moves, nasa

1,491 media by topicpage 1 of 15
Tests to Help Plan Opportunity Moves

Tests to Help Plan Opportunity Moves

Rover engineers check how a test rover moves in material chosen to simulate some difficult Mars driving conditions. The scene is inside the In-Situ Instrument Laboratory at NASA Jet Propulsion Laboratory, Pasad... More

CAPE CANAVERAL, Fla. – In high bay 4 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, a crane moves the Ares I-X crew module simulator toward a stand at right.  Other Ares I-X segments are stacked around the floor of the bay.  Ares I-X is the test flight for the Ares I.   The I-X flight will provide NASA an early opportunity to test and prove hardware, facilities and ground operations associated with Ares I. The launch of the 327-foot-tall, full-scale Ares I-X, targeted for July 2009, will be the first in a series of unpiloted rocket launches from Kennedy. When fully developed, the 16-foot diameter crew module will furnish living space and reentry protection for the astronauts.  Photo credit: NASA/Tim Jacobs KSC-2009-1866

CAPE CANAVERAL, Fla. – In high bay 4 of the Vehicle Assembly Building ...

CAPE CANAVERAL, Fla. – In high bay 4 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, a crane moves the Ares I-X crew module simulator toward a stand at right. Other Ares I-X segment... More

KENNEDY SPACE CENTER, FLA. - The Multi-Purpose Logistics Module Raffaello moves away from its stand in the Space Station Processing Facility.  Raffaello is the second MPLM built by the Italian Space Agency, serving as a reusable logistics carrier and primary delivery system to resupply and return station cargo requiring a pressurized environment.  It is being moved to allow the third MPLM, Donatello, to be brought in for routine testing.  Donatello has been stored in the Operations and Checkout Building.  This is the first time all three MPLMs are in the SSPF; the other one is the Leonardo.  Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.

KENNEDY SPACE CENTER, FLA. - The Multi-Purpose Logistics Module Raffae...

KENNEDY SPACE CENTER, FLA. - The Multi-Purpose Logistics Module Raffaello moves away from its stand in the Space Station Processing Facility. Raffaello is the second MPLM built by the Italian Space Agency, ser... More

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, the Multi-Purpose Logistics Module Raffaello glides above the floor as it moves to another stand on the other side.  Raffaello is the second MPLM built by the Italian Space Agency, serving as a reusable logistics carrier and primary delivery system to resupply and return station cargo requiring a pressurized environment.  It is being moved to allow the third MPLM, Donatello, to be brought in for routine testing.  Donatello has been stored in the Operations and Checkout Building.  This is the first time all three MPLMs are in the SSPF; the other one is the Leonardo.  Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility,...

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, the Multi-Purpose Logistics Module Raffaello glides above the floor as it moves to another stand on the other side. Raffaello is the secon... More

KENNEDY SPACE CENTER, FLA. - A worker on the floor watches as the Multi-Purpose Logistics Module Raffaello moves toward another work stand in the Space Station Processing Facility.  Raffaello is the second MPLM built by the Italian Space Agency, serving as a reusable logistics carrier and primary delivery system to resupply and return station cargo requiring a pressurized environment.  It has been moved across the floor to allow the third MPLM, Donatello, to be brought in for routine testing.  Donatello has been stored in the Operations and Checkout Building.  This is the first time all three MPLMs are in the SSPF; the other one is the Leonardo.  Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.

KENNEDY SPACE CENTER, FLA. - A worker on the floor watches as the Mult...

KENNEDY SPACE CENTER, FLA. - A worker on the floor watches as the Multi-Purpose Logistics Module Raffaello moves toward another work stand in the Space Station Processing Facility. Raffaello is the second MPLM... More

KENNEDY SPACE CENTER, FLA. --  The shuttle training aircraft, or STA, moves toward the runway on NASA's Shuttle Landing Facility.  In the cockpit are STS-120 Commander Pamela Melroy and Pilot George Zamka, who will begin landing practice on the runway. A modified Grumman American Aviation-built Gulf Stream II jet, the STA simulates an orbiter's cockpit, motion and visual cues and handling qualities. In flight, the STA duplicates the orbiter's atmospheric descent trajectory from approximately 35,000 feet altitude to landing on a runway.  Melroy and other crew members are at Kennedy Space Center to take part in the terminal countdown demonstration test, which also includes a simulated launch countdown. Mission STS-120 is targeted for Oct. 23.  Photo credit: NASA/Kim Shiflett KSC-07pd2693

KENNEDY SPACE CENTER, FLA. -- The shuttle training aircraft, or STA, ...

KENNEDY SPACE CENTER, FLA. -- The shuttle training aircraft, or STA, moves toward the runway on NASA's Shuttle Landing Facility. In the cockpit are STS-120 Commander Pamela Melroy and Pilot George Zamka, who ... More

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, arcane moves the cover of the shipping container away from its cargo, the Multi-Use Lightweight Equipment (MULE) carrier. The MULE is part of the payload for the fifth and final shuttle servicing mission to NASA's Hubble Space Telescope, STS-125. The MULE carrier will join the Flight Support System, the Super Lightweight Interchangeable Carrier and the Orbital Replacement Unit Carrier in the Payload Hazardous Servicing Facility where the Hubble payload is being prepared for launch. The Relative Navigation Sensors and the New Outer Blanket Layers will be on the MULE. The payload is scheduled to go to Launch Pad 39A in mid-September to be installed into Atlantis' payload bay.  Atlantis is targeted to launch Oct. 8 at 1:34 a.m. EDT. .Photo credit: NASA/Amanda Diller KSC-08pd2298

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at ...

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, arcane moves the cover of the shipping container away from its cargo, the Multi-Use Lightweight Equipment (MULE... More

KENNEDY SPACE CENTER, FLA. -- The Joint Airlock Module, suspended from an overhead crane, moves toward the payload canister below. After being placed in the canister, the module will be transferred to the Space Station Processing Facility. There the module will undergo more preflight processing for the STS-104 mission scheduled for launch aboard Space Shuttle Atlantis May 17, 2001. The Joint Airlock Module is the gateway from which crew members aboard the International Space Station will enter and exit the 470-ton orbiting research facility KSC00pp1504

KENNEDY SPACE CENTER, FLA. -- The Joint Airlock Module, suspended from...

KENNEDY SPACE CENTER, FLA. -- The Joint Airlock Module, suspended from an overhead crane, moves toward the payload canister below. After being placed in the canister, the module will be transferred to the Space... More

CAPE CANAVERAL, Fla. -- A Hyster forklift moves NASA's Juno spacecraft into Astrotech's payload processing facility in Titusville, Fla. to begin final testing and preparations for launch.        The solar-powered spacecraft will orbit Jupiter's poles 33 times to find out more about the gas giant's origins, structure, atmosphere and magnetosphere and investigate the existence of a solid planetary core. Juno is scheduled to launch aboard an Atlas V rocket from Cape Canaveral, Fla. Aug. 5. For more information visit, www.nasa.gov/juno. Photo credit: NASA/Jack Pfaller    It will splash down into the Atlantic Ocean where the ship and its crew will recover it and tow it back through Port Canaveral for refurbishing for another launch. The STS-124 mission is the second of three flights launching components to complete the Japan Aerospace Exploration Agency's Kibo laboratory. The shuttle crew will install Kibo's large Japanese Pressurized Module and its remote manipulator system, or RMS. Photo credit: USA/Jeff Suter KSC-2011-2818

CAPE CANAVERAL, Fla. -- A Hyster forklift moves NASA's Juno spacecraft...

