crew check

62 media by topicpage 1 of 1
Members of the STS-102 crew check out Discovery’s payload bay in the Orbiter Processing Facility bay 1. Dressed in green, they are Mission Specialist Paul W. Richards (left) and Pilot James W. Kelly. The crew is at KSC for Crew Equipment Interface Test activities. Above their heads on the left side are two of the experiments being carried on the flight. STS-102 is the 8th construction flight to the International Space Station and will carry the Multi-Purpose Logistics Module Leonardo. STS-102 is scheduled for launch March 1, 2001. On that flight, Leonardo will be filled with equipment and supplies to outfit the U.S. laboratory module Destiny. The mission will also be carrying the Expedition Two crew to the Space Station, replacing the Expedition One crew who will return on Shuttle Discovery KSC01pp0173

Members of the STS-102 crew check out Discovery’s payload bay in the O...

Members of the STS-102 crew check out Discovery’s payload bay in the Orbiter Processing Facility bay 1. Dressed in green, they are Mission Specialist Paul W. Richards (left) and Pilot James W. Kelly. The crew i... More

Members of an M-60 crew check their tank after coming ashore during an amphibious assault in support of the multinational joint service Exercise BRIGHT STAR '85

Members of an M-60 crew check their tank after coming ashore during an...

The original finding aid described this photograph as: Base: Alexandria Country: Egypt (EGY) Scene Camera Operator: SGT L.C. Clipper Release Status: Released to Public Combined Military Service Digital Phot... More

Al Sacco, Ken Bowersox and Kent Rominger pose in middeck

Al Sacco, Ken Bowersox and Kent Rominger pose in middeck

STS073-337-021 (20 October - 5 November 1995) --- Three members of the crew check out the Zeolite Crystal Growth (ZCG) on the middeck of the Earth-orbiting Space Shuttle Columbia. Left to right are astronauts ... More

Under the watchful eyes of a KSC worker (far left), members of the STS-99 crew check out equipment in the Orbiter Processing Facility (OPF) Bay 2. From left are Mission Specialists Mamoru Mohri, Gerhard P.J. Thiele, and Janice Voss (Ph.D.). Mohri represents the National Space Development Agency (NASDA) of Japan, and Thiele the European Space Agency. Other crew members (not shown) are Commander Kevin R. Kregel, Pilot Dominic L. Pudwill Gorie, and Mission Specialist Janet Lynn Kavandi (Ph.D.). The crew are at KSC to take part in a Crew Equipment Interface Test (CEIT), which provides an opportunity for crew members to check equipment and facilities that will be aboard the orbiter during their mission. The STS-99 mission is the Shuttle Radar Topography Mission (SRTM), a specially modified radar system that will gather data for the most accurate and complete topographic map of the Earth's surface that has ever been assembled. SRTM will make use of radar interferometry, wherein two radar images are taken from slightly different locations. Differences between these images allow for the calculation of surface elevation, or change. The SRTM hardware will consist of one radar antenna in the shuttle payload bay and a second radar antenna attached to the end of a mast extended 60 meters (195 feet) out from the shuttle. STS-99 is scheduled to launch Sept. 16 at 8:47 a.m. from Launch Pad 39A KSC-99pp0995

Under the watchful eyes of a KSC worker (far left), members of the STS...

Under the watchful eyes of a KSC worker (far left), members of the STS-99 crew check out equipment in the Orbiter Processing Facility (OPF) Bay 2. From left are Mission Specialists Mamoru Mohri, Gerhard P.J. Th... More

During a Crew Equipment Interface Test in the Payload Hazardous Servicing Facility, members of the STS-103 crew check out the top of the Flight Support System (FSS) for the mission, the repair and upgrade of the Hubble Space Telescope. The number one in the foreground refers to one of the berthing latches on the FSS. The seven-member crew comprises Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D), Claude Nicollier of Switzerland, and Jean-François Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review KSC-99pp1095

During a Crew Equipment Interface Test in the Payload Hazardous Servic...

During a Crew Equipment Interface Test in the Payload Hazardous Servicing Facility, members of the STS-103 crew check out the top of the Flight Support System (FSS) for the mission, the repair and upgrade of th... More

During a Crew Equipment Interface Test, members of the STS-103 crew check out new Multi-Layer Insulation (MLI) for the Hubble Space Telescope. The payload hardware is in the Payload Hazardous Servicing Facility. From left are Mission Specialists Claude Nicollier of Switzerland, Steven L. Smith, C. Michael Foale (Ph.D.), and John M. Grunsfeld (Ph.D.). Other members of the crew are Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialist Jean-François Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with the MLI. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review KSC-99pp1093

During a Crew Equipment Interface Test, members of the STS-103 crew ch...

During a Crew Equipment Interface Test, members of the STS-103 crew check out new Multi-Layer Insulation (MLI) for the Hubble Space Telescope. The payload hardware is in the Payload Hazardous Servicing Facility... More

During a Crew Equipment Interface Test (CEIT), members of the STS-103 crew check out a portable foot restraint on the Flight Support System that will be used on the mission, repairing the Hubble Space Telescope. The seven-member crew comprises Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D), Claude Nicollier of Switzerland, and Jean-François Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review KSC-99pp1098

During a Crew Equipment Interface Test (CEIT), members of the STS-103 ...

During a Crew Equipment Interface Test (CEIT), members of the STS-103 crew check out a portable foot restraint on the Flight Support System that will be used on the mission, repairing the Hubble Space Telescope... More

During a Crew Equipment Interface Test in the Payload Hazardous Servicing Facility, members of the STS-103 crew check out the Flight Support System (FSS)from above and below. The FSS is part of the primary payload on the mission to repair the Hubble Space Telescope. The seven-member crew comprises Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D), Claude Nicollier of Switzerland, and Jean-François Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review KSC-99pp1094

During a Crew Equipment Interface Test in the Payload Hazardous Servic...

During a Crew Equipment Interface Test in the Payload Hazardous Servicing Facility, members of the STS-103 crew check out the Flight Support System (FSS)from above and below. The FSS is part of the primary payl... More

During a Crew Equipment Interface Test (CEIT), members of the STS-103 crew check out tools to be used on planned Extravehicular Activities (EVAs) on the mission for repair of the Hubble Space Telescope. In uniform, from left, are Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), Claude Nicollier of Switzerland, and John M. Grunsfeld (Ph.D.). Other crew members at KSC for the CEIT are Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Jean-François Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review KSC-99pp1099

During a Crew Equipment Interface Test (CEIT), members of the STS-103 ...

