lab, nasa

3,672 media by topicpage 1 of 37
Reaction Control System Thruster examined in the electron optics lab Near Field Emission Scanning Electron Microscope GRC-2005-C-01164

Reaction Control System Thruster examined in the electron optics lab N...

Reaction Control System Thruster examined in the electron optics lab Near Field Emission Scanning Electron Microscope

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, an overhead crane carries the Integrated Truss Structure S0 to the payload canister which will transport it to the launch pad for mission STS-110.  Seen below the truss is the Multi-Purpose Logistics Module Donatello, currently not in use. The S0 truss will be part of the payload on Space Shuttle Atlantis. The S0 truss will be attached to the U.S. Lab, "Destiny,"  on the 11-day mission, becoming the backbone of the orbiting International Space Station (ISS). Launch is scheduled for April 4 KSC-02pd0344

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building,...

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, an overhead crane carries the Integrated Truss Structure S0 to the payload canister which will transport it to the launch pad for mission S... More

Dr George W. Lewis, NACA Director of Aeronautical Research  (1929-1947) first visit to Ames Lab:  L-R; John Parsons, William Mc Avoy, Donald H. Wood,  Dr. Lewis, S. J. DeFrance, Author B. Freeman, Carlton Bioletti ARC-1969-M-926

Dr George W. Lewis, NACA Director of Aeronautical Research (1929-1947...

Dr George W. Lewis, NACA Director of Aeronautical Research (1929-1947) first visit to Ames Lab: L-R; John Parsons, William Mc Avoy, Donald H. Wood, Dr. Lewis, S. J. DeFrance, Author B. Freeman, Carlton Bioletti

Date: Nov 9, 1940 Aerial view of Ames Aeronautical Laboratory showing Flight Research Lab and Construction of 16ft wind tunnel ARC-1969-M-921

Date: Nov 9, 1940 Aerial view of Ames Aeronautical Laboratory showing ...

Date: Nov 9, 1940 Aerial view of Ames Aeronautical Laboratory showing Flight Research Lab and Construction of 16ft wind tunnel

O-47A airplane arrival at Ames Aeronautical Lab The O-47A was Ames first test plane ARC-1969-M-831

O-47A airplane arrival at Ames Aeronautical Lab The O-47A was Ames fir...

O-47A airplane arrival at Ames Aeronautical Lab The O-47A was Ames first test plane

NACA Photographer 7x10ft Wind Tunnel and Lab #2 construction at the Ames Research Center, California ARC-1941-AAL-1246

NACA Photographer 7x10ft Wind Tunnel and Lab #2 construction at the Am...

NACA Photographer 7x10ft Wind Tunnel and Lab #2 construction at the Ames Research Center, California

NACA Photographer Construction of the 7x10ft Wind Tunnel and Lab #2 at the Ames Research Center, California ARC-1941-AAL-1251

NACA Photographer Construction of the 7x10ft Wind Tunnel and Lab #2 at...

NACA Photographer Construction of the 7x10ft Wind Tunnel and Lab #2 at the Ames Research Center, California

High-Energy Propellant Rocket Firing at the Rocket Lab

High-Energy Propellant Rocket Firing at the Rocket Lab

A rocket using high-energy propellant is fired from the Rocket Laboratory at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The Rocket Lab was a collection of ten one... More

NACA Apprentice is Trained on the Lab's Altitude Systems

NACA Apprentice is Trained on the Lab's Altitude Systems

An apprentice at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory shown training on the altitude supply air systems in the Engine Research Building. An ongoing four-year... More

New Rocket Lab Facility at South 40

New Rocket Lab Facility at South 40

Description (August 31, 1957) New Rocket Lab Facility at South 40 Rocket Facility. Rocket Engine Test Facility (RETF) Lewis Flight Propulsion Laboratory Lewis Research Center, now known as the Glenn Research Center.

Electronic Machine Computing Branch, 704 computing lab; (left - right) William A Mersman and Marcelline K Chartz (aka -  Marcie Smith) with IBM 704 Date Processor ARC-1969-A-24321

Electronic Machine Computing Branch, 704 computing lab; (left - right)...

Electronic Machine Computing Branch, 704 computing lab; (left - right) William A Mersman and Marcelline K Chartz (aka - Marcie Smith) with IBM 704 Date Processor

KENNEDY SPACE CENTER, Fla. --  The STS-92 crew gather outside the gate to Launch Pad 39A where Space Shuttle Discovery waits in the background for liftoff Oct. 5 at 9:38 p.m. EDT. From left to right are Commander Brian Duffy, Pilot Pamela Ann Melroy, and Mission Specialists Leroy Chiao, William S. McArthur Jr., Peter J.K. “Jeff” Wisoff, Michael E. Lopez-Alegria and Koichi Wakata of Japan. The mission payload includes Integrated Truss Structure Z-1, an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power; Ku-band communication to support early science capability and U.S. television; and the third Pressurized Mating Adapter to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. The 11-day mission will include four spacewalks KSC-00pp1486

KENNEDY SPACE CENTER, Fla. -- The STS-92 crew gather outside the gate...

KENNEDY SPACE CENTER, Fla. -- The STS-92 crew gather outside the gate to Launch Pad 39A where Space Shuttle Discovery waits in the background for liftoff Oct. 5 at 9:38 p.m. EDT. From left to right are Command... More

KENNEDY SPACE CENTER, FLA. --  Clouds of smoke and steam roll across Launch Pad 39A as Space Shuttle Endeavour leaps free above them, beginning its journey on mission STS-118.  Liftoff of Endeavour was on time at 6:36 p.m. EDT. The mission is the 22nd shuttle flight to the International Space Station. It will continue space station construction by delivering a third starboard truss segment, S5, and other payloads such as the SPACEHAB module and the external stowage platform 3.  The 11-day mission may be extended to as many as 14 depending on the test of the Station-to-Shuttle Power Transfer System that will allow the docked shuttle to draw electrical power from the station and extend its visits to the orbiting lab.  Photo credit: NASA/Sandra Joseph, Tony Gray, Robert Murray KSC-07pd2261

KENNEDY SPACE CENTER, FLA. -- Clouds of smoke and steam roll across L...

KENNEDY SPACE CENTER, FLA. -- Clouds of smoke and steam roll across Launch Pad 39A as Space Shuttle Endeavour leaps free above them, beginning its journey on mission STS-118. Liftoff of Endeavour was on time ... More

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, the U.S. Lab is lowered toward the floor after being lifted out of the vacuum chamber where it was tested for leaks. The test was very successful. The 32,000-pound scientific research lab, named Destiny, is the first Space Station element to spend seven days in the renovated vacuum chamber. Destiny is scheduled to be launched on Shuttle mission STS-98, the 5A assembly mission, targeted for Jan. 18, 2001. During the mission, the crew will install the Lab in the Space Station during a series of three space walks. The STS-98 mission will provide the Station with science research facilities and expand its power, life support and control capabilities. The U.S. Lab module continues a long tradition of microgravity materials research, first conducted by Skylab and later Shuttle and Spacelab missions. Destiny is expected to be a major feature in future research, providing facilities for biotechnology, fluid physics, combustion, and life sciences research KSC-00pp0868

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building,...

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, the U.S. Lab is lowered toward the floor after being lifted out of the vacuum chamber where it was tested for leaks. The test was very succ... More

KENNEDY SPACE CENTER, FLA. -- The U.S. Lab, a component of the International Space Station, is centered over the three-story vacuum chamber in which the Lab will be placed. The 32,000-pound scientific research lab, named Destiny, is the first Space Station element to spend seven days in the renovated vacuum chamber for a leak test. Destiny is scheduled to be launched on Shuttle mission STS-98, the 5A assembly mission, targeted for Jan. 18, 2001. During the mission, the crew will install the Lab in the Space Station during a series of three space walks. The STS-98 mission will provide the Station with science research facilities and expand its power, life support and control capabilities. The U.S. Lab module continues a long tradition of microgravity materials research, first conducted by Skylab and later Shuttle and Spacelab missions. Destiny is expected to be a major feature in future research, providing facilities for biotechnology, fluid physics, combustion, and life sciences research KSC00pp0846

KENNEDY SPACE CENTER, FLA. -- The U.S. Lab, a component of the Interna...

