Эта страница переведена нe полностью. Нажмите на кнопку "перевести" чтобы загрузить перевод.

visibility Similar

code Related

The Street railway journal (1886) (14575004080)

description

Резюме

Identifier: streetrailwa318861887newy (find matches)

Title: The Street railway journal

Year: 1884 (1880s)

Authors:

Subjects: Street-railroads Electric railroads Transportation

Publisher: New York : McGraw Pub. Co.

Contributing Library: Smithsonian Libraries

Digitizing Sponsor: Smithsonian Libraries

Text Appearing Before Image:

219 per year $87,600. Wear and tear 5 per cent of $142,000 (Table C.) 7,100. $94,700. Interest 6 per cent of $200,000. (Table C.).... 12,120. $106,820, TABLE E. Cable tramway. Construction and equip-ment. Track, 10 miles @ $7,000 $70,000. Cars, 40® $900 36,000. Conduit, 10 miles ® $40,000 400,000. Steam power plant 25,000. Curves 8,000. Driving machinery and sheaves 7,500. Building and foundations 10,000. Engineering 10,000. $566,500. TABLE F. Cable tramway. Annual running expenses. Coal 10>£ tons per day @ $2.50 $9,581. Engineer $2.50 and assistant $1.50 1.460 Firemen, 2 @ $1.50 1,095. Oiling, 2,000 sheaves 4,000. Maintaining plant 4 per cent of $543,300 (Table E.) 21,732. Maintaining wire rope 13,200. . . $51,068. Interest 6 per cent of $566,500 33,990. $85,058. TABLE G. Changing from horse to electric, B.-K. sys-tem. Cost of change and equipment, Conduit 10 miles® $20,000 $200 000 Steam power plant 20 OCX) Dynamo plant g0W Motors. „ 48o00 Engineering c000 $294,000. I I III

Text Appearing After Image:

TABLE H. Boadchanged from horse to electric, B.-K. system. Annual running expenses. Coal %y, tons per day @ $2.50 $7,750 Engineer $2.50 and assistant $1.50 1,460 Firemen S @ $1.50 1 095. Wear and tear 4 per cent of $430,000 )7200. $27 511 Interest on cost of change, 6 per cent of $294,000 (Table G.) 17,640. Interest on first cost of horse tramway 6 percent of $202,000—$60,000 (price of horses)$142,800 8.520. $53,671. TABLE I. Changing from cable to electric, B.-K. sys-tem. Cost of change and equipment. Conductors, 10 miles ® $1,000 $10,000. Insulators 9,600. Dynamo plant 20,100. Motors 48,000. Engineering 2,000. $89,600. TABLE K. Coal 8M tons per day ® $2.50 $7,756. Engineer $2.50 and assistant $1.50 1,460. Firemen 2 @ $1.50 1,095. Wear and tear, 4 per cent of $618,600 24,744. $35,055. 334 THE STREET RAILWAY JOURNAL. ApBH.,r1881. Interest, 6 per cent of $89,600 5,376. interest on first cost of cable tramway 6 per cent of $566,500 33,990. $74,421. SUMMARY. Cost of construction and

label_outline

Тэги

журнал уличной железной дороги 1886 г. книжные иллюстрации транспорт промышленная история уличные железные дороги трамвайный вагон электрические трамваи электрифицированные трамваи легкая железная дорога паровой трамвай история техники электростанции трамвай трамвайный транспорт изображения из интернет-архива
date_range

Дата

1886
create

Источник

Smithsonian Libraries
link

Ссылка

http://commons.wikimedia.org/
copyright

Информация о правах

public domain

label_outline Explore The Street Railway Journal 1886

Темы

журнал уличной железной дороги 1886 г. книжные иллюстрации транспорт промышленная история уличные железные дороги трамвайный вагон электрические трамваи электрифицированные трамваи легкая железная дорога паровой трамвай история техники электростанции трамвай трамвайный транспорт изображения из интернет-архива