During a Crew Equipment Interface Test (CEIT), members of the STS-103 crew check out tools to be used on planned Extravehicular Activities (EVAs) on the mission for repair of the Hubble Space Telescope. In unif... More

Members of the STS-98 crew check out equipment in the U.S. Lab Destiny during a Multi-Equipment Interface Test. During the mission, the crew will install the Lab in the International Space Station during a series of three space walks. The STS-98 mission will provide the station with science research facilities and expand its power, life support and control capabilities. The U.S. Laboratory Module continues a long tradition of microgravity materials research, first conducted by Skylab and later Shuttle and Spacelab missions. Destiny is expected to be a major feature in future research, providing facilities for biotechnology, fluid physics, combustion, and life sciences research. Making up the five-member crew on STS-98 are Commander Kenneth D. Cockrell, Pilot Mark L. Polansky, and Mission Specialists Robert L. Curbeam Jr., Thomas D. Jones (Ph.D.) and Marsha S. Ivins. The Lab is planned for launch aboard Space Shuttle Atlantis on the sixth ISS flight, currently targeted no earlier than Aug. 19, 2000 KSC-00pp0175

Members of the STS-98 crew check out equipment in the U.S. Lab Destiny...

Members of the STS-98 crew check out equipment in the U.S. Lab Destiny during a Multi-Equipment Interface Test. During the mission, the crew will install the Lab in the International Space Station during a seri... More

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB, Port Canaveral, Fla., members of the STS-106 crew check out part of the payload, called TVIS, on their mission to the International Space Station. From left are Mission Specialist Boris Morukov, who is with the Russian Space Agency, Pilot Scott Altman and Mission Specialist Edward Lu. TVIS is the Treadmill Vibration Isolation System, a device to collect data on how vibrations imparted by crew exercise may be reduced or eliminated on the International Space Station. Those vibrations could disturb delicate microgravity experiments on the Space Station. During the mission, the crew will complete service module support tasks on orbit, transfer supplies and outfit the Space Station for the first long-duration crew. STS-106 is scheduled to launch Sept. 8 KSC-00pp0787

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB, Port Canaveral, Fla., membe...

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB, Port Canaveral, Fla., members of the STS-106 crew check out part of the payload, called TVIS, on their mission to the International Space Station. From left are Missio... More

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB, Port Canaveral, Fla., members of the STS-106 crew check out part of the payload, called TVIS, on their mission to the International Space Station. From left are Mission Specialist Boris Morukov, who is with the Russian Space Agency, Pilot Scott Altman and Mission Specialist Edward Lu. TVIS is the Treadmill Vibration Isolation System, a device to collect data on how vibrations imparted by crew exercise may be reduced or eliminated on the International Space Station. Those vibrations could disturb delicate microgravity experiments on the Space Station. During the mission, the crew will complete service module support tasks on orbit, transfer supplies and outfit the Space Station for the first long-duration crew. STS-106 is scheduled to launch Sept. 8 KSC00pp0787

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB, Port Canaveral, Fla., membe...

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB, Port Canaveral, Fla., members of the STS-106 crew check out part of the payload, called TVIS, on their mission to the International Space Station. From left are Missio... More

As part of Crew Equipment Interface Test (CEIT) activities, members of the STS-92 crew check out equipment they will be using on the mission to the International Space Station. At left is Mission Specialist Leroy Chiao, looking at part of the Integrated Truss Structure Z1, a component of the Station and payload on STS-92. Others seen in the photo are Mission Specialists Michael Lopez-Alegria (on his back, lower right); Jeff Wisoff (standing in back); and Bill McArthur (bending closer to the Z1 truss). Also taking part in the CIET are Commander Brian Duffy, Pilot Pam Melroy, and Mission Specialist Koichi Wakata. STS-92 is scheduled to launch Oct. 5 from launch Pad 39A KSC-00pp0903

As part of Crew Equipment Interface Test (CEIT) activities, members of...

As part of Crew Equipment Interface Test (CEIT) activities, members of the STS-92 crew check out equipment they will be using on the mission to the International Space Station. At left is Mission Specialist Ler... More

As part of Crew Equipment Interface Test (CEIT) activities, members of the STS-92 crew check out equipment they will be using on the mission to the International Space Station. Mission Specialists Michael Lopez-Alegria (center) and Jeff Wisoff (right) talk with Boeing technicians about the Integrated Truss Structure Z1, a component of the Station and payload on STS-92, in front of them. The Z1 truss is an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. STS-92 is scheduled to launch Oct. 5 from launch Pad 39A KSC-00pp0905

As part of Crew Equipment Interface Test (CEIT) activities, members of...

As part of Crew Equipment Interface Test (CEIT) activities, members of the STS-92 crew check out equipment they will be using on the mission to the International Space Station. Mission Specialists Michael Lopez... More

Members of the STS-92 crew check out the Integrated Truss Structure Z1, a component of the International Space Station and payload on their mission. From left are Mission Specialists Michael Lopez-Alegria, Bill McArthur, Jeff Wisoff and (kneeling) Leroy Chiao. They and other crew members are taking part in Crew Equipment Interface Test (CEIT) activities while at KSC. The Z1 truss is an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. STS-92 is scheduled to launch Oct. 5 from launch Pad 39A KSC00pp0907

Members of the STS-92 crew check out the Integrated Truss Structure Z1...

Members of the STS-92 crew check out the Integrated Truss Structure Z1, a component of the International Space Station and payload on their mission. From left are Mission Specialists Michael Lopez-Alegria, Bill... More

In the Space Station Processing Facility, members of the STS-92 crew check out equipment they will be using on the mission to the International Space Station. Here, (left to right) Mission Specialists Jeff Wisoff and Leroy Chiao watch while Michael Lopez-Alegria practices putting on and taking off fittings on the Z1 Integrated Truss Structure. In the background are Boeing technicians. The Z-1 truss, a component of the Station, is an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. STS-92 is scheduled to launch Oct. 5 from launch Pad 39A KSC-00pp0904

In the Space Station Processing Facility, members of the STS-92 crew c...