KENNEDY SPACE CENTER, FLA. -- The U.S. Lab, a component of the International Space Station, is centered over the three-story vacuum chamber in which the Lab will be placed. The 32,000-pound scientific research ... More

STS-98 and Expedition One crew prepare to open U.S. Lab hatch

STS-98 and Expedition One crew prepare to open U.S. Lab hatch

STS098-352-0019 (11 February 2001) --- Inside the Unity node, astronaut William M. (Bill) Shepherd (center), Expedition One commander, holds a document of receipt of the U.S. laboratory, called Destiny, as part... More

The STS-92 crew wave to onlookers as they exit the Operations and Checkout Building on their way to Launch Pad 39A for liftoff at 8:05 p.m. EDT to the International Space Station (ISS). They are (from front to back) Pilot Pamela Ann Melroy and Commander Brian Duffy; and Mission Specialists Leroy Chiao and William S. McArthur Jr.; Peter J.K. Wisoff; Michael E. Lopez-Alegria and Koichi Wakata of Japan. The mission is the fifth flight for the construction of the ISS. The payload includes the Integrated Truss Structure Z-1 and the third Pressurized Mating Adapter. During the 11-day mission, four extravehicular activities (EVAs), or spacewalks, are planned. The Z-1 truss is the first of 10 that will become the backbone of the International Space Station, eventually stretching the length of a football field. PMA-3 will provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. This launch is the fourth for Duffy and Wisoff, the third for Chiao and McArthur, second for Wakata and Lopez-Alegria, and first for Melroy. Landing is expected Oct. 21 at 3:55 p.m. EDT KSC-00padig037

The STS-92 crew wave to onlookers as they exit the Operations and Chec...

The STS-92 crew wave to onlookers as they exit the Operations and Checkout Building on their way to Launch Pad 39A for liftoff at 8:05 p.m. EDT to the International Space Station (ISS). They are (from front to ... More

KENNEDY SPACE CENTER, FLA. --  After leaving the Orbiter Processing Facility bay 2,  the orbiter Endeavour, atop its transporter, rolls toward the Vehicle Assembly Building.  In the VAB, it will be stacked with the external tank and solid rocket boosters atop the mobile launcher platform for its launch on mission STS-118. The mission will be Endeavour's first flight in more than four years. The shuttle has undergone extensive modifications, including the addition of safety upgrades already added to shuttles Discovery and Atlantis. Endeavour also features new hardware, such as the Station-to-Shuttle Power Transfer System that will allow the docked shuttle to draw electrical power from the station and extend its visits to the orbiting lab.  Endeavour is targeted for launch on Aug. 7.   Photo credit: NASA/Kim Shiflett KSC-07pd1709

KENNEDY SPACE CENTER, FLA. -- After leaving the Orbiter Processing Fa...

KENNEDY SPACE CENTER, FLA. -- After leaving the Orbiter Processing Facility bay 2, the orbiter Endeavour, atop its transporter, rolls toward the Vehicle Assembly Building. In the VAB, it will be stacked with... More

KENNEDY SPACE CENTER, FLA. --  After greeting the media on the Shuttle Landing Facility at NASA's Kennedy Space Center, the STS-122 crew stands in front of space shuttle Atlantis for a final group photo.  From left are Mission Specialists Leland Melvin, Hans Schlegel, Rex Walheim  and Stanley Love, Pilot Alan Poindexter and Commander Steve Frick.  Schlegel represents the European Space Agency.  After a round trip of nearly 5.3 million miles, space shuttle Atlantis and crew returned to Earth with a landing at 9:07 a.m. EST. The shuttle landed on orbit 202 to complete the 13-day STS-122 mission. Main gear touchdown was 9:07:10 a.m. Nose gear touchdown was 9:07:20 a.m. Wheel stop was at 9:08:08 a.m. Mission elapsed time was 12 days, 18 hours, 21 minutes and 44 seconds. During the mission, Atlantis' crew installed the new Columbus laboratory, leaving a larger space station and one with increased science capabilities. The Columbus Research Module adds nearly 1,000 cubic feet of habitable volume and affords room for 10 experiment racks, each an independent science lab. Photo credit: NASA/Jack Pfaller KSC-08pd0407

KENNEDY SPACE CENTER, FLA. -- After greeting the media on the Shuttle...

KENNEDY SPACE CENTER, FLA. -- After greeting the media on the Shuttle Landing Facility at NASA's Kennedy Space Center, the STS-122 crew stands in front of space shuttle Atlantis for a final group photo. From ... More

KENNEDY SPACE CENTER, FLA. -- After a nearly 5.3 million mile round trip to the International Space Station, space shuttle Atlantis slows down with the aid of a drag chute after landing on Runway 15 of the Shuttle Landing Facility at NASA's Kennedy Space Center.  The shuttle landed on orbit 202 to complete the 13-day STS-122 mission. Main gear touchdown was 9:07:10 a.m. Nose gear touchdown was 9:07:20 a.m. Wheel stop was at 9:08:08 a.m. Mission elapsed time was 12 days, 18 hours, 21 minutes and 44 seconds. During the mission, Atlantis' crew installed the new Columbus laboratory, leaving a larger space station and one with increased science capabilities. The Columbus Research Module adds nearly 1,000 cubic feet of habitable volume and affords room for 10 experiment racks, each an independent science lab. Photo credit: NASA/Kenny Allen, Robert Murray KSC-08pp0440

KENNEDY SPACE CENTER, FLA. -- After a nearly 5.3 million mile round tr...

KENNEDY SPACE CENTER, FLA. -- After a nearly 5.3 million mile round trip to the International Space Station, space shuttle Atlantis slows down with the aid of a drag chute after landing on Runway 15 of the Shut... More

STS-92 Pilot Pamela Ann Melroy is happy to arrive at the KSC Shuttle Landing Facility after a flight from Houston. She and the rest of the crew are at KSC to take part in Terminal Countdown Demonstration Test activities, which include emergency egress training from the orbiter and pad, and a simulated countdown. The fifth mission to the International Space Station, STS-92 will carry the Integrated Truss Structure Z1, the first of the planned 10 trusses on the Space Station, and the third Pressurized Mating Adapter. The Z1 will allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. PMA-3 will provide a Shuttle docking port for the solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. STS-92 is scheduled to launch Oct. 5 from launch Pad 39A. It will be the 100th flight in the Shuttle program KSC00pp1304

STS-92 Pilot Pamela Ann Melroy is happy to arrive at the KSC Shuttle L...

STS-92 Pilot Pamela Ann Melroy is happy to arrive at the KSC Shuttle Landing Facility after a flight from Houston. She and the rest of the crew are at KSC to take part in Terminal Countdown Demonstration Test a... More

KENNEDY SPACE CENTER, FLA. --  In the Operations and Checkout Building, STS-118 Pilot Charlie Hobaugh is ready after suitup to head for the launch pad  and board Space Shuttle Endeavour.  The STS-118 mission is the 22nd shuttle flight to the International Space Station. It will continue space station construction by delivering a third starboard truss segment, S5, and other payloads such as the SPACEHAB module and the external stowage platform 3.  The 11-day mission may be extended to as many as 14 depending on the test of the Station-to-Shuttle Power Transfer System that will allow the docked shuttle to draw electrical power from the station and extend its visits to the orbiting lab.  NASA/Kim Shiflett KSC-07pd2240

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building...

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, STS-118 Pilot Charlie Hobaugh is ready after suitup to head for the launch pad and board Space Shuttle Endeavour. The STS-118 mission is... More

KENNEDY SPACE CENTER, FLA. - The Italian-built module, U.S. Node 2, for the International Space Station is offloaded from a Beluga aircraft at the Shuttle Landing Facility. The second of three Station connecting modules, Node 2 attaches to the end of the U.S. Lab and provides attach locations for the Japanese laboratory, European laboratory, the Centrifuge Accommodation Module and, later, Multipurpose Logistics Modules. It will provide the primary docking location for the Shuttle when a pressurized mating adapter is attached to Node 2.  Installation of the module will complete  the U.S. Core of the ISS.  Node 2 is the designated payload for mission STS-120.  No orbiter or launch date has been determined yet.

KENNEDY SPACE CENTER, FLA. - The Italian-built module, U.S. Node 2, fo...