CAPE CANAVERAL, Fla. -- A Hyster forklift moves NASA's Juno spacecraft into Astrotech's payload processing facility in Titusville, Fla. to begin final testing and preparations for launch. The solar-power... More

KENNEDY SPACE CENTER, FLA. --  Installed on a transporter, the payload canister moves out of the Vertical Processing Facility.  Inside the canister are the SPACEHAB module and the port 5 truss segment for mission STS-116.  They will be moved into the payload changeout room at the pad and transferred into Space Shuttle Discovery's payload bay once the vehicle has rolled out to the pad. The payload canister is 65 feet long, 18 feet wide and 18 feet, 7 inches high. It has the capability to carry vertically or horizontally processed payloads up to 15 feet in diameter and 60 feet long, matching the capacity of the orbiter payload bay. It can carry payloads weighing up to 65,000 pounds. Clamshell-shaped doors at the top of the canister operate like the orbiter payload bay doors, with the same allowable clearances. Photo credit: NASA/George Shelton KSC-06pd2451

KENNEDY SPACE CENTER, FLA. -- Installed on a transporter, the payload...

KENNEDY SPACE CENTER, FLA. -- Installed on a transporter, the payload canister moves out of the Vertical Processing Facility. Inside the canister are the SPACEHAB module and the port 5 truss segment for missi... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a United Space Alliance technician monitors the progress as an overhead crane moves one of Endeavour’s main propulsion system tanks away from the mid-body of the orbiter. The tanks will be retained for possible future use on the agency’s Space Launch System Program.      The work is part of Endeavour’s transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122, 883, 151 miles over the course of its 19-year career. For more information, visit http://www.nasa.gov/shuttle. Photo credit: Dimitri Gerondidakis KSC-2012-1883

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a United Space Alliance technician monitors the progress as an overhead crane moves one of Endeavour’s main pr... More

CAPE CANAVERAL, Fla. - The giant external fuel tank and twin solid rocket boosters attached to space shuttle Endeavour bask in the sunlight as the rotating service structure (RSS) moves away on Launch Pad 39A at NASA's Kennedy Space Center in Florida. The structure provides weather protection and access to the shuttle while it awaits lift off on the pad. RSS "rollback," as it's called, began at 11:44 a.m. EDT on May 15 and was completed at 12:24 p.m.           STS-134 will deliver the Alpha Magnetic Spectrometer-2 (AMS), Express Logistics Carrier-3, a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. May 16 at 8:56 a.m. will be the second launch attempt for Endeavour. The first attempt on April 29 was scrubbed because of an issue associated with a faulty power distribution box called the aft load control assembly-2 (ALCA-2). STS-134 will be the final spaceflight for Endeavour. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Jack Pfaller KSC-2011-3551

CAPE CANAVERAL, Fla. - The giant external fuel tank and twin solid roc...

CAPE CANAVERAL, Fla. - The giant external fuel tank and twin solid rocket boosters attached to space shuttle Endeavour bask in the sunlight as the rotating service structure (RSS) moves away on Launch Pad 39A a... More

CAPE CANAVERAL, Fla. -- In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, an overhead crane moves the Raffaello multi-purpose logistics module, or MPLM, toward a payload canister.    Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandra Magnus and Rex Walheim are targeted to lift off on space shuttle Atlantis July 8, taking with them the MPLM packed with supplies, logistics and spare parts to the International Space Station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing spacecraft and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Jim Grossmann KSC-2011-4412

CAPE CANAVERAL, Fla. -- In the Space Station Processing Facility at NA...

CAPE CANAVERAL, Fla. -- In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, an overhead crane moves the Raffaello multi-purpose logistics module, or MPLM, toward a payload canist... More

KENNEDY SPACE CENTER, FLA. --  Inside the Space Station Processing Facility, an overhead crane moves towards the SPACEHAB Module to transport in to the Payload Canister. The SPACEHAB Module will carry racks of experiments, flight hardware, spacewalk equipment and supplies to support mission STS-116 to the International Space Station. STS-116 will be mission number 20 to the station and construction flight 12A.1. Along with SPACEHAB, the mission payload on Space Shuttle Discovery includes the P5 integrated truss structure and other key components. The launch window opens Dec. 7.  Photo credit: NASA/Troy Cryder KSC-06pd2444

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Fac...

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility, an overhead crane moves towards the SPACEHAB Module to transport in to the Payload Canister. The SPACEHAB Module will carry racks of ... More

KENNEDY SPACE CENTER, FLA. - As the orbiter Discovery, sitting on an orbiter transporter, moves away from NASA's Orbiter Processing Facility toward the Vehicle Assembly Building (VAB), workers accompany the vehicle.  The rollover to the VAB marks the start of the journey to the launch pad and, ultimately, launch.  Once inside the VAB, Discovery will be raised to vertical and lifted up and over into high bay 3 for stacking with its redesigned external tank and twin solid rocket boosters.  The rollout of Space Shuttle Discovery to Launch Pad 39B is expected in approximately a week.  Launch of Discovery on mission STS-121 is scheduled to take place in a window extending July 1 to July 19. Photo credit: NASA/Jim Grossmann KSC-06pd0818

KENNEDY SPACE CENTER, FLA. - As the orbiter Discovery, sitting on an o...

KENNEDY SPACE CENTER, FLA. - As the orbiter Discovery, sitting on an orbiter transporter, moves away from NASA's Orbiter Processing Facility toward the Vehicle Assembly Building (VAB), workers accompany the veh... More

KENNEDY SPACE CENTER, FLA. -- Sitting atop the Mobile Launcher Platform, Space Shuttle Atlantis inches its way to the launch pad.  The Shuttle and MLP rest on top of the crawler-transporter beneath it, which moves about 1 mile per hour. Atlantis is scheduled for launch April 4 on mission STS-110, which will install the S0 truss, the framework that eventually will hold the power and cooling systems needed for future international research laboratories on the International Space Station.  The  Canadarm2 robotic arm will be used exclusively to hoist the 13-ton truss from the payload bay to the Station.  The S0 truss will be the first major U.S. component launched to the Station since the addition of the Quest airlock in July 2001.  The four spacewalks planned for the construction will all originate from the airlock.  The mission will be Atlantis' 25th trip to space KSC-02pd0275

KENNEDY SPACE CENTER, FLA. -- Sitting atop the Mobile Launcher Platfor...

KENNEDY SPACE CENTER, FLA. -- Sitting atop the Mobile Launcher Platform, Space Shuttle Atlantis inches its way to the launch pad. The Shuttle and MLP rest on top of the crawler-transporter beneath it, which mo... More

KENNEDY SPACE CENTER, FLA. --  In the Space Station Processing Facility, an overhead crane moves the JEM Experiment Logistics Module Pressurized Section toward a scale (at left) for weight and center-of-gravity measurements.  The module will then be moved to a work stand.  The logistics module is one of the components of the Japanese Experiment Module or JEM, also known as Kibo, which means "hope" in Japanese. Kibo comprises six components: two research facilities -- the Pressurized Module and Exposed Facility; a Logistics Module attached to each of them; a Remote Manipulator System; and an Inter-Orbit Communication System unit. Kibo also has a scientific airlock through which experiments are transferred and exposed to the external environment of space. Kibo is Japan's first human space facility and its primary contribution to the station. Kibo will enhance the unique research capabilities of the orbiting complex by providing an additional environment in which astronauts can conduct science experiments. The various components of JEM will be assembled in space over the course of three Space Shuttle missions. The first of those three missions, STS-123, will carry the Experiment Logistics Module Pressurized Section aboard the Space Shuttle Endeavour, targeted for launch in 2007.  Photo credit: NASA/George Shelton KSC-07pd0773

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facilit...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, an overhead crane moves the JEM Experiment Logistics Module Pressurized Section toward a scale (at left) for weight and center-of-gravity... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, technicians monitor the progress as a large crane lifts and moves the forward reaction control system (FRCS) for installation on space shuttle Endeavour.     The work is part of the Space Shuttle Program transition and retirement processing of Endeavour. The FRCS helped maneuver a shuttle while it was in orbit. The FRCS was removed from Endeavour and sent to White Sands Test Facility in N.M. to be cleaned of its toxic propellants. Endeavour is being prepared for display at the California Science Center in Los Angeles.  Photo credit: NASA/Dimitri Gerondidakis KSC-2012-1274

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, technicians monitor the progress as a large crane lifts and moves the forward reaction control system (FRCS) fo... More

CAPE CANAVERAL, Fla. -- Viewed from the Launch Pad 39A flame trench, crawler-transporter No. 2 moves under a space shuttle era mobile launcher platform at NASA's Kennedy Space Center in Florida. The activity was part of testing to check out recently completed modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the pad.      NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each weighing six and a half million pounds and larger in size than a professional baseball infield, the crawler-transporters are powered by locomotive and large electrical power generator engines. The crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/ Jim Grossmann KSC-2012-6273

CAPE CANAVERAL, Fla. -- Viewed from the Launch Pad 39A flame trench, c...