In the Space Station Processing Facility, members of the STS-92 crew check out equipment they will be using on the mission to the International Space Station. Here, (left to right) Mission Specialists Jeff Wiso... More

Members of the STS-92 crew check out the Integrated Truss Structure Z1, a component of the International Space Station and payload on their mission. From left are Mission Specialists Michael Lopez-Alegria, Bill McArthur, Jeff Wisoff and (kneeling) Leroy Chiao. They and other crew members are taking part in Crew Equipment Interface Test (CEIT) activities while at KSC. The Z1 truss is an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. STS-92 is scheduled to launch Oct. 5 from launch Pad 39A KSC-00pp0907

Members of the STS-92 crew check out the Integrated Truss Structure Z1...

Members of the STS-92 crew check out the Integrated Truss Structure Z1, a component of the International Space Station and payload on their mission. From left are Mission Specialists Michael Lopez-Alegria, Bill... More

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test activities, the STS-106 crew check out equipment inside the SPACEHAB module. From left are Mission Specialists Boris V. Morukov, Edward T. Lu (kneeling), Yuri I. Malenchenko (back to camera) and Richard A. Mastracchio; and Commander Terrence W. Wilcutt. Malenchenko and Morukov represent the Russian Aviation and Space Agency. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B on an 11-day mission to the International Space Station. The seven-member crew will prepare the Space Station for its first resident crew and begin outfitting the newly arrived Zvezda Service Module. They will perform support tasks on orbit, transfer supplies and prepare the Zvezda living quarters for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall KSC-00pp0948

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test act...

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test activities, the STS-106 crew check out equipment inside the SPACEHAB module. From left are Mission Specialists Boris V. Morukov, Edward T. Lu (... More

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test (CEIT) activities at SPACEHAB, members of the STS-106 crew check out a Russian foot restraint, equipment that will be part of the payload on their mission to the International Space Station. Around the table are Mission Specialist Yuri I. Malenchenko (back to camera), a SPACEHAB worker, and Mission Specialists Daniel C. Burbank (at end of table) and Edward T. Lu (right). Others at KSC for the CEIT are Commander Terrence W. Wilcutt, Pilot Scott D. Altman, and Mission Specialists Boris V. Morukov and Richard A. Mastracchio. Malenchenko and Morukov represent the Russian Aviation and Space Agency. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B KSC00pp0961

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test (CE...

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test (CEIT) activities at SPACEHAB, members of the STS-106 crew check out a Russian foot restraint, equipment that will be part of the payload on th... More

KENNEDY SPACE CENTER, FLA. -- As part of Crew Equipment Interface Test (CEIT) activities at SPACEHAB, members of the STS-106 crew check out a Maximum Envelope Support Structure (MESS) rack they will be using during their mission to the International Space Station. Seen here (with backs to camera, in uniform) are Mission Specialist Richard A. Mastracchio, Pilot Scott D. Altman, Boris V. Morukov, and Edward T. Lu (at right). Also taking part in the CEIT are Commander Terrence W. Wilcutt and Mission Specialists Yuri I. Malenchenko and Daniel C. Burbank. Malenchenko and Morukov represent the Russian Aviation and Space Agency. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B on an 11-day mission. The seven-member crew will prepare the Space Station for its first resident crew and begin outfitting the newly arrived Zvezda Service Module. They will perform support tasks on orbit, transfer supplies and prepare the Zvezda living quarters for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall KSC00pp0952

KENNEDY SPACE CENTER, FLA. -- As part of Crew Equipment Interface Test...

KENNEDY SPACE CENTER, FLA. -- As part of Crew Equipment Interface Test (CEIT) activities at SPACEHAB, members of the STS-106 crew check out a Maximum Envelope Support Structure (MESS) rack they will be using du... More

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. From left are Mission Specialists Richard A. Mastracchio, Daniel C. Burbank, Yuri I. Malenchenko, Edward T. Lu and Boris V. Morukov. Behind Lu is Pilot Scott D. Altman. Not seen is Commander Terrence W. Wilcutt. Malenchenko and Morukov represent the Russian Aviation and Space Agency. The astronauts are taking part in Crew Equipment Interface Test activities at KSC. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module for the first long-duration crew, dubbed "Expedition One," which is due to arrive at the Station in late fall. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B KSC-00pp0955

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew ...

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. From left are Mission Specialists Richard A.... More

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. From left are Mission Specialists Richard A. Mastracchio, Daniel C. Burbank, Yuri I. Malenchenko, Edward T. Lu and Boris V. Morukov. Behind Lu is Pilot Scott D. Altman. Not seen is Commander Terrence W. Wilcutt. Malenchenko and Morukov represent the Russian Aviation and Space Agency. The astronauts are taking part in Crew Equipment Interface Test activities at KSC. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module for the first long-duration crew, dubbed "Expedition One," which is due to arrive at the Station in late fall. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B KSC00pp0955

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew ...

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. From left are Mission Specialists Richard A.... More

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. From left to right are Mission Specialists Boris V. Morukov, Yuri I. Malenchenko, Edward T. Lu and Daniel C. Burbank. They and other crew members Commander Terrence W. Wilcutt, Pilot Scott D. Altman and Mission Specialist Robert A. Mastracchio are taking part in Crew Equipment Interface Test activities at KSC. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B KSC-00pp0953

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew ...

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. From left to right are Mission Specialists B... More

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. Starting second from left, they are Mission Specialists Daniel C. Burbank, Edward T. Lu, and Yuri I. Malenchenkov; Pilot Scott D. Altman, and Mission Specialists Richard A. Mastracchio and Boris V. Morukov. Not seen is Commander Terrence W. Wilcutt. Malenchenko and Morukov represent the Russian Aviation and Space Agency. The crew is taking part in Crew Equipment Interface Test activities at KSC. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B KSC00pp0954

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew ...

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. Starting second from left, they are Mission ... More

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. From left are Commander Terrence W. Wilcutt, Pilot Scott D. Altman, and Mission Specialists Yuri I. Malenchenko (standing), Boris V. Morukov, Edward T. Lu (also standing), and (in the foreground, right) Daniel C. Burbank. Malenchenko and Morukov represent the Russian Aviation and Space Agency. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B on an 11-day mission. The seven-member crew will prepare the Space Station for its first resident crew and begin outfitting the newly arrived Zvezda Service Module. They will perform support tasks on orbit, transfer supplies and prepare the Zvezda living quarters for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall KSC00pp0951

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew ...