KENNEDY SPACE CENTER, FLA. - The Italian-built module, U.S. Node 2, for the International Space Station is offloaded from a Beluga aircraft at the Shuttle Landing Facility. The second of three Station connectin... More

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, the U.S. Lab, a component of the International Space Station, is lowered into a three-story vacuum chamber. The 32,000-pound scientific research lab, named Destiny, is the first Space Station element to spend seven days in the renovated vacuum chamber for a leak test. Destiny is scheduled to be launched on Shuttle mission STS-98, the 5A assembly mission, targeted for Jan. 18, 2001. During the mission, the crew will install the Lab in the Space Station during a series of three space walks. The STS-98 mission will provide the Station with science research facilities and expand its power, life support and control capabilities. The U.S. Lab module continues a long tradition of microgravity materials research, first conducted by Skylab and later Shuttle and Spacelab missions. Destiny is expected to be a major feature in future research, providing facilities for biotechnology, fluid physics, combustion, and life sciences research KSC-00pp0847

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building,...

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, the U.S. Lab, a component of the International Space Station, is lowered into a three-story vacuum chamber. The 32,000-pound scientific res... More

KENNEDY SPACE CENTER, FLA. -- At NASA's Kennedy Space Center, the payload canister atop its transporter rolls toward Launch Pad 39A. The canister contains the Columbus Lab module and integrated cargo carrier-lite payloads for space shuttle Atlantis on mission STS-122.  They will be transferred into the payload changeout room on the pad. Atlantis is targeted to launch on Dec. 6.  Photo credit: NASA/Dimitri Gerondidakis KSC-07pd3237

KENNEDY SPACE CENTER, FLA. -- At NASA's Kennedy Space Center, the payl...

KENNEDY SPACE CENTER, FLA. -- At NASA's Kennedy Space Center, the payload canister atop its transporter rolls toward Launch Pad 39A. The canister contains the Columbus Lab module and integrated cargo carrier-li... More

KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility bay 1, members of the STS-92 crew examine equipment that will be part of their mission to the International Space Station (ISS). The fourth U.S. flight to the ISS, the mission payload includes the Integrated Truss Structure Z1, an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power; Ku-band communication to support early science capability and U.S. television; and PMA-3 to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. The crew comprises Mission Commander Brian Duffy, Pilot Pamela Melroy, and Mission Specialists Koichi Wakata, Leroy Chiao, Peter "Jeff" Wisoff, Michael Lopez-Alegria, and William McArthur. Launch of STS-92 is scheduled for Sept. 21, 2000. Wakata is with the National Space Development Agency of Japan KSC00pp0522

KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility bay 1...

KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility bay 1, members of the STS-92 crew examine equipment that will be part of their mission to the International Space Station (ISS). The fourth U.S. ... More

KENNEDY SPACE CENTER, FLA. -- The STS-98 crew poses for a group photo on the 215-foot level of the Fixed Service Structure at Launch Pad 39A. Dressed in their orange launch and entry suits are (left to right) Commander Ken Cockrell, Mission Specialist Marsha Ivins, Pilot Mark Polansky and Mission Specialists Robert Curbeam and Thomas Jones. Behind them can be seen the white nose cone of a solid rocket booster and the orange external tank on Space Shuttle Atlantis. The crew is taking part in emergency egress training and a simulated launch countdown as part of Terminal Countdown Demonstration Test activities. STS-98 is the seventh construction flight to the International Space Station, carrying as payload the U.S. Lab Destiny, a key element in the construction of the ISS. Launch of STS-98 is scheduled for Jan. 19 at 2:11 a.m. EST KSC01pp0058

KENNEDY SPACE CENTER, FLA. -- The STS-98 crew poses for a group photo ...

KENNEDY SPACE CENTER, FLA. -- The STS-98 crew poses for a group photo on the 215-foot level of the Fixed Service Structure at Launch Pad 39A. Dressed in their orange launch and entry suits are (left to right) C... More

KENNEDY SPACE CENTER, FLA. - Armando Oliu, Final Inspection Team lead for the Shuttle program, speaks to reporters about the aid the Image Analysis Lab is giving the FBI in a kidnapping case.  Behind him at right is Mike Rein, External Affairs division chief.  Oliu oversees the image lab that is using an advanced SGI® TP9500 data management system to review the tape of the kidnapping in progress in Sarasota, Fla.  KSC installed the new $3.2 million system in preparation for Return to Flight of the Space Shuttle fleet.  The lab is studying the Sarasota kidnapping video to provide any new information possible to law enforcement officers.  KSC is joining NASA’s Marshall Space Flight Center in Alabama in reviewing the tape.

KENNEDY SPACE CENTER, FLA. - Armando Oliu, Final Inspection Team lead ...

KENNEDY SPACE CENTER, FLA. - Armando Oliu, Final Inspection Team lead for the Shuttle program, speaks to reporters about the aid the Image Analysis Lab is giving the FBI in a kidnapping case. Behind him at rig... More

The STS-92 crew spends a few minutes on the tarmac at the KSC Shuttle Landing Facility to address the media. At the microphone, Commander Brian Duffy introduces the crew: (from left) Mission Specialists Koichi Wakata, Michael Lopez-Alegria, Jeff Wisoff, Bill McArthur and Leroy Chiao; and Pilot Pam Melroy. The crew is at KSC to take part in Terminal Countdown Demonstration Test (TCDT) activities. The TCDT includes emergency egress training from the orbiter and pad, plus a simulated countdown. The fifth mission to the International Space Station, STS-92 will carry the Integrated Truss Structure Z1, the first of the planned 10 trusses on the Space Station, and the third Pressurized Mating Adapter. The Z1 will allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. PMA-3 will provide a Shuttle docking port for the solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. STS-92 is scheduled to launch Oct. 5 from launch Pad 39A. It will be the 100th flight in the Shuttle program KSC00pp1308

The STS-92 crew spends a few minutes on the tarmac at the KSC Shuttle ...

The STS-92 crew spends a few minutes on the tarmac at the KSC Shuttle Landing Facility to address the media. At the microphone, Commander Brian Duffy introduces the crew: (from left) Mission Specialists Koichi ... More

STS-98 Commander Kenneth D. Cockrell (left) and Mission Specialist Thomas D. Jones (Ph.D.) check out equipment in the U.S. Lab Destiny during a Multi-Equipment Interface Test. During the mission, Jones will help install the Lab on the International Space Station in a series of three space walks. The STS-98 mission will provide the station with science research facilities and expand its power, life support and control capabilities. The U.S. Laboratory Module continues a long tradition of microgravity materials research, first conducted by Skylab and later Shuttle and Spacelab missions. Destiny is expected to be a major feature in future research, providing facilities for biotechnology, fluid physics, combustion, and life sciences research. Others in the five-member crew on STS-98 are Pilot Mark L. Polansky, and Mission Specialists Robert L. Curbeam Jr. and Marsha S. Ivins. The Lab is planned for launch aboard Space Shuttle Atlantis on the sixth ISS flight, currently targeted no earlier than Aug. 19, 2000 KSC-00pp0176

STS-98 Commander Kenneth D. Cockrell (left) and Mission Specialist Tho...

STS-98 Commander Kenneth D. Cockrell (left) and Mission Specialist Thomas D. Jones (Ph.D.) check out equipment in the U.S. Lab Destiny during a Multi-Equipment Interface Test. During the mission, Jones will hel... More

STS-92 Pilot Pamela Ann Melroy has her helmet checked during suitup for launch, scheduled for 8:05 p.m. EDT. The mission is the fifth flight for the construction of the ISS. The payload includes the Integrated Truss Structure Z-1 and the third Pressurized Mating Adapter. During the 11-day mission, four extravehicular activities (EVAs), or spacewalks, are planned. The Z-1 truss is the first of 10 that will become the backbone of the International Space Station, eventually stretching the length of a football field. PMA-3 will provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. This launch is the first for Melroy. Landing is expected Oct. 21 at 3:55 p.m. EDT KSC-00pp1523

STS-92 Pilot Pamela Ann Melroy has her helmet checked during suitup fo...

