Diese Seite ist nicht vollständig übersetzt. Klicken Sie auf die Schaltfläche Übersetzen, um die neueste übersetzte Version zu laden.

visibility Similar

A right side ground view of a C-12A aircraft

U.S. Air Force CHIEF of STAFF GEN. Merrill McPeak sits in the cockpit of a C-21A aircraft during a visit to troops supporting Operation Desert Shield.

CAPE CANAVERAL, Fla. – The “pathfinder” aircraft for space shuttle Discovery’s ferry flight taxis down the runway at the Shuttle Landing Facility at NASA’s Kennedy Space Center in Florida. The NASA C-9 aircraft will fly about 100 miles ahead of Discovery to scout for the safest route between destinations. Its crew includes an SCA flight engineer who studies the weather patterns along the flight path to find a route free of rain and other turbulence. The carrier aircraft, also known as an SCA, is a Boeing 747 jet, originally manufactured for commercial use which was modified by NASA to transport the shuttles between destinations on Earth. NASA 905 is scheduled to ferry Discovery to the Washington Dulles International Airport in Virginia on April 17, and is assigned to all remaining ferry missions, delivering the shuttles to their permanent public display sites. After its arrival at Dulles, Discovery will be placed on display in the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center on April 19. For more information on the SCA, visit http://www.nasa.gov/centers/dryden/news/FactSheets/FS-013-DFRC.html. For more information on shuttle transition and retirement activities, visit http://www.nasa.gov/transition. Photo credit: NASA/Amanda Diller KSC-2012-2320

An eight-foot-long pod designed to carry a synthetic aperture radar hangs from the underbelly of NASA's Gulfstream-III research testbed. ED07-0027-54

U.S. COAST GUARD GULFSTREAM V WASHINGTON DC

A right front view of an Air Force C-22B aircraft displayed on the flight line at a Department of Defense Joint Services Open House

KENNEDY SPACE CENTER, FLA. - The plane carrying the crew of mission STS-121 taxis onto the Shuttle Landing Facility at NASA's Kennedy Space Center. The crew was at the Center for a three-day series of Terminal Countdown Demonstration Test (TCDT) activities. The TCDT includes equipment familiarization, emergency egress training and a simulated launch countdown. Mission STS-121 is scheduled to launch July 1. Photo credit: NASA/Kim Shiflett KSC-06pd1129

NASA Gulfstream III, Dryden history gallery

A U.S. Navy UC-35A Citation aircraft sits on the runway at Marine Marine Corps Air Station Cherry Point, N.C., Sept. 29, 2004, waiting to carry a U.S. Navy Admiral to his next destination. (U.S. USMC photo by Lance CPL. Alicia M. Garcia) (Released)

code Related

STS-119 - EOM - Public domain NASA photogrpaph

description

Zusammenfassung

AUSSCHUSS NUR FÜR LAND 15 (NORD-SÜD)

Item: DL020-EOM

Aufgenommen am: 28 / 03 / 2009

Bildtyp: DIGITAL STILLS

STS119 LAUNCH AND LANDING Beschreibung: ALERT STILL COVERAGE OF TOUCHDOWN. ANSICHT AUS DEM AUSSEN DES Zaunes. NORD "MIT ORBITER KOMMT ZUR KAMERA" SHOW TOUCHDOWN LOCATE BEI EIGENER GESCHÄFTIGUNG AUS DEM TOUCHDOWN-PUNKT, um EINE ADEQUATE BILD-Größe sicherzustellen, WENN der ORBITER DEN RUNWAY KONTAKTIERT.

Nichts gefunden.

label_outline

Tags

eom sts 119 Entdeckung NASA starten und landen hohe Auflösung ultrahohe Auflösung Runway Landungen Landung anzeigen Aufsetzpunkt ausreichende Bildgröße Landung Orbiterkontakte Digitale Standbilder STS 119 Orbiter angemessener Abstand Aussicht Versuchsflugzeug Weltraumprogramm
date_range

Datum

25/07/2005 - 21/07/2011
create

Quelle

The U.S. National Archives
link

Link

https://catalog.archives.gov/
copyright

Copyright-info

No known copyright restrictions

label_outline Explore Digital Stills Sts 119, Sts 119 Discovery, Show Touchdown

Themen

eom sts 119 Entdeckung NASA starten und landen hohe Auflösung ultrahohe Auflösung Runway Landungen Landung anzeigen Aufsetzpunkt ausreichende Bildgröße Landung Orbiterkontakte Digitale Standbilder STS 119 Orbiter angemessener Abstand Aussicht Versuchsflugzeug Weltraumprogramm