bay, sts

4,346 media by topicpage 1 of 44
KENNEDY SPACE CENTER, FLA.  -  In the Vehicle Assembly Building, the external tank designated for Space Shuttle Discovery is lowered into high bay 3. There it will be stacked with the solid rocket boosters already in place on the mobile launcher platform. Discovery is scheduled to launch on mission STS-121 in July.  Photo credit: NASA/Amanda Diller KSC-06pd0725

KENNEDY SPACE CENTER, FLA. - In the Vehicle Assembly Building, the e...

KENNEDY SPACE CENTER, FLA. - In the Vehicle Assembly Building, the external tank designated for Space Shuttle Discovery is lowered into high bay 3. There it will be stacked with the solid rocket boosters alre... More

CAPE CANAVERAL, Fla. -- A canister, carrying the Alpha Magnetic Spectrometer-2 (AMS) and Express Logistics Carrier-3 for space shuttle Endeavour's STS-134 mission, arrives at Launch Pad 39A at NASA's Kennedy Space Center in Florida. Next, crews at the pad will move the payload into the Payload Ground Handling Mechanism (PGHM), and the rotating service structure (RSS) that protects the shuttle from the elements and provides access to its components will be rotated back into place. The payload is scheduled to be installed into the shuttle's cargo bay March 25.      Endeavour and its six-member STS-134 crew are targeted to lift off April 19 at 7:48 p.m. EDT to deliver the payload to the International Space Station. This is Endeavour's final scheduled mission. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Cory Huston KSC-2011-2386

CAPE CANAVERAL, Fla. -- A canister, carrying the Alpha Magnetic Spectr...

CAPE CANAVERAL, Fla. -- A canister, carrying the Alpha Magnetic Spectrometer-2 (AMS) and Express Logistics Carrier-3 for space shuttle Endeavour's STS-134 mission, arrives at Launch Pad 39A at NASA's Kennedy Sp... More

KENNEDY SPACE CENTER, FLA. -  STS-114 Mission Specialist Soichi Noguchi is helped by the Closeout Crew with his launch and entry suit before entering Space Shuttle Discovery.  This is Noguchi’s first Shuttle flight.  He represents the Japan Aerospace Exploration Agency. The Return to Flight mission to the International Space Station carries the External Stowage Platform-2, equipped with spare part assemblies, and a replacement Control Moment Gyroscope contained in the Lightweight Multi-Purpose Experiment Support Structure and Multi-Purpose Logistics Module Raffaello, housing 15 tons of hardware and supplies that will be transferred to the Station after the Shuttle docks to the complex .  On this mission, the crew will perform inspections on-orbit for the first time of all of the Reinforced Carbon-Carbon (RCC) panels on the leading edge of the wings and the Thermal Protection System tiles using the new Canadian-built Orbiter Boom Sensor System and the data from 176 impact and temperature sensors. Mission Specialists will also practice repair techniques on RCC and tile samples during a spacewalk in the payload bay. KSC-05pp1797

KENNEDY SPACE CENTER, FLA. - STS-114 Mission Specialist Soichi Noguch...

KENNEDY SPACE CENTER, FLA. - STS-114 Mission Specialist Soichi Noguchi is helped by the Closeout Crew with his launch and entry suit before entering Space Shuttle Discovery. This is Noguchi’s first Shuttle fl... More

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, space shuttle Endeavour's main engine no. 2 is moved out of Orbiter Processing Bay 2 after removal from the shuttle. Engine removal is part of the post-landing processing. Endeavour returned from the STS-127 mission July 31.  Endeavour's next mission is STS-130 targeted for February 2010.  Endeavour will deliver to the International Space Station the Tranquility pressurized module that will provide room for many of the station's life support systems.  Photo credit: NASA/Jack Pfaller KSC-2009-4706

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, spac...

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, space shuttle Endeavour's main engine no. 2 is moved out of Orbiter Processing Bay 2 after removal from the shuttle. Engine removal is part of t... More

KENNEDY SPACE CENTER, FLA. -- In Space Shuttle Discovery’s payload bay, STS-92 Mission Specialist William S. McArthur Jr. explains something about the Pressurized Mating Adapter in front of him to other Mission Specialists Michael E. Lopez-Alegria and Peter J.K. Wisoff. The STS-92 crew has been inspecting the payload in preparation for launch Oct. 5, 2000. The mission is the fifth flight for the construction of the International Space Station. The payload also includes the Integrated Truss Structure Z-1. During the 11-day mission, four extravehicular activities (EVAs), or space walks, are planned KSC00pp1479

KENNEDY SPACE CENTER, FLA. -- In Space Shuttle Discovery’s payload bay...

