visibility Similar

STS094-341-013 - STS-094 - MGBX BDND - Crouch performs OPS

CAPE CANAVERAL, Fla. – On Complex 37 at Cape Canaveral Air Force Station in Florida, workers ensure the GOES-O and Delta IV second stage are ready to leave the Horizontal Integration Facility for the launch pad. GOES–O is one of a series of Geostationary Operational Environmental Satellites. The multi-mission GOES series N-P will be a vital contributor to weather, solar and space operations and science. NASA and the National Oceanic and Atmospheric Administration, or NOAA, are actively engaged in a cooperative program to expand the existing GOES system with the launch of the GOES N-P satellites. Launch of the GOES-O is targeted for no earlier than April 2009. Photo credit: NASA/Jim Grossmann KSC-2009-1833

STS-133 ELC PAYLOAD MOVE FROM WORK STAND TO ROTATION STAND 2010-3820

VERTICAL LIFT FACILITY VLF, NASA Technology Images

MECHANICAL AND ELECTRICAL EQUIPMENT AT THE PROPULSION SYSTEMS LABORATORY PSL EQUIPMENT BUILDING

TURBINE RIG IN HIGH PRESSURE FACILITY HPF

Workers in the in the Space Station Processing Facility move two segments of the Canadian Space Agency's Space Station Remote Manipulator System (SSRMS) to a workstand. CSA's first contribution to the International Space Station (ISS), the SSRMS is the primary means of transferring payloads between the orbiter payload bay and the ISS for assembly. The 56-foot-long robotic arm includes two 12-foot booms joined by a hinge. Seven joints on the arm allow highly flexible and precise movement.. Latching End Effectors are mounted on each end of the arm for grappling. Video cameras mounted on the booms and end effectors will give astronauts maximum visibility for operations and maintenance tasks on the ISS. The SSRMS is at KSC to begin a campaign of prelaunch processing activities. It is scheduled to be launched aboard Space Shuttle Endeavour on mission STS-100, currently planned for July 2000 KSC-99pp0571

1200 DEGREE CASCADE, NASA Technology Images

STS081-344-013 - STS-081 - Atlantis ODS docked to the DM on the Mir space station

code Related

Das Hardware-Segment Ares I-X, Pathfinder 2 (PF2) wird von Gebäude 50 in Gebäude 333 verlegt.

description

Zusammenfassung

Das Hardware-Segment Ares I-X, Pathfinder 2 (PF2) wird von Gebäude 50 in Gebäude 333 verlegt. NASA Identifier: C-2007-1711

label_outline

Tags

NASA der ares ix hardware segment pathfinder 2 pf 2 wird von gebäude 50 nach gebäude 333 verlegt divids hohe Auflösung Glenn-Forschungszentrum Luftfahrtforschungsorganisation ultrahohe Auflösung
date_range

Datum

12/09/2009
place

Lage

create

Quelle

Defense Visual Information Distribution Service
link

Link

https://www.dvidshub.net/
copyright

Copyright-info

Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright

label_outline Explore The Ares I X Hardware Segment Pathfinder 2 Pf 2 Being Moved From Building 50 To Building 333, Aviation Research Organization, Glenn Research Center

Themen

NASA der ares ix hardware segment pathfinder 2 pf 2 wird von gebäude 50 nach gebäude 333 verlegt divids hohe Auflösung Glenn-Forschungszentrum Luftfahrtforschungsorganisation ultrahohe Auflösung