CAPE CANAVERAL, Fla. -- Viewed from the Launch Pad 39A flame trench, crawler-transporter No. 2 moves under a space shuttle era mobile launcher platform at NASA's Kennedy Space Center in Florida. The activity wa... More

In the Space Station Processing Facility, workers help guide the Multi-Purpose Logistics Module Donatello as it moves the length of the SSPF toward a workstand. In the SSPF, Donatello will undergo processing by the payload test team, including integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle’s payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo. Donatello will be launched on mission STS-130, currently planned for September 2004 KSC-01pp0247

In the Space Station Processing Facility, workers help guide the Multi...

In the Space Station Processing Facility, workers help guide the Multi-Purpose Logistics Module Donatello as it moves the length of the SSPF toward a workstand. In the SSPF, Donatello will undergo processing by... More

CAPE CANAVERAL, Fla. – The Vehicle Assembly Building at NASA's Kennedy Space Center in Florida awaits the arrival of the space shuttle Atlantis as it moves from Orbiter Processing Facility-2. Atlantis will be moved to the Kennedy Space Center Visitor Complex in November where it will be placed on public display. Photo credit: NASA/Jim Grossmann KSC-2012-5870

CAPE CANAVERAL, Fla. – The Vehicle Assembly Building at NASA's Kennedy...

CAPE CANAVERAL, Fla. – The Vehicle Assembly Building at NASA's Kennedy Space Center in Florida awaits the arrival of the space shuttle Atlantis as it moves from Orbiter Processing Facility-2. Atlantis will be m... More

KENNEDY SPACE CENTER, FLA. -- Workers monitor the progress of Space Shuttle Atlantis as it moves through the doors of the Vehicle Assembly Building along the crawlerway toward Launch Pad 39A. First motion out of the VAB was at 4:43 a.m. EST.  Rollout is a milestone for Atlantis' launch to the International Space Station on mission STS-122, targeted for Dec. 6. On this mission, Atlantis will deliver the Columbus module to the International Space Station. The European Space Agency's largest contribution to the station, Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony. The module is approximately 23 feet long and 15 feet wide, allowing it to hold 10 large racks of experiments. The laboratory will expand the research facilities aboard the station, providing crew members and scientists from around the world the ability to conduct a variety of experiments in the physical, materials and life sciences.   Photo credit: NASA/Kim Shiflett KSC-07pd3259

KENNEDY SPACE CENTER, FLA. -- Workers monitor the progress of Space Sh...

KENNEDY SPACE CENTER, FLA. -- Workers monitor the progress of Space Shuttle Atlantis as it moves through the doors of the Vehicle Assembly Building along the crawlerway toward Launch Pad 39A. First motion out o... More

CAPE CANAVERAL, Fla. – Space shuttle Atlantis moves into the Vehicle Assembly Building from Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida. Atlantis will be moved to the Kennedy Space Center Visitor Complex in November where it will be placed on public display. Photo credit: NASA/Jim Grossmann KSC-2012-5876

CAPE CANAVERAL, Fla. – Space shuttle Atlantis moves into the Vehicle A...

CAPE CANAVERAL, Fla. – Space shuttle Atlantis moves into the Vehicle Assembly Building from Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida. Atlantis will be moved to the Kennedy Space C... More

CAPE CANAVERAL, Fla. – At the Shuttle Landing Facility at NASA’s Kennedy Space Center in Florida, the Shuttle Carrier Aircraft moves into position under space shuttle Discovery suspended 60 feet off the ground in the mate-demate device.      The device, known as the MDD, is a large gantry-like steel structure used to hoist a shuttle off the ground and position it onto the back of the aircraft, or SCA. The SCA is a Boeing 747 jet, originally manufactured for commercial use, which was modified by NASA to transport the shuttles between destinations on Earth. This SCA, designated NASA 905, is assigned to the remaining ferry missions, delivering the shuttles to their permanent public display sites.  NASA 905 is scheduled to ferry Discovery to the Washington Dulles International Airport in Virginia on April 17, after which the shuttle will be placed on display in the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center. For more information on the SCA, visit http://www.nasa.gov/centers/dryden/news/FactSheets/FS-013-DFRC.html. For more information on shuttle transition and retirement activities, visit http://www.nasa.gov/transition. Photo credit: NASA/Dimitri Gerondidakis KSC-2012-2232

CAPE CANAVERAL, Fla. – At the Shuttle Landing Facility at NASA’s Kenne...

CAPE CANAVERAL, Fla. – At the Shuttle Landing Facility at NASA’s Kennedy Space Center in Florida, the Shuttle Carrier Aircraft moves into position under space shuttle Discovery suspended 60 feet off the ground ... More

CAPE CANAVERAL, Fla. -- A United Space Alliance technician monitors the Space Shuttle Program's last external fuel tank, ET-122, as it moves from the Turn Basin to the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The tank traveled 900 miles by sea from NASA's Michoud Assembly Facility in New Orleans aboard the Pegasus Barge. Once inside the Vehicle Assembly Building, it eventually will be attached to space shuttle Endeavour for the STS-134 mission to the International Space Station. STS-134, targeted to launch in Feb. 2011, currently is scheduled to be the last mission in the shuttle program.          The tank, which is the largest element of the space shuttle stack, was damaged during Hurricane Katrina in August 2005 and restored to flight configuration by Lockheed Martin Space Systems Company employees. Photo credit: NASA/Jack Pfaller KSC-2010-4893

CAPE CANAVERAL, Fla. -- A United Space Alliance technician monitors th...

CAPE CANAVERAL, Fla. -- A United Space Alliance technician monitors the Space Shuttle Program's last external fuel tank, ET-122, as it moves from the Turn Basin to the Vehicle Assembly Building at NASA's Kenned... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, a crawler-transporter moves toward NASA's new mobile launcher (ML) support structure. The crawler will transport the ML from a construction site, north of the Vehicle Assembly Building, to the Mobile Launcher east park site. Once there, the ML can be outfitted with ground support equipment, such as umbilicals and access arms, for future rocket launches.          It took about two years to construct the 355-foot-tall structure, which will support NASA's future human spaceflight program. The base of the launcher is lighter than space shuttle mobile launcher platforms so the crawler-transporter can pick up the heavier load of the tower and a taller rocket. Photo credit: NASA/Jack Pfaller KSC-2010-4877

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, a c...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, a crawler-transporter moves toward NASA's new mobile launcher (ML) support structure. The crawler will transport the ML from a construction sit... More

CAPE CANAVERAL, Fla. – NASA's Pegasus barge moves through the bridge at Port Canaveral, Fla.  The barge contains the external fuel tank designated ET-133 that will be used for space shuttle Atlantis' STS-129 mission.  The barge is delivering the external tank to the Turn Basin dock at NASA's Kennedy Space Center in Florida where it will be offloaded and moved into the Vehicle Assembly Building.  The tank was shipped aboard the Pegasus from NASA's Michould Assembly Facility near New Orleans. Pegasus was towed to Port Canaveral by the Freedom Star Retrieval Ship.  Photo credit: NASA/Troy Cryder KSC-2009-4388

CAPE CANAVERAL, Fla. – NASA's Pegasus barge moves through the bridge a...