KENNEDY SPACE CENTER, FLA. -- In Space Shuttle Discovery’s payload bay, STS-92 Mission Specialist William S. McArthur Jr. explains something about the Pressurized Mating Adapter in front of him to other Mission... More

KENNEDY SPACE CENTER, FLA. -   On Launch Pad 39B, the cargo in Space Shuttle Atlantis' payload bay is seen before the closing of the bay doors.  The cargo is the 17-and-a-half-ton P3/P4 truss segment for the International Space Station. Scheduled to launch Aug. 27, Atlantis will fly on mission STS-115 with a crew of six to deliver and install the P3/P4 segment to the port side of the integrated truss system on the orbital outpost.  The truss includes a new set of photovoltaic solar arrays.  When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years.  STS-115 is expected to last 11 days and includes three scheduled spacewalks.  Photo credit: NASA/Jack Pfaller KSC-06pd1915

KENNEDY SPACE CENTER, FLA. - On Launch Pad 39B, the cargo in Space S...

KENNEDY SPACE CENTER, FLA. - On Launch Pad 39B, the cargo in Space Shuttle Atlantis' payload bay is seen before the closing of the bay doors. The cargo is the 17-and-a-half-ton P3/P4 truss segment for the In... More

CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center cuts away the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller KSC-08pd2076

CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servic...

CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center cuts away the protective wrapping from the Orb... More

KENNEDY SPACE CENTER, FLA. --   The payload canister arrives under the payload changeout room in the rotating service structure on Launch Pad 39B at NASA's Kennedy Space Center.  The canister holds the payloads for mission STS-121: the multi-purpose logistics module Leonardo, with supplies and equipment for the International Space Station; the lightweight multi-purpose experiment support structure carrier; and the integrated cargo carrier, with the mobile transporter reel assembly and a spare pump module. The payload canister will be lifted into the changeout room where the payloads will be transferred to Space Shuttle Discovery's payload bay.  Discovery is scheduled to launch on mission STS-121 from Launch Pad 39B in a window that opens July 1 and extends to July 19. Photo credit: NASA/Kim Shiflett KSC-06pd0851

KENNEDY SPACE CENTER, FLA. -- The payload canister arrives under the...

KENNEDY SPACE CENTER, FLA. -- The payload canister arrives under the payload changeout room in the rotating service structure on Launch Pad 39B at NASA's Kennedy Space Center. The canister holds the payloads... More

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, arcane moves the cover of the shipping container away from its cargo, the Multi-Use Lightweight Equipment (MULE) carrier. The MULE is part of the payload for the fifth and final shuttle servicing mission to NASA's Hubble Space Telescope, STS-125. The MULE carrier will join the Flight Support System, the Super Lightweight Interchangeable Carrier and the Orbital Replacement Unit Carrier in the Payload Hazardous Servicing Facility where the Hubble payload is being prepared for launch. The Relative Navigation Sensors and the New Outer Blanket Layers will be on the MULE. The payload is scheduled to go to Launch Pad 39A in mid-September to be installed into Atlantis' payload bay.  Atlantis is targeted to launch Oct. 8 at 1:34 a.m. EDT. .Photo credit: NASA/Amanda Diller KSC-08pd2298

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at ...

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, arcane moves the cover of the shipping container away from its cargo, the Multi-Use Lightweight Equipment (MULE... More

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, members of space shuttle Endeavour's STS-130 crew put on their launch-and-entry suits before heading to the Astrovan for the ride to Launch Pad 39A. The crew is participating in a dress rehearsal for their upcoming launch, known as the Terminal Countdown Demonstration Test.  Making his second spaceflight on STS-130 is Mission Specialist Robert Behnken, seen here.    The primary payload for the STS-130 mission is the International Space Station's Tranquility node, a pressurized module that will provide room for many of the station's life support systems. Attached to one end of Tranquility is a cupola, a unique work area with six windows on its sides and one on top.  The cupola resembles a circular bay window and will provide a vastly improved view of the station's exterior. The multi-directional view will allow the crew to monitor spacewalks and docking operations, as well as provide a spectacular view of Earth and other celestial objects. The module was built in Turin, Italy, by Thales Alenia Space for the European Space Agency.  Launch of STS-130 is targeted for Feb. 7. For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html.  Photo credit: NASA/Kim Shiflett KSC-2010-1354

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, members of space shuttle Endeavour's STS-130 crew put on their launch-and-entry suits before heading to ... More