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. From left are Commander Terrence W. Wilcutt,... More

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. From left are (next to trainer) Mission Specialist Daniel C. Burbank, Pilot Scott D. Altman, and Mission Specialists Yuri I. Malenchenko, Richard A. Mastracchio and Edward T. Lu. Malenchenko and Morukov represent the Russian Aviation and Space Agency. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B on an 11-day mission. The seven-member crew will prepare the Space Station for its first resident crew and begin outfitting the newly arrived Zvezda Service Module. They will perform support tasks on orbit, transfer supplies and prepare the Zvezda living quarters for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall. KSC00pp0950

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew ...

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. From left are (next to trainer) Mission Spec... More

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. From left are Commander Terrence W. Wilcutt, Pilot Scott D. Altman, and Mission Specialists Yuri I. Malenchenko (standing), Boris V. Morukov, Edward T. Lu (also standing), and (in the foreground, right) Daniel C. Burbank. Malenchenko and Morukov represent the Russian Aviation and Space Agency. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B on an 11-day mission. The seven-member crew will prepare the Space Station for its first resident crew and begin outfitting the newly arrived Zvezda Service Module. They will perform support tasks on orbit, transfer supplies and prepare the Zvezda living quarters for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall KSC-00pp0951

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew ...

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. From left are Commander Terrence W. Wilcutt,... More

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test activities, the STS-106 crew check out equipment inside the SPACEHAB module. From left are Mission Specialists Boris V. Morukov, Edward T. Lu (kneeling), Yuri I. Malenchenko (back to camera) and Richard A. Mastracchio; and Commander Terrence W. Wilcutt. Malenchenko and Morukov represent the Russian Aviation and Space Agency. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B on an 11-day mission to the International Space Station. The seven-member crew will prepare the Space Station for its first resident crew and begin outfitting the newly arrived Zvezda Service Module. They will perform support tasks on orbit, transfer supplies and prepare the Zvezda living quarters for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall KSC00pp0948

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test act...

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test activities, the STS-106 crew check out equipment inside the SPACEHAB module. From left are Mission Specialists Boris V. Morukov, Edward T. Lu (... More

KENNEDY SPACE CENTER, FLA. -- As part of Crew Equipment Interface Test (CEIT) activities at SPACEHAB, members of the STS-106 crew check out a Maximum Envelope Support Structure (MESS) rack they will be using during their mission to the International Space Station. Seen here (with backs to camera, in uniform) are Mission Specialist Richard A. Mastracchio, Pilot Scott D. Altman, Boris V. Morukov, and Edward T. Lu (at right). Also taking part in the CEIT are Commander Terrence W. Wilcutt and Mission Specialists Yuri I. Malenchenko and Daniel C. Burbank. Malenchenko and Morukov represent the Russian Aviation and Space Agency. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B on an 11-day mission. The seven-member crew will prepare the Space Station for its first resident crew and begin outfitting the newly arrived Zvezda Service Module. They will perform support tasks on orbit, transfer supplies and prepare the Zvezda living quarters for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall KSC-00pp0952

KENNEDY SPACE CENTER, FLA. -- As part of Crew Equipment Interface Test...

KENNEDY SPACE CENTER, FLA. -- As part of Crew Equipment Interface Test (CEIT) activities at SPACEHAB, members of the STS-106 crew check out a Maximum Envelope Support Structure (MESS) rack they will be using du... More

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test (CEIT) activities at SPACEHAB, members of the STS-106 crew check out a Russian foot restraint, equipment that will be part of the payload on their mission to the International Space Station. Around the table are Mission Specialist Yuri I. Malenchenko (back to camera), a SPACEHAB worker, and Mission Specialists Daniel C. Burbank (at end of table) and Edward T. Lu (right). Others at KSC for the CEIT are Commander Terrence W. Wilcutt, Pilot Scott D. Altman, and Mission Specialists Boris V. Morukov and Richard A. Mastracchio. Malenchenko and Morukov represent the Russian Aviation and Space Agency. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B KSC-00pp0961

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test (CE...

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test (CEIT) activities at SPACEHAB, members of the STS-106 crew check out a Russian foot restraint, equipment that will be part of the payload on th... More

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. Starting second from left, they are Mission Specialists Daniel C. Burbank, Edward T. Lu, and Yuri I. Malenchenkov; Pilot Scott D. Altman, and Mission Specialists Richard A. Mastracchio and Boris V. Morukov. Not seen is Commander Terrence W. Wilcutt. Malenchenko and Morukov represent the Russian Aviation and Space Agency. The crew is taking part in Crew Equipment Interface Test activities at KSC. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B KSC-00pp0954

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew ...

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. Starting second from left, they are Mission ... More

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. From left to right are Mission Specialists Boris V. Morukov, Yuri I. Malenchenko, Edward T. Lu and Daniel C. Burbank. They and other crew members Commander Terrence W. Wilcutt, Pilot Scott D. Altman and Mission Specialist Robert A. Mastracchio are taking part in Crew Equipment Interface Test activities at KSC. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B KSC00pp0953

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew ...

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. From left to right are Mission Specialists B... More

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. From left are (next to trainer) Mission Specialist Daniel C. Burbank, Pilot Scott D. Altman, and Mission Specialists Yuri I. Malenchenko, Richard A. Mastracchio and Edward T. Lu. Malenchenko and Morukov represent the Russian Aviation and Space Agency. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B on an 11-day mission. The seven-member crew will prepare the Space Station for its first resident crew and begin outfitting the newly arrived Zvezda Service Module. They will perform support tasks on orbit, transfer supplies and prepare the Zvezda living quarters for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall. KSC-00pp0950

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew ...

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. From left are (next to trainer) Mission Spec... More

KENNEDY SPACE CENTER, FLA. -- Members of the STS-107 crew check out equipment at SPACEHAB. Beginning in the center are Mission Specialists Michael Anderson and Laurel Clark; at far right are Ilan Ramon, from Israel, and Kalpana Chawla. Identified as a research mission, STS-107 is scheduled for launch July 19, 2001 KSC00pp1591

KENNEDY SPACE CENTER, FLA. -- Members of the STS-107 crew check out eq...

KENNEDY SPACE CENTER, FLA. -- Members of the STS-107 crew check out equipment at SPACEHAB. Beginning in the center are Mission Specialists Michael Anderson and Laurel Clark; at far right are Ilan Ramon, from Is... More

KENNEDY SPACE CENTER, FLA. -- Members of the STS-107 crew check out equipment at SPACEHAB. Beginning in the center are Mission Specialists Michael Anderson and Laurel Clark; at far right are Ilan Ramon, from Israel, and Kalpana Chawla. Identified as a research mission, STS-107 is scheduled for launch July 19, 2001 KSC-00pp1591

KENNEDY SPACE CENTER, FLA. -- Members of the STS-107 crew check out eq...