STS-92 Pilot Pamela Ann Melroy has her helmet checked during suitup for launch, scheduled for 8:05 p.m. EDT. The mission is the fifth flight for the construction of the ISS. The payload includes the Integrated ... More

KENNEDY SPACE CENTER, FLA. --  Space Shuttle Endeavour races into the sky trailing columns of fire from the solid rocket boosters as it begins mission STS-118. The liftoff from Launch Pad 39A was on time at 6:36 p.m. EDT.  The mission is the 22nd shuttle flight to the International Space Station. It will continue space station construction by delivering a third starboard truss segment, S5, and other payloads such as the SPACEHAB module and the external stowage platform 3.  The 11-day mission may be extended to as many as 14 depending on the test of the Station-to-Shuttle Power Transfer System that will allow the docked shuttle to draw electrical power from the station and extend its visits to the orbiting lab.  Photo credit: NASA/Jerry Cannon, Mike Kerley KSC-07pd2271

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour races into the ...

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour races into the sky trailing columns of fire from the solid rocket boosters as it begins mission STS-118. The liftoff from Launch Pad 39A was on time at 6:3... More

KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39-A, the STS-111 and Expedition Five crews take time out from a tour of the pad with their friends and family to pose for a group portrait.  From left, they are STS-111 Pilot Paul Lockhart, STS-111 Commander Kenneth Cockrell, Expedition Five Commander Valeri Korzun (RSA), Expedition Five astronaut Peggy Whitson, Expedition Five cosmonaut Sergei Treschev (RSA), and STS-111 Mission Specialists Philippe Perrin (CNES) and Franklin Chang-Diaz.  Expedition Five is traveling to the International Space Station on Space Shuttle Endeavour as the replacement crew for Expedition Four, who will return to Earth aboard the orbiter. Known as Utilization Flight 2, STS-111 is carrying supplies and equipment to the Station. The payload includes the Multi-Purpose Logistics Module Leonardo, the Mobile Base System, which will be installed on the Mobile Transporter to complete the Canadian Mobile Servicing System, or MSS, and a replacement wrist/roll joint for Canadarm 2. The mechanical arm will then have the capability to "inchworm" from the U.S. Lab Destiny to the MSS and travel along the truss to work sites. Launch is scheduled for May 30, 2002 KSC-02pd0814

KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39-A, the STS-111 and Expe...

KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39-A, the STS-111 and Expedition Five crews take time out from a tour of the pad with their friends and family to pose for a group portrait. From left, they are STS-... More

STS-92 Commander Brian Duffy smiles after landing at the KSC Shuttle Landing Facility in a T-38 training jet aircraft. He and the rest of the crew are at KSC to take part in Terminal Countdown Demonstration Test activities, which include emergency egress training from the orbiter and pad, and a simulated countdown. The fifth mission to the International Space Station, STS-92 will carry the Integrated Truss Structure Z1, the first of the planned 10 trusses on the Space Station, and the third Pressurized Mating Adapter. The Z1 will allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. PMA-3 will provide a Shuttle docking port for the solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. STS-92 is scheduled to launch Oct. 5 from launch Pad 39A. It will be the 100th flight in the Shuttle program KSC-00pp1303

STS-92 Commander Brian Duffy smiles after landing at the KSC Shuttle L...

STS-92 Commander Brian Duffy smiles after landing at the KSC Shuttle Landing Facility in a T-38 training jet aircraft. He and the rest of the crew are at KSC to take part in Terminal Countdown Demonstration Tes... More

KENNEDY SPACE CENTER, FLA. -- The U.S. Lab, a component of the International Space Station, is lifted off the floor of the Operations and Checkout Building in order to be placed inside the vacuum chamber in the building. The 32,000-pound scientific research lab, named Destiny, is the first Space Station element to spend seven days in the renovated vacuum chamber for a leak test. Destiny is scheduled to be launched on Shuttle mission STS-98, the 5A assembly mission, targeted for Jan. 18, 2001. During the mission, the crew will install the Lab in the Space Station during a series of three space walks. The STS-98 mission will provide the Station with science research facilities and expand its power, life support and control capabilities. The U.S. Lab module continues a long tradition of microgravity materials research, first conducted by Skylab and later Shuttle and Spacelab missions. Destiny is expected to be a major feature in future research, providing facilities for biotechnology, fluid physics, combustion, and life sciences research KSC-00pp0843

KENNEDY SPACE CENTER, FLA. -- The U.S. Lab, a component of the Interna...

KENNEDY SPACE CENTER, FLA. -- The U.S. Lab, a component of the International Space Station, is lifted off the floor of the Operations and Checkout Building in order to be placed inside the vacuum chamber in the... More

KENNEDY SPACE CENTER, FLA. --  In the Space Station Processing Facility, overhead cranes move the U.S. Lab Destiny from its test and integration stand to the Launch Package Integration Stand (LPIS) for a weight and center of gravity determination. Destiny is the payload aboard Space Shuttle Atlantis on mission STS-98 to the International Space Station. The lab is fitted with five system racks and will already have experiments installed inside for the flight. The launch is scheduled for January 2001 KSC00pp1933

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facilit...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, overhead cranes move the U.S. Lab Destiny from its test and integration stand to the Launch Package Integration Stand (LPIS) for a weight... More

KENNEDY SPACE CENTER, FLA. -- The orbiter Endeavour, atop its transporter, rolls into the gaping doorway of the Vehicle Assembly Building.  In the VAB, it will be stacked with the external tank and solid rocket boosters atop the mobile launcher platform for its launch on mission STS-118.  The mission will be Endeavour's first flight in more than four years. The shuttle has undergone extensive modifications, including the addition of safety upgrades already added to shuttles Discovery and Atlantis. Endeavour also features new hardware, such as the Station-to-Shuttle Power Transfer System that will allow the docked shuttle to draw electrical power from the station and extend its visits to the orbiting lab.  Endeavour is targeted for launch on Aug. 7.   Photo credit: NASA/George Shelton KSC-07pd1707

KENNEDY SPACE CENTER, FLA. -- The orbiter Endeavour, atop its transpor...

KENNEDY SPACE CENTER, FLA. -- The orbiter Endeavour, atop its transporter, rolls into the gaping doorway of the Vehicle Assembly Building. In the VAB, it will be stacked with the external tank and solid rocket... More

During suitup in the Operations and Checkout Building, STS-92 Mission Specialist Koichi Wakata of Japan signals thumbs up for a second launch attempt. During the 11-day mission to the International Space Station, four extravehicular activities (EVAs), or spacewalks, are planned for construction. The payload includes the Integrated Truss Structure Z-1 and the third Pressurized Mating Adapter. The Z-1 truss is the first of 10 that will become the backbone of the Space Station, eventually stretching the length of a football field. PMA-3 will provide a Shuttle docking port for solar array installation on the sixth Station flight and Lab installation on the seventh Station flight.; Launch is scheduled for 7:17 p.m. EDT. Landing is expected Oct. 22 at 2:10 p.m. EDT KSC-00pp1539

During suitup in the Operations and Checkout Building, STS-92 Mission ...

During suitup in the Operations and Checkout Building, STS-92 Mission Specialist Koichi Wakata of Japan signals thumbs up for a second launch attempt. During the 11-day mission to the International Space Statio... More

KENNEDY SPACE CENTER, FLA. -  STS-110 Mission Specialist Steven Smith is wished good luck by a member of the Closeout Crew before entering Space Shuttle Atlantis for launch. The White Room provides entry into the cockpit area of the orbiter.  This is Smith's fourth Shuttle flight. STS-110 is carrying the S0 Integrated Truss Structure and Mobile Transporter (MT) on this 13th assembly flight to the International Space Station.  On the 11-day mission, astronauts, including Smith, will make four spacewalks to attach the S0 truss, which will become the backbone of the Space Station, to the U.S. Lab, "Destiny."   The  MT, a space "railcar," is attached to the truss segment and will make its debut run during the flight.  Launch is scheduled for 4:40 p.m. EDT (20:40 GMT) KSC-02pp0477

KENNEDY SPACE CENTER, FLA. - STS-110 Mission Specialist Steven Smith ...