In Orbiter Processing Facility bay 3, STS-106 Mission Specialists Yuri I. Malenchenko (left) and Edward T. Lu (beside him) familiarize themselves with equipment in the payload bay of Space Shuttle orbiter Atlantis with the help of KSC employees as part of Crew Equipment Interface Test (CEIT) activities for their mission. The other crew members are Commander Terrence W. Wilcutt, Pilot Scott D. Altman, and Mission Specialists Daniel C. Burbank, Boris V. Morukov and Richard A. Mastracchio. Malenchenko and Morukov represent the Russian Aviation and Space Agency. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module for the first long-duration crew, dubbed "Expedition One," which is due to arrive at the Station in late fall. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B KSC-00pp0995

In Orbiter Processing Facility bay 3, STS-106 Mission Specialists Yuri...

In Orbiter Processing Facility bay 3, STS-106 Mission Specialists Yuri I. Malenchenko (left) and Edward T. Lu (beside him) familiarize themselves with equipment in the payload bay of Space Shuttle orbiter Atlan... More

KENNEDY SPACE CENTER, FLA. -   At Launch Pad 39B, both of Space Shuttle Discovery's payload bay doors are closed for launch.  Inside the payload bay, the cargo includes the multi-purpose logistics module Leonardo and the integrated cargo carrier. Discovery is scheduled to launch on mission STS-121 at 3:49 p.m. July 1 carrying a crew of seven on the 12-day mission to the International Space Station. Photo credit: NASA/Jim Grossmann KSC-06pd1171

KENNEDY SPACE CENTER, FLA. - At Launch Pad 39B, both of Space Shuttl...

KENNEDY SPACE CENTER, FLA. - At Launch Pad 39B, both of Space Shuttle Discovery's payload bay doors are closed for launch. Inside the payload bay, the cargo includes the multi-purpose logistics module Leonar... More

CAPE CANAVERAL, Fla.  –  In the Orbiter Processing Facility bay 2, technicians on the Hyster forklift maneuver main engine 1 for installation on space shuttle Endeavour.  The scheduled launch vehicle for the STS-126 mission, Endeavour will deliver a multi-purpose logistics module to the International Space Station. Launch is targeted for Nov. 10.  Endeavour is also the backup shuttle, if needed for rescue, for the STS-125 mission in October that will make repairs on the Hubble Space Telescope.  For that purpose, it is designated STS-400. Photo credit: NASA/Jim Grossmann KSC-08pd1848

CAPE CANAVERAL, Fla. – In the Orbiter Processing Facility bay 2, tec...

CAPE CANAVERAL, Fla. – In the Orbiter Processing Facility bay 2, technicians on the Hyster forklift maneuver main engine 1 for installation on space shuttle Endeavour. The scheduled launch vehicle for the ST... More

KENNEDY SPACE CENTER, FLA. -- Technicians unload the replacement wrist joint for the Space Station Remote Manipulator System before installing it in Space Shuttle Endeavour's payload bay. The new wrist joint, called an Orbital Replacement Unit (ORU), will be installed next to the arm's Latching End Effector during the final of three planned spacewalks. Mission STS-111 is designated UF-2, the 14th assembly flight to the International Space Station. Endeavour's payload includes the Multi-Purpose Logistics Module Leonardo and Mobile Base System. The mission also will swap resident crews on the Station, carrying the Expedition 5 crew and returning to Earth Expedition 4. Liftoff of Endeavour is scheduled between 4 and 8 p.m. May 30, 2002 KSC-02pd0640

KENNEDY SPACE CENTER, FLA. -- Technicians unload the replacement wrist...

KENNEDY SPACE CENTER, FLA. -- Technicians unload the replacement wrist joint for the Space Station Remote Manipulator System before installing it in Space Shuttle Endeavour's payload bay. The new wrist joint, c... More

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is positioned between the twin solid rocket boosters on the mobile launcher platform in high bay-1. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller KSC-2011-3053

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA'...

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is positioned between the twin s... More

KENNEDY SPACE CENTER, FLA.  - In NASA Kennedy Space Center's Orbiter Processing Facility bay 3, United Space Alliance shuttle technicians remove the hard cover from a window on Space Shuttle Discovery to enable STS-121 crew members to inspect the window from the cockpit.  Launch of Space Shuttle Discovery on mission STS-121, the second return-to-flight mission, is scheduled no earlier than May. KSC-06pd0316

KENNEDY SPACE CENTER, FLA. - In NASA Kennedy Space Center's Orbiter P...