KENNEDY SPACE CENTER, FLA. -- Members of the STS-107 crew check out equipment at SPACEHAB. Beginning in the center are Mission Specialists Michael Anderson and Laurel Clark; at far right are Ilan Ramon, from Is... More

In the Space Station Processing Facility, workers at left watch while members of the STS-98 crew check out equipment inside the U.S. Lab, Destiny (at right). The crew comprises Commander Ken Cockrell, Pilot Mark Polansky and Mission Specialists Robert Curbeam, Thomas Jones and Marsha Ivins. They are taking part in Crew Equipment Interface Test activities, becoming familiar with equipment they will be handling during the mission. The mission will be transporting the Lab to the International Space Station with five system racks already installed inside of the module. With delivery of electronics in the lab, electrically powered attitude control for Control Moment Gyroscopes will be activated. The STS-98 launch is scheduled for Jan. 18, 2001 KSC-00pp1599

In the Space Station Processing Facility, workers at left watch while ...

In the Space Station Processing Facility, workers at left watch while members of the STS-98 crew check out equipment inside the U.S. Lab, Destiny (at right). The crew comprises Commander Ken Cockrell, Pilot Mar... More

In the Space Station Processing Facility, workers in the foreground watch and wait while members of the STS-98 crew check out the U.S. Lab, Destiny in the background. The crew comprises Commander Ken Cockrell, Pilot Mark Polansky and Mission Specialists Robert Curbeam, Thomas Jones and Marsha Ivins. They are taking part in Crew Equipment Interface Test activities, becoming familiar with equipment they will be handling during the mission. The mission will be transporting the Lab to the International Space Station with five system racks already installed inside of the module. With delivery of electronics in the lab, electrically powered attitude control for Control Moment Gyroscopes will be activated. The STS-98 launch is scheduled for Jan. 18, 2001 KSC-00pp1600

In the Space Station Processing Facility, workers in the foreground wa...

In the Space Station Processing Facility, workers in the foreground watch and wait while members of the STS-98 crew check out the U.S. Lab, Destiny in the background. The crew comprises Commander Ken Cockrell, ... More

In the Space Station Processing Facility, members of the STS-98 crew check out equipment in the U.S. Lab, Destiny, with the help of workers. In the background, looking over her shoulder, is Mission Specialist Marsha Ivins. Others in the crew are Commander Ken Cockrell, Pilot Mark Polansky and Mission Specialists Robert Curbeam and Thomas Jones. The crew is taking part in Crew Equipment Interface Test activities, becoming familiar with equipment it will be handling during the mission. The mission will be transporting the Lab to the International Space Station with five system racks already installed inside of the module. With delivery of electronics in the lab, electrically powered attitude control for Control Moment Gyroscopes will be activated. The STS-98 launch is scheduled for Jan. 18, 2001 KSC-00pp1602

In the Space Station Processing Facility, members of the STS-98 crew c...

In the Space Station Processing Facility, members of the STS-98 crew check out equipment in the U.S. Lab, Destiny, with the help of workers. In the background, looking over her shoulder, is Mission Specialist M... More

In the Space Station Processing Facility, members of the STS-98 crew check out components inside the U.S. Lab, Destiny, under the watchful eye of trainers. The crew comprises Commander Ken Cockrell, Pilot Mark Polansky and Mission Specialists Robert Curbeam, Thomas Jones and Marsha Ivins. They are taking part in Crew Equipment Interface Test activities, becoming familiar with equipment they will be handling during the mission. The mission will be transporting the Lab to the International Space Station with five system racks already installed inside of the module. With delivery of electronics in the lab, electrically powered attitude control for Control Moment Gyroscopes will be activated. The STS-98 launch is scheduled for Jan. 18, 2001 KSC-00pp1598

In the Space Station Processing Facility, members of the STS-98 crew c...

In the Space Station Processing Facility, members of the STS-98 crew check out components inside the U.S. Lab, Destiny, under the watchful eye of trainers. The crew comprises Commander Ken Cockrell, Pilot Mark ... More

KENNEDY SPACE CENTER, FLA. -- As part of In-Flight Maintenance training, members of the STS-107 crew check out one of the Biotube experiments that will be part of their research mission . From left (in uniform) are Mission Specialist David M. Brown, Payload Specialist Ilan Ramon of Israel, and Mission Specialist Kalpana Chawla; Pilot William C. “Willie” McCool (crouching behind the table); Commander Rick D. Husband; and Mission Specialist Laurel Clark. At right is project engineer April Boody. As a research mission, STS-107 will carry the SPACEHAB Double Module in its first research flight into space and a broad collection of experiments ranging from material science to life science. It is scheduled to launch July 19, 2001 KSC00pp1846

KENNEDY SPACE CENTER, FLA. -- As part of In-Flight Maintenance trainin...

KENNEDY SPACE CENTER, FLA. -- As part of In-Flight Maintenance training, members of the STS-107 crew check out one of the Biotube experiments that will be part of their research mission . From left (in uniform)... More

KENNEDY SPACE CENTER, FLA. -- As part of In-Flight Maintenance training, members of the STS-107 crew check out one of the Biotube experiments that will be part of their research mission. From left (in uniform) are Payload Specialist Ilan Ramon of Israel, Mission Specialists David M. Brown and Kalpana Chawla, Pilot William C. “Willie” McCool (crouching behind the table), Commander Rick D. Husband, and Mission Specialist Laurel Clark. STS-107 will carry the SPACEHAB Double Module in its first research flight into space and a broad collection of experiments ranging from material science to life science. It is scheduled to launch July 19, 2001 KSC00pp1847

KENNEDY SPACE CENTER, FLA. -- As part of In-Flight Maintenance trainin...

