Эта страница переведена нe полностью. Нажмите на кнопку "перевести" чтобы загрузить перевод.

visibility Similar

Thermal Infrared Sensor (TIRS) INSTRUMENT

KENNEDY SPACE CENTER, FLA. -- Inside the payload bay of Space Shuttle orbiter Endeavour, workers and STS-88 crew members on a movable work platform or bucket move closer to the rear of the orbiter's crew compartment. While Endeavour is being prepared for flight inside Orbiter Processing Facility Bay 1, the STS-88 crew members are participating in a Crew Equipment Interface Test (CEIT) to familiarize themselves with the orbiter's midbody and crew compartments. A KSC worker (left) maneuvers the platform to give Mission Specialists Jerry L. Ross and James H. Newman (right) a closer look. Looking on is Wayne Wedlake of United Space Alliance at Johnson Space Center. Targeted for liftoff on Dec. 3, 1998, STS-88 will be the first Space Shuttle launch for assembly of the International Space Station (ISS). The primary payload is the Unity connecting module which will be mated to the Russian-built Zarya control module, expected to be already on orbit after a November launch from Russia. After the mating, Ross and Newman are scheduled to perform three spacewalks to connect power, data and utility lines and install exterior equipment. The first major U.S.-built component of ISS, Unity will serve as a connecting passageway to living and working areas of the space station. Unity has two attached pressurized mating adapters (PMAs) and one stowage rack installed inside. PMA-1 provides the permanent connection point between Unity and Zarya; PMA-2 will serve as a Space Shuttle docking port. Zarya is a self-supporting active vehicle, providing propulsive control capability and power during the early assembly stages. It also has fuel storage capability KSC-98pc1216

KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility at NASA's Kennedy Space Center, STS-115 crew members inspect equipment in Atlantis's payload bay. From left are Mission Specialists Joseph Tanner and Heidemarie Stefanyshyn-Piper. The crew is at KSC for Crew Equipment Interface Test activities, which involves equipment familiarization, a routine part of astronaut training and launch preparations. The STS-115 mission will deliver the second port truss segment, the P3/P4 truss, to the International Space Station. The crew will attach the P3 to the first port truss segment, the P1 truss, as well as deploy solar array set 2A and 4A. Launch on Space Shuttle Atlantis is scheduled for late August. Photo credit: NASA/Kim Shiflett KSC-06pd1206

Boswell Bay White Alice Site, Radio Relay Building, Chugach National Forest, Cordova, Valdez-Cordova Census Area, AK

KENNEDY SPACE CENTER, FLA. -- Workers in the Space Station Processing Facility prepare the part of the U.S. Laboratory Destiny that will bear the NASA logo. Destiny is the key U.S. element of the International Space Station. Launch of mission STS-98 on Space Shuttle Atlantis will carry Destiny to the Space Station with five system racks and experiments already installed inside the module. The launch is scheduled for January 2001 KSC-00pp1928

KENNEDY SPACE CENTER, FLA. -- Workers in the Space Station Processing Facility prepare the part of the U.S. Laboratory Destiny that will bear the NASA logo. Destiny is the key U.S. element of the International Space Station. Launch of mission STS-98 on Space Shuttle Atlantis will carry Destiny to the Space Station with five system racks and experiments already installed inside the module. The launch is scheduled for January 2001 KSC00pp1928

KENNEDY SPACE CENTER, Fla. -- From a vantage point below it, members of the STS-110 crew check out Integrated Truss Structure (ITS) S0, which is in the Operations and Checkout Building. From left are Mission Specialists Rex J. Walheim, Jerry L. Ross and Lee M. Morin. They and other crew members are taking part in a Crew Equipment Interface Test at KSC. Not shown are Commander Michael J. Bloomfield, Pilot Stephen N. Frick, and Mission Specialists Steven L. Smith and Ellen Ochoa. The ITS S0 is part of the payload on the mission. It is the center segment they will be installing on the International Space Station, part of the 300-foot (91-meter) truss attached to the U.S. Lab. By assembly completion, four more truss segments will attach to either side of the S0 truss. STS-110 is currently scheduled to launch in February 2002 KSC-01pp1567