CAPE CANAVERAL, Fla. – NASA's Pegasus barge moves through the bridge at Port Canaveral, Fla. The barge contains the external fuel tank designated ET-133 that will be used for space shuttle Atlantis' STS-129 mi... More

CAPE CANAVERAL, Fla. – Space shuttle Atlantis moves from Orbiter Processing Facility-2 to the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. Atlantis will be moved to the Kennedy Space Center Visitor Complex in November where it will be put on public display. Photo credit: NASA/Jim Grossmann KSC-2012-5844

CAPE CANAVERAL, Fla. – Space shuttle Atlantis moves from Orbiter Proce...

CAPE CANAVERAL, Fla. – Space shuttle Atlantis moves from Orbiter Processing Facility-2 to the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. Atlantis will be moved to the Kennedy Space Cen... More

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, an overhead crane carrying the P3 Integrated Truss Structure moves into place over a workstand where it will deposit the truss. The port-side P3 truss is scheduled to be added to the International Space Station on mission STS-115 in 2002 aboard Space Shuttle Atlantis. The P3 will be attached to the first port truss segment, P1, being installed in an earlier mission KSC01pp0690

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, an overhead crane carrying the P3 Integrated Truss Structure moves into place over a workstand where it will deposit the truss. The port-s... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 moves a space shuttle era mobile launcher platform at Launch Pad 39A. The activity was part of testing to check out recently completed modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the pad.      NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each weighing six and a half million pounds and larger in size than a professional baseball infield, the crawler-transporters are powered by locomotive and large electrical power generator engines. The crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann KSC-2012-6289

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, cra...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 moves a space shuttle era mobile launcher platform at Launch Pad 39A. The activity was part of testing to check out r... More

CAPE CANAVERAL, Fla. – Space shuttle Atlantis moves into the Vehicle Assembly Building from Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida. Atlantis will be moved to the Kennedy Space Center Visitor Complex in November where it will be placed on public display. Photo credit: NASA/Jim Grossmann KSC-2012-5875

CAPE CANAVERAL, Fla. – Space shuttle Atlantis moves into the Vehicle A...

CAPE CANAVERAL, Fla. – Space shuttle Atlantis moves into the Vehicle Assembly Building from Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida. Atlantis will be moved to the Kennedy Space C... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, a crawler-transporter moves NASA's new mobile launcher (ML) support structure from a construction site, north of the Vehicle Assembly Building, to the Mobile Launcher east park site.          The base of the launcher is lighter than space shuttle mobile launcher platforms so the crawler-transporter can pick up the heavier load of the tower and a taller rocket. Once there, the ML can be outfitted with ground support equipment, such as umbilicals and access arms, for future rocket launches. It took about two years to construct the 355-foot-tall structure, which will support NASA's future human spaceflight program. Photo credit: NASA/Sandra Joseph KSC-2010-4958

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, a c...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, a crawler-transporter moves NASA's new mobile launcher (ML) support structure from a construction site, north of the Vehicle Assembly Building,... More

CAPE CANAVERAL, Fla. – Space shuttle Atlantis moves into the Vehicle Assembly Building from Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida. Atlantis will be moved to the Kennedy Space Center Visitor Complex in November where it will be placed t on public display. Photo credit: NASA/Jim Grossmann KSC-2012-5872

CAPE CANAVERAL, Fla. – Space shuttle Atlantis moves into the Vehicle A...

CAPE CANAVERAL, Fla. – Space shuttle Atlantis moves into the Vehicle Assembly Building from Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida. Atlantis will be moved to the Kennedy Space C... More

CAPE CANAVERAL, Fla. - In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the accordion-like arm of a rack insertion device moves a science rack into position for installation inside Multi-Purpose Logistics Module Leonardo during processing for space shuttle Discovery's STS-131 mission to the International Space Station.    The science racks Leonardo delivers will be transferred to laboratories on the station. Three spacewalks during STS-131 will include work to attach a spare ammonia tank assembly to the station's exterior and return a European experiment from outside the station's Columbus module. STS-131 will be the 33rd shuttle mission to the station. Launch is targeted for March 18, 2010.  Photo credit: NASA/Amanda Diller KSC-2009-6568

CAPE CANAVERAL, Fla. - In the Space Station Processing Facility at NAS...

CAPE CANAVERAL, Fla. - In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the accordion-like arm of a rack insertion device moves a science rack into position for installation i... More

CAPE CANAVERAL, Fla. -  In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, an overhead crane lifts the Orbital Replacement Unit Carrier, or ORUC, and moves it across the floor to install it in the payload canister.  The carrier is one of four associated with the STS-125 mission to service the Hubble Space Telescope. It will be installed in the payload canister for transfer to Launch Pad 39A. At the pad, all the carriers will be loaded into space shuttle Atlantis’ payload bay. Launch of Atlantis is targeted for Oct. 10.  Photo credit: NASA/Jack Pfaller KSC-08pd2713

CAPE CANAVERAL, Fla. - In the Payload Hazardous Servicing Facility at...

CAPE CANAVERAL, Fla. - In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, an overhead crane lifts the Orbital Replacement Unit Carrier, or ORUC, and moves it across the floor to instal... More

The space shuttle Atlantis moves to Launch Pad 39A during rollout at the Kennedy Space Center on Tuesday, May 31, 2011, in Florida. ( NASA Photo / Houston Chronicle, Smiley N. Pool ). STS_135_RollOut

The space shuttle Atlantis moves to Launch Pad 39A during rollout at t...

The space shuttle Atlantis moves to Launch Pad 39A during rollout at the Kennedy Space Center on Tuesday, May 31, 2011, in Florida. ( NASA Photo / Houston Chronicle, Smiley N. Pool ).

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, workers monitor the progress of a crawler-transporter as it moves NASA's new mobile launcher (ML) support structure from a construction site, north of the Vehicle Assembly Building, to the Mobile Launcher east park site.         The base of the launcher is lighter than space shuttle mobile launcher platforms so the crawler-transporter can pick up the heavier load of the tower and a taller rocket. Once there, the ML can be outfitted with ground support equipment, such as umbilicals and access arms, for future rocket launches. It took about two years to construct the 355-foot-tall structure, which will support NASA's future human spaceflight program. Photo credit: NASA/Tony Gray KSC-2010-4969

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, wor...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, workers monitor the progress of a crawler-transporter as it moves NASA's new mobile launcher (ML) support structure from a construction site, n... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, a Hyster forklift moves the second of three space shuttle main engines closer to shuttle Atlantis for installation. Each engine is 14 feet long, weighs about 6,700 pounds, and is 7.5 feet in diameter at the end of the nozzle. This is the final planned engine installation for the Space Shuttle Program.      Atlantis is being prepared for the "launch on need," or potential rescue mission, for the final planned shuttle flight, Endeavour's STS-134 mission. For more information, visit www.nasa.gov/shuttle. Photo credit: NASA/Kim Shiflett KSC-2010-5813

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, a Hyster forklift moves the second of three space shuttle main engines closer to shuttle Atlantis for installa... More

KENNEDY SPACE CENTER, FLA.  -  A closeup of crawler-transportation (CT) number 2 shows the new muffler system on the vehicle.  The CT also recently underwent modifications to the cab.   The CT is transporting a Mobile Launch Platform (MLP).  The CT moves Space Shuttle vehicles, situated on the MLP, between the VAB and launch pad.  Moving on four double-tracked crawlers, the CT uses a laser guidance system and a leveling system for the journey that keeps the top of a Space Shuttle vertical within plus- or minus-10 minutes of arc.  The system enables the CT-MLP-Shuttle to negotiate the ramp leading to the launch pads and keep the load level.  Unloaded, the CT weighs 6 million pounds.  Seen on top of the MLP are two tail service masts that support the fluid, gas and electrical requirements of the orbiter’s liquid oxygen and liquid hydrogen aft umbilicals.