KENNEDY SPACE CENTER, FLA. -- As part of In-Flight Maintenance training, members of the STS-107 crew check out one of the Biotube experiments that will be part of their research mission. From left (in uniform) ... More

KENNEDY SPACE CENTER, FLA. -- As part of In-Flight Maintenance training, members of the STS-107 crew check out one of the Biotube experiments that will be part of their research mission . From left (in uniform) are Mission Specialist David M. Brown, Payload Specialist Ilan Ramon of Israel, and Mission Specialist Kalpana Chawla; Pilot William C. “Willie” McCool (crouching behind the table); Commander Rick D. Husband; and Mission Specialist Laurel Clark. At right is project engineer April Boody. As a research mission, STS-107 will carry the SPACEHAB Double Module in its first research flight into space and a broad collection of experiments ranging from material science to life science. It is scheduled to launch July 19, 2001 KSC-00pp1846

KENNEDY SPACE CENTER, FLA. -- As part of In-Flight Maintenance trainin...

KENNEDY SPACE CENTER, FLA. -- As part of In-Flight Maintenance training, members of the STS-107 crew check out one of the Biotube experiments that will be part of their research mission . From left (in uniform)... More

KENNEDY SPACE CENTER, FLA. -- As part of In-Flight Maintenance training, members of the STS-107 crew check out one of the Biotube experiments that will be part of their research mission. From left (in uniform) are Payload Specialist Ilan Ramon of Israel, Mission Specialists David M. Brown and Kalpana Chawla, Pilot William C. “Willie” McCool (crouching behind the table), Commander Rick D. Husband, and Mission Specialist Laurel Clark. STS-107 will carry the SPACEHAB Double Module in its first research flight into space and a broad collection of experiments ranging from material science to life science. It is scheduled to launch July 19, 2001 KSC-00pp1847

KENNEDY SPACE CENTER, FLA. -- As part of In-Flight Maintenance trainin...

KENNEDY SPACE CENTER, FLA. -- As part of In-Flight Maintenance training, members of the STS-107 crew check out one of the Biotube experiments that will be part of their research mission. From left (in uniform) ... More

Members of the STS-102 crew check out Discovery’s payload bay in the Orbiter Processing Facility bay 1. Dressed in green, they are Mission Specialist Paul W. Richards (left) and Pilot James W. Kelly. The crew is at KSC for Crew Equipment Interface Test activities. Above their heads on the left side are two of the experiments being carried on the flight. STS-102 is the 8th construction flight to the International Space Station and will carry the Multi-Purpose Logistics Module Leonardo. STS-102 is scheduled for launch March 1, 2001. On that flight, Leonardo will be filled with equipment and supplies to outfit the U.S. laboratory module Destiny. The mission will also be carrying the Expedition Two crew to the Space Station, replacing the Expedition One crew who will return on Shuttle Discovery KSC01pp0174

Members of the STS-102 crew check out Discovery’s payload bay in the O...

Members of the STS-102 crew check out Discovery’s payload bay in the Orbiter Processing Facility bay 1. Dressed in green, they are Mission Specialist Paul W. Richards (left) and Pilot James W. Kelly. The crew i... More

Members of the STS-100 crew check out Endeavour inside the Orbiter Processing Facility bay 2. In their blue uniforms, they are (front to back) Commander Kent V. Rominger, Pilot Jeff rey S. Ashby, and Mission Specialists Yuri Lonchakov, who is with the Russian Aviation and Space Agency, and Chris Hadfield, who is with the Canadian Space Agency. Other crew members at KSC for the CEIT are Mission Specialists Scott Parazynski and Umberto Guidoni, who is with the European Space Agency. Endeavour is carrying the Multi-Purpose Logistics Module Raffaello and the Canadian robotic arm, SSRMS, to the International Space Station. Raffaello carries six system racks and two storage racks for the U.S. Lab. Launch of mission STS-100 is scheduled for April 19 at 2:41 p.m. EDT from Launch Pad 39A KSC01pp0539

Members of the STS-100 crew check out Endeavour inside the Orbiter Pro...

Members of the STS-100 crew check out Endeavour inside the Orbiter Processing Facility bay 2. In their blue uniforms, they are (front to back) Commander Kent V. Rominger, Pilot Jeff rey S. Ashby, and Mission Sp... More

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew check out equipment at the Space Station Processing Facility as part of Crew Equipment Interface Test activities. Seen are (from left) Mission Specialist Michael L. Gernhardt, Commander Steven W. Lindsey, Pilot Charles O. Hobaugh and Mission Specialist James F. Reilly II. Not shown is Mission Specialist Janet L. Kavandi. The mission will carry the Joint Airlock Module to the International Space Station. The U.S.-made module will allow astronauts and cosmonauts in residence on the Station to perform future spacewalks without the presence of a Space Shuttle. The module, which comprises a crew lock and an equipment lock, will be connected to the starboard (right) side of Node 1 Unity. Atlantis will also carry oxygen and nitrogen storage tanks, vital to operation of the Joint Airlock, on a Spacelab Logistics Double Pallet in the payload bay. The tanks, to be installed on the perimeter of the Joint Module during the mission’s spacewalks, will support future spacewalk operations and experiments plus augment the resupply system for the Station’s Service Module KSC-01pp0868

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew check out eq...

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew check out equipment at the Space Station Processing Facility as part of Crew Equipment Interface Test activities. Seen are (from left) Mission Specialis... More

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew check out equipment at the Space Station Processing Facility as part of Crew Equipment Interface Test activities. Seen are (from left) Mission Specialist Michael L. Gernhardt, Commander Steven W. Lindsey, Pilot Charles O. Hobaugh and Mission Specialist James F. Reilly II. Not shown is Mission Specialist Janet L. Kavandi. The mission will carry the Joint Airlock Module to the International Space Station. The U.S.-made module will allow astronauts and cosmonauts in residence on the Station to perform future spacewalks without the presence of a Space Shuttle. The module, which comprises a crew lock and an equipment lock, will be connected to the starboard (right) side of Node 1 Unity. Atlantis will also carry oxygen and nitrogen storage tanks, vital to operation of the Joint Airlock, on a Spacelab Logistics Double Pallet in the payload bay. The tanks, to be installed on the perimeter of the Joint Module during the mission’s spacewalks, will support future spacewalk operations and experiments plus augment the resupply system for the Station’s Service Module KSC-01pp0867

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew check out eq...