TEST RIGS, NASA Technology Images

code Related

HIGH BAY AREA, NASA Technology Images

description

Резюме

Первоначальная помощь в поиске описала это следующим образом:

Дата захвата: 11 / 25 / 1980

Мбаппе: ДАНИЭЛЬ ЛАЙТИ

Ключевые слова: Ларсен Скан

Локтионное здание № 7

Графики, относящиеся к агентской деятельности, объектам и персоналу

Ничего не найдено.

label_outline

Тэги

высокая залив НАСА Национальное управление по аэронавтике и исследованию космического пространства высокое разрешение сверхвысокое разрешение район высокого залива Дэниел Лэйти НАСА фотографии космическая программа национальные архивы сша
date_range

Дата

1980
create

Источник

The U.S. National Archives
link

Ссылка

https://catalog.archives.gov/
copyright

Информация о правах

No known copyright restrictions

label_outline Explore High Bay Area, High, Daniel Laity

LEARJET AIRPLANE AFT SECTION BED REAR BENCH - GENERAL CABIN DETAIG - SEAT TRACK LAYOUT Right and LEFT SIDE - AFT LUGGAGE COMPARTMENT

High Farm, House, Creek Road, 1 mile West of Easton Road, Pipersville, Bucks County, PA

KULITE INSTALLATION, NASA Technology Images

Центр медицинских искусств, залив Шор, Лонг-Айленд. Фойе ранчо

Визит секретаря Шона Донована в Денвер, штат Колорадо [где он присоединился к мэру Денвера Джону Хикенлуперу, конгрессмену от Колорадо Эду Перлману, другим чиновникам и членам Mile High Youth Corps для экскурсий, посещения проекта реконструкции Парк-авеню и других инициатив]

Первоначальная помощь в поиске описала это следующим образом: Дата захвата: 2 / 13 / 1974 Озил: МАРТИН БРАУН Ключевые слова: Ларсен Скан Локтионное здание №: 51 Графики, относящиеся к агентской деятельности, объектам и персоналу

HARDWARE CONICAL FLAMEHOLDERS / PLATES COMBUSTOR

STATOR - SECONDARY BLADE CHANGE, NASA Technology Images

Первоначальная помощь в поиске описала это следующим образом: Описание: JAMES SPACE TELESCOPE (JWST) HELIUM SHROUD AT GODDARD SPACE CENTER Мбаппе: Дебби Маккаллум Дата: 5 / 14 / 2009 Номер: 2009-01790-0 Preservation Copy: .tif 2009

Первоначальная помощь в поиске описала это следующим образом: Дата захвата: 12 / 3 / 1980 Мбаппе: ДАНИЭЛЬ ЛАЙТИ Ключевые слова: Ларсен Скан Графики, относящиеся к агентской деятельности, объектам и персоналу

Для этой структуры существуют необработанные полевые заметки: FN-24 Номер обследования: HABS MA-127 Даты постройки: 1934 год

CAPE CANAVERAL, Fla. В High Bay 4 здания VX Assembly Building в Космическом центре имени Кеннеди НАСА во Флориде, сервисный модуль / сервисный адаптер верхней ступени Ares I-X (на переднем плане) готовится к перемещению на стенд. Другие сегменты размещаются и укладываются на пол вокруг него. Ares I-X является испытательным аппаратом для Ares I, который является частью программы Continental по возвращению людей на Луну и за ее пределы. Запуск Ares I-X запланирован на июль 2009 года. Фото: NASA / Kim Shiflett KSC-2009-2462

Темы

высокая залив НАСА Национальное управление по аэронавтике и исследованию космического пространства высокое разрешение сверхвысокое разрешение район высокого залива Дэниел Лэйти НАСА фотографии космическая программа национальные архивы сша