KENNEDY SPACE CENTER, FLA. - A closeup of crawler-transportation (CT...

KENNEDY SPACE CENTER, FLA. - A closeup of crawler-transportation (CT) number 2 shows the new muffler system on the vehicle. The CT also recently underwent modifications to the cab. The CT is transporting a... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a Hyster forklift moves replica shuttle main engine 2, or RSME 2, closer for installation on space shuttle Endeavour. The orbiter is surrounded by work platforms allowing access to all areas of the spacecraft.    The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/David Lee KSC-2012-3823

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a Hyster forklift moves replica shuttle main engi... More

KENNEDY SPACE CENTER, FLA. --   In the Space Station Processing Facility, an overhead crane moves the external stowage platform 3 to the payload canister at right.  The platform is part of the payload on mission STS-118 and will be loaded into Space Shuttle Endeavour's payload bay at the pad.  Endeavour is targeted for launch on Aug. 9 to the International Space Station. The mission will continue space station construction by delivering a third starboard truss segment, S5, as well as carrying the external stowage platform 3.  Photo credit: NASA/Jim Grossmann KSC-07pd1579

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facili...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, an overhead crane moves the external stowage platform 3 to the payload canister at right. The platform is part of the payload on missio... More

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis moves back inside the Vehicle Assembly Building after an aborted rollout to Launch Pad 39A. Atlantis will fly on mission STS-98, the seventh construction flight to the International Space Station. The orbiter will carry in its payload bay the U.S. Laboratory, named Destiny, that will have five system racks already installed inside the module. After delivery of electronics in the lab, electrically powered attitude control for Control Moment Gyroscopes will be activated. Atlantis is scheduled for launch no earlier than Jan. 19, 2001, with a crew of five KSC01pp0009

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis moves back inside...

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis moves back inside the Vehicle Assembly Building after an aborted rollout to Launch Pad 39A. Atlantis will fly on mission STS-98, the seventh construction fli... More

In the Space Station Processing Facility, workers help guide the Multi-Purpose Logistics Module Leonardo as it moves toward the weight and balance scale. The Italian-built MPLM is one of three such pressurized modules that will serve as the International Space Station's "moving vans," carrying laboratory racks filled with equipment, experiments and supplies to and from the station aboard the Space Shuttle. The cylindrical module is approximately 21 feet long and 15 feet in diameter, weighing almost 4.1 metric tons. It can carry up to 9.1 metric tons of cargo packed into 16 standard space station equipment racks. The Leonardo will be launched on mission STS-102 March 8. On that flight, Leonardo will be filled with equipment and supplies to outfit the U.S. laboratory module, to be carried to the ISS on the Feb. 7 launch of STS-98 KSC-01pp0253

In the Space Station Processing Facility, workers help guide the Multi...

In the Space Station Processing Facility, workers help guide the Multi-Purpose Logistics Module Leonardo as it moves toward the weight and balance scale. The Italian-built MPLM is one of three such pressurized ... More

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Space Station Processing Facility, an overhead crane moves the Express Logistics Carrier, or ELC, to a rotation stand.  The carrier is part of the STS-129 payload on space shuttle Atlantis, which will deliver to the International Space Station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm. STS-129 is targeted to launch Nov. 12.  Photo credit: NASA/Kim Shiflett KSC-2009-4686

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Space Station Pr...

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Space Station Processing Facility, an overhead crane moves the Express Logistics Carrier, or ELC, to a rotation stand. The carrier is part of the STS-129 p... More

U.S.S. Hornet moves toward the Apollo 12 Command Module to retrieve it

U.S.S. Hornet moves toward the Apollo 12 Command Module to retrieve it

U.S.S. Hornet, prime recovery vessel for the Apollo 12 lunar landing mission, moves toward the Apollo 12 Command Module to retrieve the spacecraft. A helicopter from the recovery ship, which took part in the re... More

KENNEDY SPACE CENTER, FLA. --  In the Payload Hazardous Servicing Facility, an overhead crane moves the heat shield toward a platform at left.  The heat shield was removed from the Phoenix Mars Lander spacecraft at right. The Phoenix mission is the first project in NASA's first openly competed program of Mars Scout missions. Phoenix will land in icy soils near the north polar permanent ice cap of Mars and explore the history of the water in these soils and any associated rocks, while monitoring polar climate. Landing is planned in May 2008 on arctic ground where a mission currently in orbit, Mars Odyssey, has detected high concentrations of ice just beneath the top layer of soil. It will serve as NASA's first exploration of a potential modern habitat on Mars and open the door to a renewed search for carbon-bearing compounds, last attempted with NASA’s Viking missions in the 1970s. A stereo color camera and a weather station will study the surrounding environment while the other instruments check excavated soil samples for water, organic chemicals and conditions that could indicate whether the site was ever hospitable to life. Microscopes can reveal features as small as one one-thousandth the width of a human hair. Launch of Phoenix aboard a Delta II rocket is targeted for Aug. 3 from Cape Canaveral Air Force Station in Florida.   Photo credit: NASA/George Shelton KSC-07pd1087

KENNEDY SPACE CENTER, FLA. -- In the Payload Hazardous Servicing Faci...

KENNEDY SPACE CENTER, FLA. -- In the Payload Hazardous Servicing Facility, an overhead crane moves the heat shield toward a platform at left. The heat shield was removed from the Phoenix Mars Lander spacecraf... More

CAPE CANAVERAL, Fla. – NASA's Pegasus barge moves through the bridge at Port Canaveral, Fla.  The barge contains the external fuel tank designated ET-133 that will be used for space shuttle Atlantis' STS-129 mission.  The barge is delivering the external tank to the Turn Basin dock at NASA's Kennedy Space Center in Florida where it will be offloaded and moved into the Vehicle Assembly Building.  The tank was shipped aboard the Pegasus from NASA's Michould Assembly Facility near New Orleans. Pegasus was towed to Port Canaveral by the Freedom Star Retrieval Ship.  Photo credit: NASA/Troy Cryder KSC-2009-4387

CAPE CANAVERAL, Fla. – NASA's Pegasus barge moves through the bridge a...

CAPE CANAVERAL, Fla. – NASA's Pegasus barge moves through the bridge at Port Canaveral, Fla. The barge contains the external fuel tank designated ET-133 that will be used for space shuttle Atlantis' STS-129 mi... More

KENNEDY SPACE CENTER, FLA. -- Workers in the Space Station Processing Facility watch as a laboratory rack moves into the Multi-Purpose Logistics Module Leonardo. The MPLM is the first of three such pressurized modules that will serve as the International Space Station’s “moving vans,” carrying laboratory racks filled with equipment, experiments and supplies to and from the Space Station aboard the Space Shuttle. Leonardo will be launched March 1, 2001, on Shuttle mission STS-102 On that flight, Leonardo will be filled with equipment and supplies to outfit the U.S. laboratory module, being carried to the ISS on the Jan. 19, 2001, launch of STS-98 KSC00pp1968

KENNEDY SPACE CENTER, FLA. -- Workers in the Space Station Processing ...

KENNEDY SPACE CENTER, FLA. -- Workers in the Space Station Processing Facility watch as a laboratory rack moves into the Multi-Purpose Logistics Module Leonardo. The MPLM is the first of three such pressurized ... More

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, a transporter carrying the canister containing the payload for space shuttle Atlantis' STS-129 mission to the International Space Station - Express Logistics Carriers 1 and 2 - moves past the Vehicle Assembly Building on its way to Launch Pad 39A. Once at the pad, the payload will be transferred into the Payload Changeout Room for installation in Atlantis' payload bay.    The STS-129 crew will deliver two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Launch is set for Nov. 16. For information on the STS-129 mission objectives and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Amanda Diller KSC-2009-6011

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, a tr...