KENNEDY SPACE CENTER, FLA. - STS-110 Mission Specialist Steven Smith is wished good luck by a member of the Closeout Crew before entering Space Shuttle Atlantis for launch. The White Room provides entry into t... More

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, workers and the STS-98 crew gather for a ceremony that turns over the “key” for the U.S. Lab Destiny to NASA. Holding the key (left) is STS-98 Commander Ken Cockrell. To his left is Mission Specialist Thomas Jones; at right (in uniform) is Mission Specialist Marsha Ivins. Also in the group are Pilot Mark Polansky and Mission Specialist Robert Curbeam. . Launch of mission STS-98 on Space Shuttle Atlantis is scheduled for Jan. 18, 2001. The mission will carry the U.S. Lab Destiny to the International Space Station with five system racks and experiments already installed inside the module KSC-00padig130

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, workers and the STS-98 crew gather for a ceremony that turns over the “key” for the U.S. Lab Destiny to NASA. Holding the key (left) is ST... More

KENNEDY SPACE CENTER, Fla. --  Twin columns of flame from the solid rocket boosters illuminate the clouds of smoke and steam as Space Shuttle Discovery lifts off on mission STS-92, the fifth construction flight for the International Space Station. The perfect on-time liftoff occurred at 7:17 p.m. EDT, sending a crew of seven on the 100th launch in the history of the Shuttle program. Discovery carries a payload that includes the Integrated Truss Structure Z-1, first of 10 trusses that will form the backbone of the Space Station, and the third Pressurized Mating Adapter that will provide a Shuttle docking port for solar array installation on the sixth Station flight and Lab installation on the seventh Station flight. Discovery’s landing is expected Oct. 22 at 2:10 p.m. EDT KSC-00pp1551

KENNEDY SPACE CENTER, Fla. -- Twin columns of flame from the solid ro...

KENNEDY SPACE CENTER, Fla. -- Twin columns of flame from the solid rocket boosters illuminate the clouds of smoke and steam as Space Shuttle Discovery lifts off on mission STS-92, the fifth construction flight... More

KENNEDY SPACE CENTER, FLA. -- With umbilical lines still attached, the payload canister containing the Columbus Laboratory module and integrated cargo carrier-lite is lifted up toward the payload changeout room on Launch Pad 39A at NASA's Kennedy Space Center.  Once in place, the canister will be opened and the module transferred inside the payload changeout room. The payload will be installed in space shuttle Atlantis' payload bay. The canister contains the Columbus Lab module and integrated cargo carrier-lite payloads for space shuttle Atlantis on mission STS-122.  Atlantis is targeted to launch on Dec. 6.  Photo credit: NASA/Dimitri Gerondidakis KSC-07pd3243

KENNEDY SPACE CENTER, FLA. -- With umbilical lines still attached, the...

KENNEDY SPACE CENTER, FLA. -- With umbilical lines still attached, the payload canister containing the Columbus Laboratory module and integrated cargo carrier-lite is lifted up toward the payload changeout room... More

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, the U.S. Lab, named Destiny, is lowered into the rotation and handling fixture in preparation for testing in the altitude chamber. Destiny is scheduled to fly on mission STS-98 in early 2001. During the mission, the crew will install the Lab in the Space Station during a series of three space walks. The STS-98 mission will provide the Station with science research facilities and expand its power, life support and control capabilities. The U.S. Lab module continues a long tradition of microgravity materials research, first conducted by Skylab and later Shuttle and Spacelab missions. Destiny is expected to be a major feature in future research, providing facilities for biotechnology, fluid physics, combustion, and life sciences research KSC00pp0830

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building,...

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, the U.S. Lab, named Destiny, is lowered into the rotation and handling fixture in preparation for testing in the altitude chamber. Destiny ... More

KENNEDY SPACE CENTER, FLA. -- STS-98 Mission Commander Kenneth Cockrell speaks to the media at the Shuttle Landing Facility after the crew's arrival Sunday to complete preparations for launch. The crew also includes Pilot Mark Polansky and Mission Specialists Thomas Jones, Marsha Ivins and Robert Curbeam.; STS-98 is the seventh construction flight to the International Space Station, carrying as payload the U.S. Lab Destiny, a key element in the construction of the ISS. Launch of STS-98 is scheduled for Feb. 7 at 6:11 p.m. EST KSC01padig042

KENNEDY SPACE CENTER, FLA. -- STS-98 Mission Commander Kenneth Cockrel...

KENNEDY SPACE CENTER, FLA. -- STS-98 Mission Commander Kenneth Cockrell speaks to the media at the Shuttle Landing Facility after the crew's arrival Sunday to complete preparations for launch. The crew also inc... More

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis moves back inside the Vehicle Assembly Building after an aborted rollout to Launch Pad 39A. Atlantis will fly on mission STS-98, the seventh construction flight to the International Space Station. The orbiter will carry in its payload bay the U.S. Laboratory, named Destiny, that will have five system racks already installed inside the module. After delivery of electronics in the lab, electrically powered attitude control for Control Moment Gyroscopes will be activated. Atlantis is scheduled for launch no earlier than Jan. 19, 2001, with a crew of five KSC01pp0009

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis moves back inside...

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis moves back inside the Vehicle Assembly Building after an aborted rollout to Launch Pad 39A. Atlantis will fly on mission STS-98, the seventh construction fli... More

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Atlantis inches its way out the doors of the Vehicle Assembly Building as it begins rolling out to Launch Pad 39A for the second time. An attempt to roll out on Jan. 2 incurred a failed computer processor on the crawler transporter and the Shuttle was returned to the Vehicle Assembly Building using a secondary computer processor on the vehicle. Atlantis will fly on mission STS-98, the seventh construction flight to the International Space Station, carrying the U.S. Laboratory, named Destiny. The lab will have five system racks already installed inside the module. After delivery of electronics in the lab, electrically powered attitude control for Control Moment Gyroscopes will be activated. Atlantis is scheduled for launch no earlier than Jan. 19, 2001, with a crew of five KSC01pp0012

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Atlantis inches its way ou...

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Atlantis inches its way out the doors of the Vehicle Assembly Building as it begins rolling out to Launch Pad 39A for the second time. An attempt to roll out on Jan. ... More

KENNEDY SPACE CENTER, FLA. - The Italian-built module, U.S. Node 2, for the International Space Station is offloaded from a Beluga aircraft at the Shuttle Landing Facility. The second of three Station connecting modules, Node 2 attaches to the end of the U.S. Lab and provides attach locations for the Japanese laboratory, European laboratory, the Centrifuge Accommodation Module and, later, Multipurpose Logistics Modules. It will provide the primary docking location for the Shuttle when a pressurized mating adapter is attached to Node 2.  Installation of the module will complete  the U.S. Core of the ISS.  Node 2 is the designated payload for mission STS-120.  No orbiter or launch date has been determined yet.

KENNEDY SPACE CENTER, FLA. - The Italian-built module, U.S. Node 2, fo...

KENNEDY SPACE CENTER, FLA. - The Italian-built module, U.S. Node 2, for the International Space Station is offloaded from a Beluga aircraft at the Shuttle Landing Facility. The second of three Station connectin... More

TRAINING - ASTRONAUT GLENN, JOHN - AEROMEDICAL LAB - CAPE

TRAINING - ASTRONAUT GLENN, JOHN - AEROMEDICAL LAB - CAPE

S61-04623 (1961) --- Astronaut John H. Glenn Jr. looks into a Celestial Training Device (globe) during training in the Aeromedical Laboratory at Cape Canaveral, Florida. Photo credit: NASA

Dr. Cyril A. Ponnamperuma in Lab (Chemical Evolution Branch).  Origin of Life studies ARC-1964-AC-33753-7

Dr. Cyril A. Ponnamperuma in Lab (Chemical Evolution Branch). Origin ...

Dr. Cyril A. Ponnamperuma in Lab (Chemical Evolution Branch). Origin of Life studies

Dr Mead and Members of staff in front of Flight Research Lab building ARC-1969-M-855

Dr Mead and Members of staff in front of Flight Research Lab building ...

Dr Mead and Members of staff in front of Flight Research Lab building

First Apollo 11 Sample Return Containers - Unloading - Lunar Receiving Lab (LRL) - MSC

First Apollo 11 Sample Return Containers - Unloading - Lunar Receiving...

S69-40110 (25 July 1969) --- The first Apollo 11 sample return container, containing lunar surface material, is photographed just after it arrives at the Lunar Receiving Laboratory (LRL), Building 37, Manned Sp... More

Apollo XI Crewmen - Dining - Crew Reception Area - Lunar Receiving Lab (LRL) - MSC

Apollo XI Crewmen - Dining - Crew Reception Area - Lunar Receiving Lab...