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew check out equipment at the Space Station Processing Facility as part of Crew Equipment Interface Test activities. Seen are (from left) Mission Specialis... More

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew check out equipment at the Space Station Processing Facility as part of Crew Equipment Interface Test activities. Shown are Mission Specialist James F. Reilly II (left), Pilot Charles O. Hobaugh (center) and Mission Specialist Michael L. Gernhardt (right). The mission will carry the Joint Airlock Module to the International Space Station. The U.S.-made module will allow astronauts and cosmonauts in residence on the Station to perform future spacewalks without the presence of a Space Shuttle. The module, which comprises a crew lock and an equipment lock, will be connected to the starboard (right) side of Node 1 Unity. Atlantis will also carry oxygen and nitrogen storage tanks, vital to operation of the Joint Airlock, on a Spacelab Logistics Double Pallet in the payload bay. The tanks, to be installed on the perimeter of the Joint Module during the mission’s spacewalks, will support future spacewalk operations and experiments plus augment the resupply system for the Station’s Service Module KSC-01pp0865

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew check out eq...

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew check out equipment at the Space Station Processing Facility as part of Crew Equipment Interface Test activities. Shown are Mission Specialist James F. ... More

KENNEDY SPACE CENTER, FLA. -- At the Space Station Processing Facility, members of the STS-104 crew check out equipment. At left is Mission Specialist Michael L. Gernhardt; and second from right is Mission Specialist James F. Reilly II. The crew is taking part in Crew Equipment Interface Test activities. The mission will carry the Joint Airlock Module to the International Space Station. The U.S.-made module will allow astronauts and cosmonauts in residence on the Station to perform future spacewalks without the presence of a Space Shuttle. The module, which comprises a crew lock and an equipment lock, will be connected to the starboard (right) side of Node 1 Unity. Atlantis will also carry oxygen and nitrogen storage tanks, vital to operation of the Joint Airlock, on a Spacelab Logistics Double Pallet in the payload bay. The tanks, to be installed on the perimeter of the Joint Module during the mission’s spacewalks, will support future spacewalk operations and experiments plus augment the resupply system for the Station’s Service Module KSC-01pp0864

KENNEDY SPACE CENTER, FLA. -- At the Space Station Processing Facility...

KENNEDY SPACE CENTER, FLA. -- At the Space Station Processing Facility, members of the STS-104 crew check out equipment. At left is Mission Specialist Michael L. Gernhardt; and second from right is Mission Spec... More

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test activities in Orbiter Processing Facility bay 2, members of the STS-105 crew check out some of the payload, doing sharp edge inspection. From left are Mission Specialists Patrick Forrester and Daniel Barry, accompanied by a Boeing technician (behind) and the bucket operator (right). STS-105 is the 11th mission to the International Space Station. The payload includes the Multi-Purpose Logistics Module Leonardo, which was built by the Italian Space Agency. Leonardo will be outfitted with 12 racks of experiments and equipment. Discovery is scheduled to launch July 12 from Launch Pad 39A KSC-01PP1011

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test act...

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test activities in Orbiter Processing Facility bay 2, members of the STS-105 crew check out some of the payload, doing sharp edge inspection. From l... More

KENNEDY SPACE CENTER, Fla. --  In the Operations and Checkout Building, during a Crew Equipment Interface Test,  members of the STS-110 crew check out Integrated Truss Structure (ITS) S0, which will be part of the payload on their mission.  At left is Mission Specialist Jerry L. Ross, with a camera.  Standing (center) are Mission Specialists Steven L. Smith and Rex J. Walheim.  Other crew members (not shown) are Commander Michael J. Bloomfield, Pilot Stephen N. Frick, and Missin Specialists Ellen Ochoa and Lee M. Morin.    The ITS S0 is part of the payload on the mission. It is the center segment they will be installing on the International Space Station, part of the 300-foot (91-meter) truss attached to the U.S. Lab. By assembly completion, four more truss segments will attach to either side of the S0 truss.  STS-110 is currently scheduled to launch in February 2002 KSC-01pp1565

KENNEDY SPACE CENTER, Fla. -- In the Operations and Checkout Building...

KENNEDY SPACE CENTER, Fla. -- In the Operations and Checkout Building, during a Crew Equipment Interface Test, members of the STS-110 crew check out Integrated Truss Structure (ITS) S0, which will be part of ... More

KENNEDY SPACE CENTER, Fla. --  From a vantage point below it, members of the STS-110 crew check out Integrated Truss Structure (ITS) S0, which is in the Operations and Checkout Building.  From left are Mission Specialists Rex J. Walheim, Jerry L. Ross and Lee M. Morin.  They and other crew members are taking part in a Crew Equipment Interface Test at KSC.   Not shown are Commander Michael J. Bloomfield, Pilot Stephen N. Frick, and Mission Specialists Steven L. Smith and Ellen Ochoa. The ITS S0 is part of the payload on the mission. It is the center segment they will be installing on the International Space Station, part of the 300-foot (91-meter) truss attached to the U.S. Lab. By assembly completion, four more truss segments will attach to either side of the S0 truss.  STS-110 is currently scheduled to launch in February 2002 KSC-01pp1567

KENNEDY SPACE CENTER, Fla. -- From a vantage point below it, members ...

KENNEDY SPACE CENTER, Fla. -- From a vantage point below it, members of the STS-110 crew check out Integrated Truss Structure (ITS) S0, which is in the Operations and Checkout Building. From left are Mission ... More

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, members of the STS-110 crew check out equipment that will be on their mission.  From left are Mission Specialists Steven Smith, Lee Morin, Jerry Ross and Rex Walheim.  Other crew members (not shown) are Commander Michael J. Bloomfield, Pilot Stephen N. Frick, and Mission Specialist Ellen Ochoa. Part of the payload on the mission is the Integrated Truss Structure S0.  It is the center segment that they will be installing on the International Space Station, part of the 300-foot (91-meter) truss attached to the U.S. Lab. By assembly completion, four more truss segments will attach to either side of the S0 truss.  STS-110 is currently scheduled to launch in April 2002 KSC-02pd0056

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building,...

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, members of the STS-110 crew check out equipment that will be on their mission. From left are Mission Specialists Steven Smith, Lee Morin, ... More

KENNEDY SPACE CENTER, FLA. --  Members of the STS-112 crew check out flight equipment during a Crew Equipment Interface Test at KSC.  Clockwise from front are Pilot Pamela Melroy, Commander Jeffrey Ashby, a technician, and Mission Specialist David Wolf. STS-112 is the 15th assembly flight to the International Space Station and will be ferrying the S1 Integrated Truss Structure. The S1 truss is the first starboard (right-side) truss segment, whose main job is providing structural support for the radiator panels that cool the Space Station's complex power system. The S1 truss segment also will house communications systems, external experiment positions and other subsystems.  The S1 truss will be attached to the S0 truss.  STS-112 is currently scheduled for launch Aug. 22, 2002 KSC-02PD1067

KENNEDY SPACE CENTER, FLA. -- Members of the STS-112 crew check out f...

