visibility Similar

STS101-321-018 - STS-101 - Docked view of the PMA-2 and Node 1/Unity modules

STS101-331-024 - STS-101 - View of interior hardware in the FGB/Zarya module

BOEING DELTA 4 SHROUD SEPARATION TEST IN SPACE POWER FACILITY AT NASA PLUM BROOK STATION

STS101-388-015 - STS-101 - TORU assembly hardware in FGB/Zarya module

S115E07259 - STS-115 - Yeast GAP in the FWD MDDK of the Space Shuttle Atlantis during Expedition 13 / STS-115 Joint Operations

S96E5106 - STS-096 - Radiation Area Monitor assembly in Node 1

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 (OPF-2) at NASA’s Kennedy Space Center in Florida, space shuttle Atlantis is seen after a special crane was used to remove the forward reaction control system. The system, which provided maneuvering capabilities to the spacecraft during its missions, will be transported to White Sands Space Harbor in New Mexico to undergo a complete deservicing and cleaning. Atlantis glided to a landing, July 21, 2011, at Kennedy Space Center’s Shuttle Landing Facility, completing NASA’s final space shuttle mission, STS-135. The shuttle is in OPF-2 being decommissioned and prepared for eventual display at the Kennedy Space Center Visitor Complex in Florida. Photo credit: Jim Grossmann KSC-2011-6457

184-inch cyclotron magnet for calutron research during wartime (crane view). Photo taken 2/02/1943. Declassified 4/30/1959. Principal Investigator/Project: Analog Conversion Project

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's Kennedy Space Center in Florida, the gaseous nitrogen tank in space shuttle Discovery's payload bay is attached to a "fish pole" lifting fixture and ready to be hoisted out of the bay. The tank is being removed during processing for the shuttle's STS-131 mission to the International Space Station. The tanks are used for atmosphere conditioning and for moving potable water in the crew module. The seven-member STS-131 crew will deliver a Multi-Purpose Logistics Module filled with science racks to be transferred to laboratories on the station. Three spacewalks will include work to attach a spare ammonia tank assembly to the station's exterior and return a European experiment from outside the station's Columbus module. This will be the 33rd shuttle mission to the station. Launch is targeted for March 18, 2010. Photo credit: NASA/Troy Cryder KSC-2009-6100

code Related

Umzug des Ares 1-X US-4 Segments von Gebäude 50 nach Gebäude 333

description

Zusammenfassung

Umzug des Ares 1-X US-4 Segments von Gebäude 50 nach Gebäude 333

NASA Identifier: C-2008-383

label_outline

Tags

NASA bewegung von ares 1 x us 4 segment von gebäude 50 nach gebäude 333 divids hohe Auflösung Glenn-Forschungszentrum Luftfahrtforschungsorganisation ultrahohe Auflösung
date_range

Datum

12/09/2009
place

Lage

create

Quelle

Defense Visual Information Distribution Service
link

Link

https://www.dvidshub.net/
copyright

Copyright-info

Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright

label_outline Explore Movement Of Ares 1 X Us 4 Segment From Building 50 To Building 333, Aviation Research Organization, Glenn Research Center

Themen

NASA bewegung von ares 1 x us 4 segment von gebäude 50 nach gebäude 333 divids hohe Auflösung Glenn-Forschungszentrum Luftfahrtforschungsorganisation ultrahohe Auflösung