S69-40306 (30 July 1969) --- The crewmen of the historic Apollo 11 lunar landing mission are seen dining in the Crew Reception Area of the Lunar Receiving Laboratory, Building 37, Manned Spacecraft Center. Left... More

Apollo XI Crewmen - Dining - Crew Reception Area - Lunar Receiving Lab (LRL) - MSC

Apollo XI Crewmen - Dining - Crew Reception Area - Lunar Receiving Lab...

S69-40307 (30 July 1969) --- The crewmen of the historic Apollo 11 lunar landing mission stand in the serving line as they prepare to dine in the Crew Reception Area of the Lunar Receiving Laboratory, Building ... More

NASA High Rise Lab - Public domain NASA photogrpaph

NASA High Rise Lab - Public domain NASA photogrpaph

Original caption: NASA Cambridge, Mass. High Rise Lab. Construction Project Photographs

KENNEDY SPACE CENTER, FLA. -   Workers in the Orbiter Processing Facility bay 1 watch the progress of the Pressurized Mating Adapter-3 (PMA-3) as it is transferred to the payload bay of the orbiter Discovery.  A component of the International Space Station, the PMA-3 will fly on Shuttle mission STS-92, scheduled to launch October 5.  The mission will be the fifth flight to the Space Station, and the 100th Shuttle flight overall.  PMA-3 provides shuttle docking port for solar array installation on flight 4A (mission STS-97 scheduled for November 30), and Lab installation on flight 5A (mission STS-98, scheduled for January 18, 2001). KSC00PP-0878

KENNEDY SPACE CENTER, FLA. - Workers in the Orbiter Processing Facil...

KENNEDY SPACE CENTER, FLA. - Workers in the Orbiter Processing Facility bay 1 watch the progress of the Pressurized Mating Adapter-3 (PMA-3) as it is transferred to the payload bay of the orbiter Discovery. ... More

KENNEDY SPACE CENTER, FLA. -- With the aid of a drag chute billowing behind it, space shuttle Atlantis slows to a stop on Runway 15 of the Shuttle Landing Facility at NASA's Kennedy Space Center.  At left is one of the fire/rescue vehicles standing by in the event of an emergency.  The shuttle landed on orbit 202 to complete the 13-day STS-122 mission. Main gear touchdown was 9:07:10 a.m. Nose gear touchdown was 9:07:20 a.m. Wheel stop was at 9:08:08 a.m. Mission elapsed time was 12 days, 18 hours, 21 minutes and 44 seconds. During the mission, Atlantis' crew installed the new Columbus laboratory, leaving a larger space station and one with increased science capabilities. The Columbus Research Module adds nearly 1,000 cubic feet of habitable volume and affords room for 10 experiment racks, each an independent science lab. Photo credit: NASA/Norley Willets KSC-08pd0378

KENNEDY SPACE CENTER, FLA. -- With the aid of a drag chute billowing b...

KENNEDY SPACE CENTER, FLA. -- With the aid of a drag chute billowing behind it, space shuttle Atlantis slows to a stop on Runway 15 of the Shuttle Landing Facility at NASA's Kennedy Space Center. At left is on... More

STS-98 Mission Specialist Thomas Jones happily arrives at KSC’s Shuttle Landing Facility for Terminal Countdown Test Activities. In preparation for the Jan. 19 launch, he and the rest of the crew Commander Ken Cockrell, Pilot Mark Polansky and Mission Specialists Robert Curbeam and Marsha Ivins will be training in emergency procedures from the pad, checking the payload and taking part in a simulated countdown. The payload for the mission is the U.S. Lab Destiny, a key element in the construction of the International Space Station. The lab has five system racks already installed inside the module. After delivery of electronics in the lab, electrically powered attitude control for Control Moment Gyroscopes will be activated. STS-98 is the seventh construction flight to the ISS.<br KSC01pp0020

STS-98 Mission Specialist Thomas Jones happily arrives at KSC’s Shuttl...

STS-98 Mission Specialist Thomas Jones happily arrives at KSC’s Shuttle Landing Facility for Terminal Countdown Test Activities. In preparation for the Jan. 19 launch, he and the rest of the crew Commander Ken ... More

KENNEDY SPACE CENTER, FLA. --  Fiery clouds of smoke stream across Launch Pad 39A as Space Shuttle Endeavour lifts off on mission STS-118.  The liftoff was on time at 6:36 p.m. EDT.  The mission is the 22nd shuttle flight to the International Space Station. It will continue space station construction by delivering a third starboard truss segment, S5, and other payloads such as the SPACEHAB module and the external stowage platform 3.  The 11-day mission may be extended to as many as 14 depending on the test of the Station-to-Shuttle Power Transfer System that will allow the docked shuttle to draw electrical power from the station and extend its visits to the orbiting lab.  Photo credit: Jerry Cannon, Mike Kerley KSC-07pd2270

KENNEDY SPACE CENTER, FLA. -- Fiery clouds of smoke stream across Lau...

KENNEDY SPACE CENTER, FLA. -- Fiery clouds of smoke stream across Launch Pad 39A as Space Shuttle Endeavour lifts off on mission STS-118. The liftoff was on time at 6:36 p.m. EDT. The mission is the 22nd shu... More

KENNEDY SPACE CENTER, FLA. -- Workers watch as the U.S. Laboratory Destiny, a component of the International Space Station, is lowered into a payload canister for transfer to the Operations and Checkout Building where it will be tested in the altitude chamber. Destiny is scheduled to fly on mission STS-98 in early 2001. During the mission, the crew will install the Lab in the Space Station during a series of three space walks. The STS-98 mission will provide the Station with science research facilities and expand its power, life support and control capabilities. The U.S. Lab module continues a long tradition of microgravity materials research, first conducted by Skylab and later Shuttle and Spacelab missions. Destiny is expected to be a major feature in future research, providing facilities for biotechnology, fluid physics, combustion, and life sciences research KSC00pp0810

KENNEDY SPACE CENTER, FLA. -- Workers watch as the U.S. Laboratory Des...

KENNEDY SPACE CENTER, FLA. -- Workers watch as the U.S. Laboratory Destiny, a component of the International Space Station, is lowered into a payload canister for transfer to the Operations and Checkout Buildin... More

KENNEDY SPACE CENTER, Fla. --  A perfect on-time launch for Space Shuttle Discovery at 7:17 p.m. EDT. This marks the 100th launch in the history of the Shuttle program.  Discovery carries a payload that includes the  Integrated Truss Structure Z-1, first of 10  trusses that will form the backbone of the Space Station, and the third Pressurized Mating Adapter that will provide a Shuttle docking port for solar array installation on the sixth Station flight and Lab installation on the seventh Station flight.  Discovery’s landing is expected Oct. 22 at 2:10 p.m. EDT KSC00pp1562

KENNEDY SPACE CENTER, Fla. -- A perfect on-time launch for Space Shut...

KENNEDY SPACE CENTER, Fla. -- A perfect on-time launch for Space Shuttle Discovery at 7:17 p.m. EDT. This marks the 100th launch in the history of the Shuttle program. Discovery carries a payload that include... More

KENNEDY SPACE CENTER, FLA -- In the Operations and Checkout Building (O&C), the U.S. Lab, a component of the International Space Station, sits on a rotation and handling fixture before being raised to vertical. The Lab, named Destiny, will undergo testing in the altitude chamber in the O&C. Destiny is scheduled to fly on mission STS-98 in early 2001. During the mission, the crew will install the Lab in the Space Station during a series of three space walks. The STS-98 mission will provide the Station with science research facilities and expand its power, life support and control capabilities. The U.S. Lab module continues a long tradition of microgravity materials research, first conducted by Skylab and later Shuttle and Spacelab missions. Destiny is expected to be a major feature in future research, providing facilities for biotechnology, fluid physics, combustion, and life sciences research KSC-00pp0834

KENNEDY SPACE CENTER, FLA -- In the Operations and Checkout Building (...

