Эта страница переведена нe полностью. Нажмите на кнопку "перевести" чтобы загрузить перевод.

visibility Similar

STS-129 - LAUNCH - Public domain NASA photogrpaph

STS-134 - LAUNCH - Public domain NASA photogrpaph

STS-135 - LAUNCH - Public domain NASA photogrpaph

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis, atop the mobile launcher platform and crawler-transporter, sits on launch Pad 39A with the Atlantic Ocean in the background after having traveled 3.4 miles from the Vehicle Assembly Building. Liftoff of Atlantis on mission STS-101 is scheduled for April 17 at 7:03 p.m. EDT. STS-101 is a logistics and resupply mission for the International Space Station, to restore full redundancy to the International Space Station power system in preparation for the arrival of the next pressurized module, the Russian-built Zvezda KSC-00pp0409

KENNEDY SPACE CENTER, FLA. -- Under a nearly clear blue sky, Space Shuttle Atlantis rolls off Launch Pad 39A back to the Vehicle Assembly Building. In the VAB, the shuttle will be examined for hail damage. A severe thunderstorm with golf ball-sized hail caused divots in the giant tank's foam insulation and minor surface damage to about 26 heat shield tiles on the shuttle's left wing. Further evaluation of the tank is necessary to get an accurate accounting of foam damage and determine the type of repair required and the time needed for that work. A new target launch date has not been determined, but teams will focus on preparing Atlantis for liftoff in late April. Photo credit: NASA/Amanda Diller KSC-07pd0556

On Launch Pad 39A NASA Image of The Day

STS-127 Shuttle Endeavour is Prepared for Launch

STS-135 - LAUNCH - Public domain NASA photogrpaph

KENNEDY SPACE CENTER, FLA. -- The crawler transporter, with its cargo of Space Shuttle Discovery and mobile launcher platform, leaves tracks on the crawlerway as it makes its way up Launch Pad 39B. Behind the Shuttle can be seen part of the rotating service structure and the 82-foot lightning mast (next to the solid rocket booster) on top of the fixed service structure. The two structures are used during prelaunch preparations at the pad. Earlier in the week, the Shuttle was rolled back to the VAB from the pad to repair hail damage on the external tank's foam insulation. Mission STS-96, the 94th launch in the Space Shuttle Program, is scheduled for liftoff May 27 at 6:48 a.m. EDT. STS-96 is a logistics and resupply mission for the International Space Station, carrying such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-shared experiment KSC-99pp0566

code Related

CARD 1 OF 2. NASA public domain image. Kennedy space center.

description

Резюме

STS-130 LAUNCH L-1 RSS ROLLBACK

Public domain photograph of Space shuttle preparing to launch, free to use, no copyright restrictions image - Picryl description

label_outline

Тэги

Космический центр Кеннеди карта высокое разрешение космический корабль стартовая площадка запуск ракеты НАСА Флорида мыс Канаверал
date_range

Дата

05/02/2010
place

Месторасположение

KSC - PAD 39A
create

Источник

NASA
link

Ссылка

https://images.nasa.gov/
copyright

Информация о правах

Public Domain Dedication (CC0)

label_outline Explore Card, Rocket Launch, Spacecraft

Темы

Космический центр Кеннеди карта высокое разрешение космический корабль стартовая площадка запуск ракеты НАСА Флорида мыс Канаверал