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, a transporter carrying the canister containing the payload for space shuttle Atlantis' STS-129 mission to the International Space Station - Expr... More

CAPE CANAVERAL, Fla. – A barge moves the high-fidelity space shuttle model through the lock at Port Canaveral. The model is on its way from NASA’s Kennedy Space Center in Florida to Space Center Houston, NASA Johnson Space Center’s official visitor center.    The model was built in Apopka, Fla., by Guard-Lee and installed at the Kennedy Space Center Visitor Complex in 1993.  The model is expected to arrive June 1 in Houston and to be transported June 3 to Space Center Houston, its final destination, where it will become part of a unique display telling the story of the space shuttle’s achievements and the nationwide team that made them possible. For more information about Space Center Houston, visit http://www.spacecenter.org.  Photo credit: NASA/Dimitri Gerondidakis KSC-2012-2991

CAPE CANAVERAL, Fla. – A barge moves the high-fidelity space shuttle m...

CAPE CANAVERAL, Fla. – A barge moves the high-fidelity space shuttle model through the lock at Port Canaveral. The model is on its way from NASA’s Kennedy Space Center in Florida to Space Center Houston, NASA J... More

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour and the Mobile Launcher Platform (MLP) start backing through the gate to Launch Pad 39B after a cracked cleat was discovered on the crawler-transporter. Workers near the pad (behind the crawler track) look at the cleats. The vehicle, which moves the MLP and Shuttle at about 1 mph, has a leveling system designed to keep the top of the Space Shuttle vertical while negotiating the 5 percent grade leading to the top of the pad. When the Shuttle-MLP are back on level ground, the crawler tracks will be inspected and the broken cleat repaired. Endeavour is scheduled to be launched Nov. 30 at 10:01 p.m. EST on mission STS-97, the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections KSC00padig059

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour and the Mobile L...

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour and the Mobile Launcher Platform (MLP) start backing through the gate to Launch Pad 39B after a cracked cleat was discovered on the crawler-transporter. Wor... More

CAPE CANAVERAL, Fla. -  In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, an overhead crane moves the Orbital Replacement Unit Carrier, or ORUC, above the payload canister for installation.  The carrier is one of four associated with the STS-125 mission to service the Hubble Space Telescope. It will be installed in the payload canister for transfer to Launch Pad 39A. At the pad, all the carriers will be loaded into space shuttle Atlantis’ payload bay. Launch of Atlantis is targeted for Oct. 10.  Photo credit: NASA/Jack Pfaller KSC-08pd2714

CAPE CANAVERAL, Fla. - In the Payload Hazardous Servicing Facility at...

CAPE CANAVERAL, Fla. - In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, an overhead crane moves the Orbital Replacement Unit Carrier, or ORUC, above the payload canister for installa... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, workers monitor the progress of a crawler-transporter as it moves NASA's new mobile launcher (ML) support structure from a construction site, north of the Vehicle Assembly Building to the Mobile Launcher east park site.           The base of the launcher is lighter than space shuttle mobile launcher platforms so the crawler-transporter can pick up the heavier load of the tower and a taller rocket. Once there, the ML can be outfitted with ground support equipment, such as umbilicals and access arms, for future rocket launches. It took about two years to construct the 355-foot-tall structure, which will support NASA's future human spaceflight program. Photo credit: NASA/Jack Pfaller KSC-2010-4964

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, wor...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, workers monitor the progress of a crawler-transporter as it moves NASA's new mobile launcher (ML) support structure from a construction site, n... More

KENNEDY SPACE CENTER, FLA.  -  In the Vehicle Assembly Building, the overhead crane moves the external tank designated for Space Shuttle Discovery toward high bay 3.  In the foreground is the tip of one of the solid rocket boosters. There it will be stacked with the solid rocket boosters already in place on the mobile launcher platform.  Discovery is scheduled to launch on mission STS-121 in July.  Photo credit: NASA/Amanda Diller KSC-06pd0724

KENNEDY SPACE CENTER, FLA. - In the Vehicle Assembly Building, the o...

KENNEDY SPACE CENTER, FLA. - In the Vehicle Assembly Building, the overhead crane moves the external tank designated for Space Shuttle Discovery toward high bay 3. In the foreground is the tip of one of the ... More

KENNEDY SPACE CENTER, FLA. - Sitting atop the Mobile Launcher Platform, Space Shuttle Atlantis towers above the workers aboard.  The Shuttle and MLP rest on top of the crawler-transporter beneath it, which moves about 1 mile per hour. Atlantis is scheduled for launch April 4 on mission STS-110, which will install the S0 truss, the framework that eventually will hold the power and cooling systems needed for future international research laboratories on the International Space Station.  The  Canadarm2 robotic arm will be used exclusively to hoist the 13-ton truss from the payload bay to the Station.  The S0 truss will be the first major U.S. component launched to the Station since the addition of the Quest airlock in July 2001.  The four spacewalks planned for the construction will all originate from the airlock.  The mission will be Atlantis' 25th trip to space KSC-02pd0274

KENNEDY SPACE CENTER, FLA. - Sitting atop the Mobile Launcher Platform...

KENNEDY SPACE CENTER, FLA. - Sitting atop the Mobile Launcher Platform, Space Shuttle Atlantis towers above the workers aboard. The Shuttle and MLP rest on top of the crawler-transporter beneath it, which move... More

Skylab 3,Skylab as the CM moves in for docking

Skylab 3,Skylab as the CM moves in for docking

SL3-114-1683 (28 July 1973) --- A close-up view of the Skylab space station photographed against an Earth background from the Skylab 3 Command and Service Modules (CSM) during station-keeping maneuvers prior to... More

Saturn 1B space vehicle for ASTP moves from VAB to launch complex

Saturn 1B space vehicle for ASTP moves from VAB to launch complex

S75-24007 (24 March 1975) --- The Saturn 1B space vehicle for the Apollo-Soyuz Test Project mission, with its launch umbilical tower, rides atop a huge crawler-transporter as it moves slowly away from the Vehic... More

CAPE CANAVERAL, Fla. – A crane moves the engine-handling device away from the Pratt and Whitney Rocketdyne space shuttle main engine, or SSME, that it rotated into a horizontal position inside the SSME Processing Facility, the engine shop at NASA’s Kennedy Space Center in Florida.  The engine is secured on a portable workstand before being transferred into a transportation canister.    The engine is one of the last SSMEs remaining at Kennedy and is being prepared for shipment to NASA's Stennis Space Center in Mississippi. The first two groups of engines were shipped from Kennedy to Stennis in November 2011 and January 2012 the remaining engines are scheduled to depart on April 9.  Altogether, 15 shuttle-era engines will be stored at Stennis for reuse on NASA’s Space Launch System heavy-lift rocket, under development. Photo credit: NASA/Tim Jacobs KSC-2012-1922

CAPE CANAVERAL, Fla. – A crane moves the engine-handling device away f...

CAPE CANAVERAL, Fla. – A crane moves the engine-handling device away from the Pratt and Whitney Rocketdyne space shuttle main engine, or SSME, that it rotated into a horizontal position inside the SSME Processi... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a large crane moves the right orbital maneuvering system OMS pod closer to space shuttle Endeavour for installation.        The OMS pod underwent complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the transition and retirement processing of each shuttle. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-1907

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a large crane moves the right orbital maneuvering system OMS pod closer to space shuttle Endeavour for installa... More

CAPE CANAVERAL, Fla. – At the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, workers  check the latest Geostationary Operational Environmental Satellite, or GOES, as it moves out of the C-17 military cargo aircraft. Developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA, the GOES-O satellite is targeted to launch April 28 onboard a United Launch Alliance Delta IV expendable launch vehicle. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. GOES-O will be placed in on-orbit storage as a replacement for an older GOES satellite.  After arriving, the satellite was transported to Astrotech in Titusville, Fla., where final testing of the imaging system, instrumentation, communications and power systems will be performed. Photo credit: NASA/Kim Shiflett KSC-2009-1935

CAPE CANAVERAL, Fla. – At the Shuttle Landing Facility at NASA's Kenne...