KENNEDY SPACE CENTER, FLA -- In the Operations and Checkout Building (O&C), the U.S. Lab, a component of the International Space Station, sits on a rotation and handling fixture before being raised to vertical.... More

Looking over equipment inside the U.S. Lab Destiny as part of a Multi-Equipment Interface Test are STS-98 Pilot Mark Polansky (left) and Commander Kenneth D. Cockrell (center). They are joined by astronaut James Voss (right), who will be among the first crew to inhabit the International Space Station on a flight in late 2000. During the STS-98 mission, the crew will install the Lab on the station during a series of three space walks. The mission will provide the station with science research facilities and expand its power, life support and control capabilities. The U.S. Laboratory Module continues a long tradition of microgravity materials research, first conducted by Skylab and later Shuttle and Spacelab missions. Destiny is expected to be a major feature in future research, providing facilities for biotechnology, fluid physics, combustion, and life sciences research. Others in the five-member crew on STS-98 are Mission Specialists Robert L. Curbeam Jr., Thomas D. Jones (Ph.D.) and Marsha S. Ivins. The Lab is planned for launch aboard Space Shuttle Atlantis on the sixth ISS flight, currently targeted no earlier than Aug. 19, 2000 KSC-00pp0177

Looking over equipment inside the U.S. Lab Destiny as part of a Multi-...

Looking over equipment inside the U.S. Lab Destiny as part of a Multi-Equipment Interface Test are STS-98 Pilot Mark Polansky (left) and Commander Kenneth D. Cockrell (center). They are joined by astronaut Jame... More

Food Lab - Technician - MSC, NASA Apollo program

Food Lab - Technician - MSC, NASA Apollo program

S70-34848 (11 April 1970) --- Astronaut James A. Lovell Jr., commander for NASA's Apollo 13 mission, undergoes space suit checks a few hours before launch. Other members of the crew are astronauts Fred W. Hais... More

Food Lab - Technician - MSC, NASA Apollo program

Food Lab - Technician - MSC, NASA Apollo program

S70-34854 (11 April 1970) --- The Apollo 13 (Spacecraft 109/Lunar Module 7/Saturn 508) space vehicle is launched from Pad A, Launch Complex 39, Kennedy Space Center (KSC), at 2:13 p.m. (EST), April 11, 1970. T... More

Food Lab - Technician - MSC, NASA Apollo program

Food Lab - Technician - MSC, NASA Apollo program

S70-34853 (11 April 1970) --- The Apollo 13 (Spacecraft 109/Lunar Module 7/Saturn 508) space vehicle is launched from Pad A, Launch Complex 39, Kennedy Space Center (KSC), at 2:13 p.m. (EST), April 11, 1970. T... More

Food Lab - Technician - MSC, NASA Apollo program

Food Lab - Technician - MSC, NASA Apollo program

S70-34847 (11 April 1970) --- Astronaut John L. Swigert Jr., command module pilot for NASA?s third lunar landing mission, appears to be relaxing in the suiting room at Kennedy Space Center prior to launch. Oth... More

Technicians work with Apollo 14 lunar sample material in Lunar Receiving Lab.

Technicians work with Apollo 14 lunar sample material in Lunar Receivi...

S71-19489 (18 Feb. 1971) --- Glove handlers work with freshly opened Apollo 14 lunar sample material in modularized cabinets in the Lunar Receiving Laboratory at the Manned Spacecraft Center. The glove operator... More

LASER BEAM APPARATUS IN CHEMICAL LABORATORY CHEM LAB

LASER BEAM APPARATUS IN CHEMICAL LABORATORY CHEM LAB

The original finding aid described this as: Capture Date: 5/31/1974 Photographer: MARTIN BROWN Keywords: Larsen Scan Location Building No: 6 Photographs Relating to Agency Activities, Facilities and Personnel

LASER BEAM APPARATUS IN CHEMICAL LABORATORY CHEM LAB

LASER BEAM APPARATUS IN CHEMICAL LABORATORY CHEM LAB

The original finding aid described this as: Capture Date: 5/31/1974 Photographer: MARTIN BROWN Keywords: Larsen Scan Location Building No: 6 Photographs Relating to Agency Activities, Facilities and Personnel

LASER BEAM APPARATUS IN CHEMICAL LABORATORY CHEM LAB

LASER BEAM APPARATUS IN CHEMICAL LABORATORY CHEM LAB

The original finding aid described this as: Capture Date: 5/31/1974 Photographer: MARTIN BROWN Keywords: Larsen Scan Location Building No: 6 Photographs Relating to Agency Activities, Facilities and Personnel

LASER BEAM APPARATUS IN CHEMICAL LABORATORY CHEM LAB

LASER BEAM APPARATUS IN CHEMICAL LABORATORY CHEM LAB

The original finding aid described this as: Capture Date: 5/31/1974 Photographer: MARTIN BROWN Keywords: Larsen Scan Location Building No: 6 Photographs Relating to Agency Activities, Facilities and Personnel

LASER BEAM APPARATUS IN CHEMICAL LABORATORY CHEM LAB

LASER BEAM APPARATUS IN CHEMICAL LABORATORY CHEM LAB

The original finding aid described this as: Capture Date: 5/31/1974 Photographer: MARTIN BROWN Keywords: Larsen Scan Location Building No: 6 Photographs Relating to Agency Activities, Facilities and Personnel

LASER BEAM APPARATUS IN CHEMICAL LABORATORY CHEM LAB

LASER BEAM APPARATUS IN CHEMICAL LABORATORY CHEM LAB

The original finding aid described this as: Capture Date: 5/31/1974 Photographer: MARTIN BROWN Keywords: c1974_01900s 1974_01928.jpg Larsen Scan Location Building No: 6 Photographs Relating to Agency Activi... More

KENNEDY SPACE CENTER, FLA. -   Technicians in the Space Station Processing Facility work on a Multi-Element Integrated Test (MEIT) of the U.S. Node 2 and the Japanese Experiment Module (JEM).   Node 2 attaches to the end of the U.S. Lab on the ISS and provides attach locations for the Japanese laboratory, European laboratory, the Centrifuge Accommodation Module and, eventually, Multipurpose Logistics Modules. It will provide the primary docking location for the Shuttle when a pressurized mating adapter is attached to Node 2.  Installation of the module will complete the U.S. Core of the ISS.   The JEM, developed by the National Space Development Agency of Japan (NASDA), is Japan's primary contribution to the Station. It will enhance the unique research capabilities of the orbiting complex by providing an additional environment for astronauts to conduct science experiments.

KENNEDY SPACE CENTER, FLA. - Technicians in the Space Station Proces...

KENNEDY SPACE CENTER, FLA. - Technicians in the Space Station Processing Facility work on a Multi-Element Integrated Test (MEIT) of the U.S. Node 2 and the Japanese Experiment Module (JEM). Node 2 attaches ... More

KENNEDY SPACE CENTER, FLA. - A view of the Space Station Processing Facility shows workstands and ISS elements.   The most recent additions are the Japanese Experiment Module (JEM)’s pressurized module and the Italian-built Node 2.  The pressurized module is the first element of the JEM, Japan’s primary contribution to the Space Station, to be delivered to KSC. It will enhance the unique research capabilities of the orbiting complex by providing an additional shirt-sleeve environment for astronauts to conduct science experiments.  Node 2 will be installed on the end of the U.S. Lab and provides attach locations for the Japanese laboratory, European laboratory, the Centrifuge Accommodation Module and, later, Multipurpose Logistics Modules. It will provide the primary docking location for the Shuttle when a pressurized mating adapter is attached to Node 2.  Installation of the module will complete  the U.S. Core of the ISS.

KENNEDY SPACE CENTER, FLA. - A view of the Space Station Processing Fa...

