decking section unto the skeleton of the Mabe... More

Supply routes for Stabilization Force (SFOR), Personnel have to be in good condition to allow freedom of movement in Bosnia-Herzegovina. Many bridges are downgraded by Stabilization Force (SFOR), Engineers due to various safety reasons. A bridge in Doboj, failed an inspection due to heavy traffic flow. The solution to the problem is the Mabey and Johnson Bridge which is to be built by the Hungarian Engineering Contingent. The project has been on going since September and is expected to be completed November 21, 1998. Today the Hungarians latched decking sections on the Bridges skeleton that will enable travel across the Bosnia river

Supply routes for Stabilization Force (SFOR), Personnel have to be in ...

The original finding aid described this photograph as: Subject Operation/Series: JOINT FORGE Base: Doboj Country: Bosnia And/I Herzegovina (BIH) Scene Camera Operator: SRA Omolara Akinretoye, USAF Release ... More

Portrait of DoD Mr. Dan W. Mabey, Deputy for Contracting, Ballistic Missile Defense Organization, (U.S. Army photo by Mr. Scott Davis) (Released) (PC-193336)

Portrait of DoD Mr. Dan W. Mabey, Deputy for Contracting, Ballistic Mi...

The original finding aid described this photograph as: Base: Pentagon State: District Of Columbia (DC) Country: United States Of America (USA) Scene Camera Operator: Scott Davis Release Status: Released to... More

Mabey bridge build in southern Afghanistan

Mabey bridge build in southern Afghanistan

U.S. Soldiers, bridge crewman with the 132nd Multirole Bridge Company (Task Force Warhammer), emplace a decking panel during a Mabey bridge build in Helmand province, Afghanistan, Aug. 1, 2012. The unit has con... More

Members of Naval Mobile Construction Battalion 25 (NMCB-25)

Members of Naval Mobile Construction Battalion 25 (NMCB-25)

Members of Naval Mobile Construction Battalion 25 (NMCB-25) and other battalions enjoy a lunch break by a nearly complete Mabey-Johnson bridge during bridge construction training Feb. 18. The Mabey-Johnson is a... More

Members of Naval Mobile Construction Battalion Two

Members of Naval Mobile Construction Battalion Two

Members of Naval Mobile Construction Battalion Two Five (NMCB-25) finish installation of a push bay during Mabey-Johnson bridge construction training Feb. 25. The Mabey-Johnson is a prefabricated truss bridge d... More

Clockwise from left, Builder 1st Class Michael Hoffman,

Clockwise from left, Builder 1st Class Michael Hoffman,

Clockwise from left, Builder 1st Class Michael Hoffman, Steelworker 1st Class Patrick Crose, and Builder 3rd Class Paul Dishon, of Naval Mobile Construction Battalion Two Five (NMCB-25), begin deconstruction of... More

Builder 2nd Class Nino Hernandez-Navario, left, and

Builder 2nd Class Nino Hernandez-Navario, left, and

Builder 2nd Class Nino Hernandez-Navario, left, and Builder 1st Class (SCW) Craig Lawrence, of Naval Mobile Construction Battalion Two Five (NMCB-25), remove the sway bracing of a a Mabey-Johnson bridge during ... More

Members of Naval Mobile Construction Battalion Two

Members of Naval Mobile Construction Battalion Two

Members of Naval Mobile Construction Battalion Two Five (NMCB-25) and NMCB-11 remove a transom cross girder from a Mabey-Johnson bridge during bridge construction training Feb. 25. The Mabey-Johnson is a pre-fa... More

Members of Naval Mobile Construction Battalion Two

Members of Naval Mobile Construction Battalion Two

Members of Naval Mobile Construction Battalion Two Five (NMCB-25) and NMCB-11 remove a transom cross girder from a Mabey-Johnson bridge during bridge construction training Feb. 25. The Mabey-Johnson is a prefab... More

Members of Naval Mobile Construction Battalion Two

Members of Naval Mobile Construction Battalion Two

Members of Naval Mobile Construction Battalion Two Five (NMCB-25) and NMCB-11 remove a transom cross girder from a Mabey-Johnson bridge during bridge construction training Feb. 25. The Mabey-Johnson is a prefab... More

Members of Naval Mobile Construction Battalion Two

Members of Naval Mobile Construction Battalion Two

Members of Naval Mobile Construction Battalion Two Five (NMCB-25) and NMCB-11 remove a transom cross girder from a Mabey-Johnson bridge during bridge construction training Feb. 25. The Mabey-Johnson is a prefab... More

Members of Naval Mobile Construction Battalion Two

Members of Naval Mobile Construction Battalion Two

Members of Naval Mobile Construction Battalion Two Five (NMCB-25) and NMCB-11 move a transom cross girder from a Mabey-Johnson bridge to a 12K forklift during bridge construction training Feb. 25. The Mabey-Joh... More

Steelworker 1st Class (SCW) John Corcoran, of Naval

Steelworker 1st Class (SCW) John Corcoran, of Naval

Steelworker 1st Class (SCW) John Corcoran, of Naval Mobile Construction Battalion Two Five (NMCB-25), installs a lift strap to remove a panel on a Mabey-Johnson bridge during bridge construction training Feb. 2... More

A 12K forklift operator prepares to move a panel on

A 12K forklift operator prepares to move a panel on

A 12K forklift operator prepares to move a panel on a Mabey-Johnson bridge during bridge construction training Feb. 25. The Mabey-Johnson is a prefabricated truss bridge designed for use by military engineering... More

Steelworker 1st Class (SCW) John Corcoran, of Naval

Steelworker 1st Class (SCW) John Corcoran, of Naval

Steelworker 1st Class (SCW) John Corcoran, of Naval Mobile Construction Battalion Two Five (NMCB-25), guides a 12K forklift operator to remove a panel on a Mabey-Johnson bridge during bridge construction traini... More