KENNEDY SPACE CENTER, FLA. - In NASA Kennedy Space Center's Orbiter Processing Facility bay 3, United Space Alliance shuttle technicians remove the hard cover from a window on Space Shuttle Discovery to enable... More

CAPE CANAVERAL, Fla. -- The container that carries the Raffaello multi-purpose logistics module (MPLM), secured on its transportation vehicle, begins its journey from the Canister Rotation Facility to Launch Pad 39A at NASA's Kennedy Space Center in Florida. Once there, the canister will be lifted to the payload changeout room. The payload ground-handling mechanism then will be used to transfer Raffaello out of the canister into space shuttle Atlantis' payload bay. Next, the rotating service structure that protects the shuttle from the elements and provides access will be rotated back into place.                Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandra Magnus and Rex Walheim are targeted to lift off on Atlantis July 8, taking with them the MPLM packed with supplies, logistics and spare parts to the station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Frank Michaux KSC-2011-4484

CAPE CANAVERAL, Fla. -- The container that carries the Raffaello multi...

CAPE CANAVERAL, Fla. -- The container that carries the Raffaello multi-purpose logistics module (MPLM), secured on its transportation vehicle, begins its journey from the Canister Rotation Facility to Launch Pa... More

CAPE CANAVERAL, Fla. -- Space shuttle Endeavour is firmly attached to its external fuel tank and solid rocket boosters in a high bay of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. Endeavour is targeted to roll out to Kennedy's Launch Pad 39A for its final mission, STS-134, on March 9. Endeavour and the six-member crew will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank, additional spare parts for the Dextre robotic helper and micrometeoroid debris shields to the International Space Station. Endeavour's final launch is targeted for April 19 at 7:48 p.m. EDT. For more information visit, http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Kim Shiflett KSC-2011-2041

CAPE CANAVERAL, Fla. -- Space shuttle Endeavour is firmly attached to ...

CAPE CANAVERAL, Fla. -- Space shuttle Endeavour is firmly attached to its external fuel tank and solid rocket boosters in a high bay of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. E... More

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA’s Kennedy Space Center, the IMAX 3D camera is lifted from a stand to be installed on the Orbital Replacement Unit Carrier, or ORUC.  The carrier will be installed in space shuttle Atlantis’ payload bay.  The camera will record the STS-125 mission to service the Hubble Space Telescope. Space shuttle Atlantis' 11-day flight is targeted for launch May 12 and will include five spacewalks in which astronauts will refurbish and upgrade the telescope with state-of-the-art science instruments. As a result, Hubble's capabilities will be expanded and its operational lifespan extended through at least 2014.   Photo credit: NASA/Dimitri Gerondidakis KSC-2009-2341

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at ...

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA’s Kennedy Space Center, the IMAX 3D camera is lifted from a stand to be installed on the Orbital Replacement Unit Carrier, or ORUC. Th... More

KENNEDY SPACE CENTER, FLA. - The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT.  Giving a close inspection to space shuttle Discovery in Orbiter Processing Facility bay 3 are Mission Specialist Stephanie D. Wilson and Commander Pamela A. Melroy.  Among the activities standard to a CEIT are harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added.  The STS-120 mission is targeted to launch on Oct. 20.  Photo credit: NASA/George Shelton KSC-07pd2196

KENNEDY SPACE CENTER, FLA. - The STS-120 crew is at Kennedy for a crew...

KENNEDY SPACE CENTER, FLA. - The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT. Giving a close inspection to space shuttle Discovery in Orbiter Processing Facility bay 3 are Mission S... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 3 at NASA's Kennedy Space Center in Florida, members of space shuttle Discovery's STS-131 crew participate in training activities during the Crew Equipment Interface Test, or CEIT, for their mission.  Here, buckets are used to lower the crew members and their trainers into Discovery's payload bay without damaging the bay's lining.    The CEIT provides the crew with hands-on training and observation of shuttle and flight hardware. The seven-member crew will deliver the multi-purpose logistics module Leonardo, filled with resupply stowage platforms and racks to be transferred to locations around the International Space Station.  Three spacewalks will include work to attach a spare ammonia tank assembly to the station's exterior and return a European experiment from outside the station's Columbus module.  Discovery's launch is targeted for March 18.  For information on the STS-131 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts131/index.html.  Photo credit: NASA/Kim Shiflett KSC-2010-1149

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 3 at NASA's Kenn...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 3 at NASA's Kennedy Space Center in Florida, members of space shuttle Discovery's STS-131 crew participate in training activities during the Crew Equipment ... More

Members of the STS-92 crew look over the payload (left) in Space Shuttle Discovery’s payload bay. Left to right, in masks, are Mission Specialists Leroy Chiao, Peter J.K. “Jeff” Wisoff and William S. McArthur Jr. They and the other crew members Commander Brian Duffy, Pilot Pamela Ann Melroy and Mission Specialists Koichi Wakata of Japan, and Michael E. Lopez-Alegria are preparing for launch on Oct. 5, 2000. The mission is the fifth flight for the construction of the International Space Station. The payload includes the Integrated Truss Structure Z-1 and the third Pressurized Mating Adapter. During the 11-day mission, four extravehicular activities (EVAs), or space walks, are planned KSC-00pp1472

Members of the STS-92 crew look over the payload (left) in Space Shutt...