KENNEDY SPACE CENTER, FLA. - A view of the Space Station Processing Facility shows workstands and ISS elements. The most recent additions are the Japanese Experiment Module (JEM)’s pressurized module and the ... More

LAB BUS, NASA Technology Images

LAB BUS, NASA Technology Images

The original finding aid described this as: Capture Date: 1/28/1975 Photographer: DONALD HUEBLER Keywords: Larsen Scan Photographs Relating to Agency Activities, Facilities and Personnel

Bonnie Dalton with the Viking test module lab ARC-1976-AC76-0564

Bonnie Dalton with the Viking test module lab ARC-1976-AC76-0564

Bonnie Dalton with the Viking test module lab

EYE SURGICAL UNIT IN MET LAB - Public domain NASA photogrpaph

EYE SURGICAL UNIT IN MET LAB - Public domain NASA photogrpaph

The original finding aid described this as: Capture Date: 7/19/1977 Photographer: MARTIN BROWN Keywords: Larsen Scan Location Building No: 14 Photographs Relating to Agency Activities, Facilities and Personnel

SPACE LAB MOCKUP IN THE ZERO GRAVITY FACILITY

SPACE LAB MOCKUP IN THE ZERO GRAVITY FACILITY

The original finding aid described this as: Capture Date: 3/30/1977 Photographer: MARTIN BROWN Keywords: Larsen Scan Location Building No: 110 Photographs Relating to Agency Activities, Facilities and Personnel

SPACE LAB MOCKUP IN THE ZERO GRAVITY FACILITY

SPACE LAB MOCKUP IN THE ZERO GRAVITY FACILITY

The original finding aid described this as: Capture Date: 3/30/1977 Photographer: MARTIN BROWN Keywords: Larsen Scan Location Building No: 110 Photographs Relating to Agency Activities, Facilities and Personnel

EYE SURGICAL UNIT IN MET LAB - Public domain NASA photogrpaph

EYE SURGICAL UNIT IN MET LAB - Public domain NASA photogrpaph

The original finding aid described this as: Capture Date: 7/19/1977 Photographer: MARTIN BROWN Keywords: Larsen Scan Location Building No: 14 Photographs Relating to Agency Activities, Facilities and Personnel

SPACE LAB MODULE DAMAGE, NASA Technology Images

SPACE LAB MODULE DAMAGE, NASA Technology Images

The original finding aid described this as: Capture Date: 3/16/1977 Photographer: J DAVID CLINTON Keywords: Larsen Scan Photographs Relating to Agency Activities, Facilities and Personnel

EYE SURGICAL UNIT IN MET LAB - Public domain NASA photogrpaph

EYE SURGICAL UNIT IN MET LAB - Public domain NASA photogrpaph

The original finding aid described this as: Capture Date: 7/19/1977 Photographer: MARTIN BROWN Keywords: Larsen Scan Location Building No: 14 Photographs Relating to Agency Activities, Facilities and Personnel

SPACE LAB MODULE DAMAGE, NASA Technology Images

SPACE LAB MODULE DAMAGE, NASA Technology Images

The original finding aid described this as: Capture Date: 3/16/1977 Photographer: J DAVID CLINTON Keywords: Larsen Scan Photographs Relating to Agency Activities, Facilities and Personnel

SPACE LAB MOCKUP IN THE ZERO GRAVITY FACILITY

SPACE LAB MOCKUP IN THE ZERO GRAVITY FACILITY

The original finding aid described this as: Capture Date: 3/30/1977 Photographer: MARTIN BROWN Keywords: Larsen Scan Location Building No: 110 Photographs Relating to Agency Activities, Facilities and Personnel

EYE SURGICAL UNIT IN MET LAB - Public domain NASA photogrpaph

EYE SURGICAL UNIT IN MET LAB - Public domain NASA photogrpaph

The original finding aid described this as: Capture Date: 7/19/1977 Photographer: MARTIN BROWN Keywords: Larsen Scan Location Building No: 14 Photographs Relating to Agency Activities, Facilities and Personnel

SPACE LAB MOCKUP IN THE ZERO GRAVITY FACILITY

SPACE LAB MOCKUP IN THE ZERO GRAVITY FACILITY

The original finding aid described this as: Capture Date: 3/30/1977 Photographer: MARTIN BROWN Keywords: Larsen Scan Location Building No: 110 Photographs Relating to Agency Activities, Facilities and Personnel

EYE SURGICAL UNIT IN MET LAB - Public domain NASA photogrpaph

EYE SURGICAL UNIT IN MET LAB - Public domain NASA photogrpaph

The original finding aid described this as: Capture Date: 7/19/1977 Photographer: MARTIN BROWN Keywords: Larsen Scan Location Building No: 14 Photographs Relating to Agency Activities, Facilities and Personnel

EYE SURGICAL UNIT IN MET LAB - Public domain NASA photogrpaph

EYE SURGICAL UNIT IN MET LAB - Public domain NASA photogrpaph

The original finding aid described this as: Capture Date: 7/19/1977 Photographer: MARTIN BROWN Keywords: Larsen Scan Location Building No: 14 Photographs Relating to Agency Activities, Facilities and Personnel

SPACE LAB MOCKUP IN THE ZERO GRAVITY FACILITY

SPACE LAB MOCKUP IN THE ZERO GRAVITY FACILITY

The original finding aid described this as: Capture Date: 3/30/1977 Photographer: MARTIN BROWN Keywords: Larsen Scan Location Building No: 110 Photographs Relating to Agency Activities, Facilities and Personnel

SPACE LAB MOCKUP IN THE ZERO GRAVITY FACILITY

SPACE LAB MOCKUP IN THE ZERO GRAVITY FACILITY

The original finding aid described this as: Capture Date: 3/30/1977 Photographer: MARTIN BROWN Keywords: Larsen Scan Location Building No: 110 Photographs Relating to Agency Activities, Facilities and Personnel

SPACE LAB MOCKUP IN THE ZERO GRAVITY FACILITY

SPACE LAB MOCKUP IN THE ZERO GRAVITY FACILITY

The original finding aid described this as: Capture Date: 3/30/1977 Photographer: MARTIN BROWN Keywords: Larsen Scan Location Building No: 110 Photographs Relating to Agency Activities, Facilities and Personnel

SPACE LAB MOCKUP IN THE ZERO GRAVITY FACILITY

SPACE LAB MOCKUP IN THE ZERO GRAVITY FACILITY

The original finding aid described this as: Capture Date: 3/30/1977 Photographer: MARTIN BROWN Keywords: Larsen Scan Location Building No: 110 Photographs Relating to Agency Activities, Facilities and Personnel

EYE SURGICAL UNIT IN MET LAB - Public domain NASA photogrpaph

EYE SURGICAL UNIT IN MET LAB - Public domain NASA photogrpaph

The original finding aid described this as: Capture Date: 7/19/1977 Photographer: MARTIN BROWN Keywords: Larsen Scan Location Building No: 14 Photographs Relating to Agency Activities, Facilities and Personnel

EYE SURGICAL UNIT IN MET LAB - Public domain NASA photogrpaph

EYE SURGICAL UNIT IN MET LAB - Public domain NASA photogrpaph

The original finding aid described this as: Capture Date: 7/19/1977 Photographer: MARTIN BROWN Keywords: Larsen Scan Location Building No: 14 Photographs Relating to Agency Activities, Facilities and Personnel

SPACE LAB MOCKUP IN THE ZERO GRAVITY FACILITY

SPACE LAB MOCKUP IN THE ZERO GRAVITY FACILITY

The original finding aid described this as: Capture Date: 3/30/1977 Photographer: MARTIN BROWN Keywords: Larsen Scan Location Building No: 110 Photographs Relating to Agency Activities, Facilities and Personnel

SPACE LAB MOCKUP IN THE ZERO GRAVITY FACILITY

SPACE LAB MOCKUP IN THE ZERO GRAVITY FACILITY

The original finding aid described this as: Capture Date: 3/30/1977 Photographer: MARTIN BROWN Keywords: c1977_01100s 1977_01180.jpg Larsen Scan Location Building No: 110 Photographs Relating to Agency Acti... More

SPACE LAB MOCKUP IN THE ZERO GRAVITY FACILITY

SPACE LAB MOCKUP IN THE ZERO GRAVITY FACILITY

The original finding aid described this as: Capture Date: 3/30/1977 Photographer: MARTIN BROWN Keywords: c1977_01100s 1977_01187.jpg Larsen Scan Location Building No: 110 Photographs Relating to Agency Acti... More

SPACE LAB MODULE DAMAGE, NASA Technology Images

SPACE LAB MODULE DAMAGE, NASA Technology Images

The original finding aid described this as: Capture Date: 3/16/1977 Photographer: J DAVID CLINTON Keywords: Larsen Scan Photographs Relating to Agency Activities, Facilities and Personnel

SPACE LAB MOCKUP IN THE ZERO GRAVITY FACILITY

SPACE LAB MOCKUP IN THE ZERO GRAVITY FACILITY

The original finding aid described this as: Capture Date: 3/30/1977 Photographer: MARTIN BROWN Keywords: c1977_01100s 1977_01182.jpg Larsen Scan Location Building No: 110 Photographs Relating to Agency Acti... More

Previous

of 37

Next