CAPE CANAVERAL, Fla. – At the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, workers check the latest Geostationary Operational Environmental Satellite, or GOES, as it moves out of the C-1... More

CAPE CANAVERAL, Fla. – A crane moves a Pratt and Whitney Rocketdyne space shuttle main engine, or SSME, across the floor away from the work platforms inside the SSME Processing Facility, the engine shop at NASA’s Kennedy Space Center in Florida.  Operations are under way to rotate the engine into a horizontal position on a portable workstand.    The engine is one of the last SSMEs remaining at Kennedy and is being prepared for shipment to NASA's Stennis Space Center in Mississippi. The first two groups of engines were shipped from Kennedy to Stennis in November 2011 and January 2012 the remaining engines are scheduled to depart on April 9.  Altogether, 15 shuttle-era engines will be stored at Stennis for reuse on NASA’s Space Launch System heavy-lift rocket, under development. Photo credit: NASA/Tim Jacobs KSC-2012-1915

CAPE CANAVERAL, Fla. – A crane moves a Pratt and Whitney Rocketdyne sp...

CAPE CANAVERAL, Fla. – A crane moves a Pratt and Whitney Rocketdyne space shuttle main engine, or SSME, across the floor away from the work platforms inside the SSME Processing Facility, the engine shop at NASA... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a large crane moves the right orbital maneuvering system OMS pod closer to space shuttle Endeavour for installation.        The OMS pod underwent complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the transition and retirement processing of each shuttle. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-1906

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a large crane moves the right orbital maneuvering system OMS pod closer to space shuttle Endeavour for installa... More

CAPE CANAVERAL, Fla. – The latest Geostationary Operational Environmental Satellite, or GOES, moves out of the C-17 military cargo aircraft at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida.  Developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA, the GOES-O satellite is targeted to launch April 28 onboard a United Launch Alliance Delta IV expendable launch vehicle. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. GOES-O will be placed in on-orbit storage as a replacement for an older GOES satellite.  After arriving, the satellite was transported to Astrotech in Titusville, Fla., where final testing of the imaging system, instrumentation, communications and power systems will be performed. Photo credit: NASA/Kim Shiflett KSC-2009-1933

CAPE CANAVERAL, Fla. – The latest Geostationary Operational Environmen...

CAPE CANAVERAL, Fla. – The latest Geostationary Operational Environmental Satellite, or GOES, moves out of the C-17 military cargo aircraft at the Shuttle Landing Facility at NASA's Kennedy Space Center in Flor... More

CAPE CANAVERAL, Fla. – At the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, workers  check the latest Geostationary Operational Environmental Satellite, or GOES, as it moves out of the C-17 military cargo aircraft. Developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA, the GOES-O satellite is targeted to launch April 28 onboard a United Launch Alliance Delta IV expendable launch vehicle. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. GOES-O will be placed in on-orbit storage as a replacement for an older GOES satellite.  After arriving, the satellite was transported to Astrotech in Titusville, Fla., where final testing of the imaging system, instrumentation, communications and power systems will be performed. Photo credit: NASA/Kim Shiflett KSC-2009-1934

CAPE CANAVERAL, Fla. – At the Shuttle Landing Facility at NASA's Kenne...

CAPE CANAVERAL, Fla. – At the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, workers check the latest Geostationary Operational Environmental Satellite, or GOES, as it moves out of the C-1... More

CAPE CANAVERAL, Fla. – A truck moves the shrouded Atlas V first stage booster from Cape Canaveral Air Force Station's skid strip in Florida on its way to the Atlas Space Operations Center on CCAFS. The booster arrived at CCAFS aboard a Russian AH-124-100 aircraft. The Atlas V is the launch vehicle for NASA's Lunar Reconnaissance Orbiter, or LRO, and NASA's Lunar CRater Observation and Sensing Satellite, known as LCROSS.  Launch is scheduled no earlier than May 20. LCROSS and LRO are the first missions in NASA's plan to return humans to the moon and begin establishing a lunar outpost by 2020.   Photo credit: NASA/Jim Grossmann KSC-2009-1929

CAPE CANAVERAL, Fla. – A truck moves the shrouded Atlas V first stage ...

CAPE CANAVERAL, Fla. – A truck moves the shrouded Atlas V first stage booster from Cape Canaveral Air Force Station's skid strip in Florida on its way to the Atlas Space Operations Center on CCAFS. The booster ... More

A lift barge/crane, being propelled by a tugboat on each side, moves into position to lift the radar turret aboard the USNS OBSERVATION ISLAND (T-AGM-23) which is being converted to a missile and satellite tracking station. The conversion operation is called Project Cobra Judy

A lift barge/crane, being propelled by a tugboat on each side, moves i...

The original finding aid described this photograph as: Base: Baltimore State: Maryland (MD) Country: United States Of America (USA) Scene Camera Operator: CAPT John T. Franklin Release Status: Released to ... More

STS088-342-027 - STS-088 - Newman moves stowage through PMA

STS088-342-027 - STS-088 - Newman moves stowage through PMA

The original finding aid described this as: Description: View of STS-88 mission specialist James Newman moving stowage equipment through the Pressurized Mating Adpater (PMA). Subject Terms: ASTRONAUTS ONBOARD... More

STS088-342-026 - STS-088 - Newman moves stowage through PMA

STS088-342-026 - STS-088 - Newman moves stowage through PMA

The original finding aid described this as: Description: View of STS-88 mission specialist James Newman moving stowage equipment through the Pressurized Mating Adpater (PMA). Subject Terms: ASTRONAUTS ONBOARD... More

41B-35-1682 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuvering Unit during EVA

41B-35-1682 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuv...

The original finding aid described this as: Description: Astronaut Robert Stewart moves back to the shuttle Challenger after moving out to a distance of about 300 feet wearing a Manned Maneuvering Unit (MMU) d... More

41B-35-1676 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuvering Unit during EVA

41B-35-1676 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuv...

The original finding aid described this as: Description: Astronaut Robert Stewart moves back to the shuttle Challenger after moving out to a distance of about 300 feet wearing a Manned Maneuvering Unit (MMU) d... More

41B-35-1678 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuvering Unit during EVA

41B-35-1678 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuv...

The original finding aid described this as: Description: Astronaut Robert Stewart moves back to the shuttle Challenger after moving out to a distance of about 300 feet wearing a Manned Maneuvering Unit (MMU) d... More

41B-35-1700 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuvering Unit during EVA

41B-35-1700 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuv...

The original finding aid described this as: Description: Astronaut Robert Stewart moves back to the shuttle Challenger after moving out to a distance of about 300 feet wearing a Manned Maneuvering Unit (MMU) d... More

41B-35-1683 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuvering Unit during EVA

41B-35-1683 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuv...

The original finding aid described this as: Description: Astronaut Robert Stewart moves back to the shuttle Challenger after moving out to a distance of about 300 feet wearing a Manned Maneuvering Unit (MMU) d... More

41B-35-1693 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuvering Unit during EVA

41B-35-1693 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuv...

The original finding aid described this as: Description: Astronaut Robert Stewart moves back to the shuttle Challenger after moving out to a distance of about 300 feet wearing a Manned Maneuvering Unit (MMU) d... More

41B-35-1694 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuvering Unit during EVA

41B-35-1694 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuv...

The original finding aid described this as: Description: Astronaut Robert Stewart moves back to the shuttle Challenger after moving out to a distance of about 300 feet wearing a Manned Maneuvering Unit (MMU) d... More

41B-35-1685 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuvering Unit during EVA

41B-35-1685 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuv...

The original finding aid described this as: Description: Astronaut Robert Stewart moves back to the shuttle Challenger after moving out to a distance of about 300 feet wearing a Manned Maneuvering Unit (MMU) d... More

41B-35-1681 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuvering Unit during EVA

41B-35-1681 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuv...