KENNEDY SPACE CENTER, FLA. -- Members of the STS-112 crew check out flight equipment during a Crew Equipment Interface Test at KSC. Clockwise from front are Pilot Pamela Melroy, Commander Jeffrey Ashby, a tec... More

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test (CEIT), members of the STS-116 crew check out equipment they will be working with during their mission to the International Space Station. At left are Mission Specialist Christer Fugelsang, with the European Space Agency, Mission Specialist Robert Curbeam and Pilot William Oelefein.  The 19th assembly flight to the ISS, the mission will deliver the third port truss segment, the P5 Truss, to attach to second port truss segment, the P3/P4 Truss, to be assembled in an earlier mission.  STS-116 is scheduled for launch in June 2003. KSC-02pd1139

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test (CE...

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test (CEIT), members of the STS-116 crew check out equipment they will be working with during their mission to the International Space Station. At l... More

Driver of the Navy sponsored NASCAR Bush Series No. 14 Chevrolet Monte Carlo, Casey Atwood and members of his crew check out the sail onboard the Los Angeles Class submarine USS Scranton (SSN 756).

Driver of the Navy sponsored NASCAR Bush Series No. 14 Chevrolet Monte...

Norfolk, Va (Sep. 15, 2004) Driver of the Navy sponsored NASCAR Bush Series No. 14 Chevrolet Monte Carlo, Casey Atwood and members of his crew check out the sail onboard the Los Angeles-class submarine USS Scra... More

KENNEDY SPACE CENTER, FLA. -- From a lower level in the Orbiter Processing Facility, members of the STS-122 crew check out the landing gear on space shuttle Atlantis, overhead.  Dressed in their blue suits are Mission Specialist Leland Melvin, Commander Stephen Frick, European Space Agency astronaut Leopold Eyharts and Pilot Alan Poindexter.  Eyharts will be traveling to the International Space Station to join the Expedition 16 crew as a flight engineer.  The crew is at Kennedy to take part in a crew equipment interface test, or CEIT, which helps familiarize them with equipment and payloads for the mission.  Among the activities standard to a CEIT are harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs.  STS-122 is targeted for launch in December.   Photo credit: NASA/Kim Shiflett KSC-07pd2611

KENNEDY SPACE CENTER, FLA. -- From a lower level in the Orbiter Proces...

KENNEDY SPACE CENTER, FLA. -- From a lower level in the Orbiter Processing Facility, members of the STS-122 crew check out the landing gear on space shuttle Atlantis, overhead. Dressed in their blue suits are ... More

CAPE CANAVERAL, Fla. –  In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, members of the STS-127 crew check out equipment related to the Japanese Experiment Module's Experiment Logistics Module-Exposed Section, or ELM-ES, part of the payload on the mission.  The crew is  Commander Mark Polansky, Pilot Doug Hurley and Mission Specialists Christopher Cassidy, Tom Marshburn, Dave Wolf, Julie Payette and Tim Kopra. They are at Kennedy for Crew Equipment Interface Test activities, or CEIT, which provides experience handling tools, equipment and hardware for the mission. The payload will be launched to the International Space Station aboard space shuttle Endeavour on the STS-127 mission, targeted for launch on May 15. Photo credit: NASA/Dimitrios Gerondidakis KSC-2009-1137

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NA...

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, members of the STS-127 crew check out equipment related to the Japanese Experiment Module's Experiment... More

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, members of the STS-127 crew check out equipment related to the Japanese Experiment Module's Experiment Logistics Module-Exposed Section, or ELM-ES, part of the payload on the mission.  The crew is Commander Mark Polansky, Pilot Doug Hurley and Mission Specialists Christopher Cassidy, Tom Marshburn, Dave Wolf, Julie Payette and Tim Kopra. They are at Kennedy for Crew Equipment Interface Test activities, or CEIT, which provides experience handling tools, equipment and hardware for the mission. The payload will be launched to the International Space Station aboard space shuttle Endeavour on the STS-127 mission, targeted for launch on May 15. Photo credit: NASA/Dimitrios Gerondidakis KSC-2009-1130

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NAS...

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, members of the STS-127 crew check out equipment related to the Japanese Experiment Module's Experiment ... More

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, members of the STS-127 crew check out equipment on the Japanese Experiment Module's Experiment Logistics Module-Exposed Section, or ELM-ES, part of the payload on the mission.  The crew is  Commander Mark Polansky, Pilot Doug Hurley and Mission Specialists Christopher Cassidy, Tom Marshburn, Dave Wolf, Julie Payette and Tim Kopra. They are at Kennedy for Crew Equipment Interface Test activities, or CEIT, which provides experience handling tools, equipment and hardware for the mission.  The payload will be launched to the International Space Station aboard space shuttle Endeavour on the STS-127 mission, targeted for launch on May 15. Photo credit: NASA/Dimitrios Gerondidakis KSC-2009-1133

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NAS...

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, members of the STS-127 crew check out equipment on the Japanese Experiment Module's Experiment Logistic... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-3 at NASA's Kennedy Space Center in Florida, members of the STS-130 crew check out the placement of the Canadian-built robotic arm in space shuttle Endeavour's payload bay.    The crew is at Kennedy for a crew equipment interface test, or CEIT, which provides hands-on training and observation of shuttle and flight hardware.  The STS-130 flight will carry the Tranquility pressurized module with a built-in cupola to the International Space Station aboard Endeavour.  Launch is targeted for Feb. 4, 2010. Photo credit: NASA/Kim Shiflett KSC-2009-6144

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-3 at NASA's Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-3 at NASA's Kennedy Space Center in Florida, members of the STS-130 crew check out the placement of the Canadian-built robotic arm in space shuttle Endeavou... More

U.S. Army Reserve Spc. Kherryn Lapuz, a HMMWV commander

U.S. Army Reserve Spc. Kherryn Lapuz, a HMMWV commander

U.S. Army Reserve Spc. Kherryn Lapuz, a HMMWV commander with the 242nd Quartermaster Company, based in Conroe, Texas, verifies her crew is ready to conduct live-fire during Operation Cold Steel III at Fort Hunt... More