The original finding aid described this as: Description: Astronaut Robert Stewart moves back to the shuttle Challenger after moving out to a distance of about 300 feet wearing a Manned Maneuvering Unit (MMU) d... More

41B-35-1686 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuvering Unit during EVA

41B-35-1686 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuv...

The original finding aid described this as: Description: Astronaut Robert Stewart moves back to the shuttle Challenger after moving out to a distance of about 300 feet wearing a Manned Maneuvering Unit (MMU) d... More

41B-35-1690 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuvering Unit during EVA

41B-35-1690 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuv...

The original finding aid described this as: Description: Astronaut Robert Stewart moves back to the shuttle Challenger after moving out to a distance of about 300 feet wearing a Manned Maneuvering Unit (MMU) d... More

41B-35-1697 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuvering Unit during EVA

41B-35-1697 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuv...

The original finding aid described this as: Description: Astronaut Robert Stewart moves back to the shuttle Challenger after moving out to a distance of about 300 feet wearing a Manned Maneuvering Unit (MMU) d... More

41B-35-1684 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuvering Unit during EVA

41B-35-1684 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuv...

The original finding aid described this as: Description: Astronaut Robert Stewart moves back to the shuttle Challenger after moving out to a distance of about 300 feet wearing a Manned Maneuvering Unit (MMU) d... More

41B-35-1675 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuvering Unit during EVA

41B-35-1675 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuv...

The original finding aid described this as: Description: Astronaut Robert Stewart moves back to the shuttle Challenger after moving out to a distance of about 300 feet wearing a Manned Maneuvering Unit (MMU) d... More

41B-35-1691 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuvering Unit during EVA

41B-35-1691 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuv...

The original finding aid described this as: Description: Astronaut Robert Stewart moves back to the shuttle Challenger after moving out to a distance of about 300 feet wearing a Manned Maneuvering Unit (MMU) d... More

41B-35-1698 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuvering Unit during EVA

41B-35-1698 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuv...

The original finding aid described this as: Description: Astronaut Robert Stewart moves back to the shuttle Challenger after moving out to a distance of about 300 feet wearing a Manned Maneuvering Unit (MMU) d... More

41B-35-1688 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuvering Unit during EVA

41B-35-1688 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuv...

The original finding aid described this as: Description: Astronaut Robert Stewart moves back to the shuttle Challenger after moving out to a distance of about 300 feet wearing a Manned Maneuvering Unit (MMU) d... More

41B-35-1677 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuvering Unit during EVA

41B-35-1677 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuv...

The original finding aid described this as: Description: Astronaut Robert Stewart moves back to the shuttle Challenger after moving out to a distance of about 300 feet wearing a Manned Maneuvering Unit (MMU) d... More

41B-35-1680 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuvering Unit during EVA

41B-35-1680 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuv...

The original finding aid described this as: Description: Astronaut Robert Stewart moves back to the shuttle Challenger after moving out to a distance of about 300 feet wearing a Manned Maneuvering Unit (MMU) d... More

41B-35-1689 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuvering Unit during EVA

41B-35-1689 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuv...

The original finding aid described this as: Description: Astronaut Robert Stewart moves back to the shuttle Challenger after moving out to a distance of about 300 feet wearing a Manned Maneuvering Unit (MMU) d... More

41B-35-1699 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuvering Unit during EVA

41B-35-1699 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuv...

The original finding aid described this as: Description: Astronaut Robert Stewart moves back to the shuttle Challenger after moving out to a distance of about 300 feet wearing a Manned Maneuvering Unit (MMU) d... More

41B-35-1696 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuvering Unit during EVA

41B-35-1696 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuv...

The original finding aid described this as: Description: Astronaut Robert Stewart moves back to the shuttle Challenger after moving out to a distance of about 300 feet wearing a Manned Maneuvering Unit (MMU) d... More

41B-35-1679 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuvering Unit during EVA

41B-35-1679 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuv...

The original finding aid described this as: Description: Astronaut Robert Stewart moves back to the shuttle Challenger after moving out to a distance of about 300 feet wearing a Manned Maneuvering Unit (MMU) d... More

41B-35-1692 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuvering Unit during EVA

41B-35-1692 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuv...

The original finding aid described this as: Description: Astronaut Robert Stewart moves back to the shuttle Challenger after moving out to a distance of about 300 feet wearing a Manned Maneuvering Unit (MMU) d... More

41B-35-1687 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuvering Unit during EVA

41B-35-1687 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuv...

The original finding aid described this as: Description: Astronaut Robert Stewart moves back to the shuttle Challenger after moving out to a distance of about 300 feet wearing a Manned Maneuvering Unit (MMU) d... More

41B-35-1695 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuvering Unit during EVA

41B-35-1695 - STS-41B - Astronaut Robert Stewart wearing Manned Maneuv...

The original finding aid described this as: Description: Astronaut Robert Stewart moves back to the shuttle Challenger after moving out to a distance of about 300 feet wearing a Manned Maneuvering Unit (MMU) d... More

The space shuttle Enterprise moves toward the shuttle assembly building at Space Launch Complex Six aboard its specially-designed 76-wheel transporter

The space shuttle Enterprise moves toward the shuttle assembly buildin...

The original finding aid described this photograph as: Base: Vandenberg Air Force Base State: California (CA) Country: United States Of America (USA) Scene Camera Operator: William W. Thompson Release Stat... More

End effector of the Discovery's RMS with tools moves toward Syncom-IV

End effector of the Discovery's RMS with tools moves toward Syncom-IV

51D-44-046 (17 April 1985) --- The Space Shuttle Discovery's Remote Manipulator System (RMS) arm and two specially designed extensions move toward the troubled Syncom-IV (LEASAT) communications satellite during... More

P-34648 This photograph of Neptune was reconstructed from two images taken by Voyager 2's narrow angle camera, through the green and clear filters. the image shows three of the features that Voyager 2 has been photographing during recent weeks. At the north ( top ) is the Great Dark Spot, accompanied by bright, white clouds that undergo rapid changes in appearance. to the south of the Great Dark Spot is the bright feature that Voyager scientists have nicknamed 'Scooter.' Still farther south is the feature called  ' Dark Spot 2,' which has a bright core. Each feature moves  eastward at a  different at a different velocity, so it is only occasionally that they appear close to each other, such as at the time this picture was taken. ARC-1989-AC89-7013

P-34648 This photograph of Neptune was reconstructed from two images t...

P-34648 This photograph of Neptune was reconstructed from two images taken by Voyager 2's narrow angle camera, through the green and clear filters. the image shows three of the features that Voyager 2 has been ... More

S35-08-036 - STS-035 - STS-35 Durrance moves through the interdeck hatch on OV-102's flight deck

S35-08-036 - STS-035 - STS-35 Durrance moves through the interdeck hat...

The original finding aid described this as: Description: STS-35 Payload Specialist (PS) Samuel T. Durrance, with a drink container in his mouth, moves through the interdeck hatch on the aft flight deck of Colu... More

S44-79-057 - STS-044 - Cloud Formation, Sea-Air-Land Interaction, Mozambique, Africa

S44-79-057 - STS-044 - Cloud Formation, Sea-Air-Land Interaction, Moza...

The original finding aid described this as: Description: This rare depiction of the physical interactions of air land and sea in cloud formation was seen over Mozambique (12.0S, 40.5E). Moist low air, heated a... More

S44-79-058 - STS-044 - Cloud Formation, Sea-Air-Land Interaction, Mozambique, Africa

S44-79-058 - STS-044 - Cloud Formation, Sea-Air-Land Interaction, Moza...

The original finding aid described this as: Description: This rare depiction of the physical interactions of air land and sea in cloud formation was seen over Mozambique (12.0S, 40.5E). Moist low air, heated a... More

Previous

of 15

Next