Members of the STS-92 crew look over the payload (left) in Space Shuttle Discovery’s payload bay. Left to right, in masks, are Mission Specialists Leroy Chiao, Peter J.K. “Jeff” Wisoff and William S. McArthur J... More

KENNEDY SPACE CENTER, Fla. --  The payload canister arrives at the Rotating Service Structure (RSS) on Launch Pad 39B. The canister with its cargo of the SPACEHAB module and Integrated Cargo Carrier will be lifted up into the Payload Changeout Room near the top of the RSS for transfer to the payload bay of Shuttle Atlantis for mission STS-106. The PCR provides an environmentally controlled facility for the transfer. The 11-day mission to the International Space Station will include service module support tasks on orbit, transfer supplies and outfit the Space Station for the first long-duration crew. Atlantis is scheduled to launch Sept. 8 at 8:31 a.m. EDT. KSC-00pp1116

KENNEDY SPACE CENTER, Fla. -- The payload canister arrives at the Rot...

KENNEDY SPACE CENTER, Fla. -- The payload canister arrives at the Rotating Service Structure (RSS) on Launch Pad 39B. The canister with its cargo of the SPACEHAB module and Integrated Cargo Carrier will be lif... More

KENNEDY SPACE CENTER, FLA. --  After leaving the Orbiter Processing Facility bay 2,  the orbiter Endeavour, atop its transporter, rolls toward the Vehicle Assembly Building.  In the VAB, it will be stacked with the external tank and solid rocket boosters atop the mobile launcher platform for its launch on mission STS-118. The mission will be Endeavour's first flight in more than four years. The shuttle has undergone extensive modifications, including the addition of safety upgrades already added to shuttles Discovery and Atlantis. Endeavour also features new hardware, such as the Station-to-Shuttle Power Transfer System that will allow the docked shuttle to draw electrical power from the station and extend its visits to the orbiting lab.  Endeavour is targeted for launch on Aug. 7.   Photo credit: NASA/Kim Shiflett KSC-07pd1709

KENNEDY SPACE CENTER, FLA. -- After leaving the Orbiter Processing Fa...

KENNEDY SPACE CENTER, FLA. -- After leaving the Orbiter Processing Facility bay 2, the orbiter Endeavour, atop its transporter, rolls toward the Vehicle Assembly Building. In the VAB, it will be stacked with... More

CAPE CANAVERAL, Fla. –  In the Vehicle Assembly Building transfer aisle at NASA's Kennedy Space Center, the overhead crane lifts space shuttle Atlantis from its transporter.  Atlantis will be raised to vertical for transfer to high bay 3.  There it will be stacked with its external fuel tank and twin solid rocket boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for 1:34 a.m. EDT Oct. 8. Photo credit: NASA/Dimitri Gerondidakis KSC-08pd2487

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building transfer aisl...

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building transfer aisle at NASA's Kennedy Space Center, the overhead crane lifts space shuttle Atlantis from its transporter. Atlantis will be raised to vertical... More

KENNEDY SPACE CENTER, FLA. -   In the Orbiter Processing Facility at NASA's Kennedy Space Center, STS-115 crew members inspect equipment in Atlantis's payload bay.  The crew is at KSC for Crew Equipment Interface Test activities, which involves equipment familiarization,  a routine part of astronaut training and launch preparations.  The STS-115 mission will deliver the second port truss segment, the P3/P4 truss, to the International Space Station.  The crew will attach the P3 to the first port truss segment, the P1 truss, as well as deploy solar array set 2A and 4A.  Launch on Space Shuttle Atlantis is scheduled for late August. Photo credit: NASA/Kim Shiflett KSC-06pd1205

KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility at N...

KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility at NASA's Kennedy Space Center, STS-115 crew members inspect equipment in Atlantis's payload bay. The crew is at KSC for Crew Equipment Interfa... More

KENNEDY SPACE CENTER, FLA. -- Dressed in bunny suits, STS-107 Payload Commander Michael Anderson (left) and 107 Payload Specialist Ilan Ramon (right), who is with the Israeli Space Agency, review data in Columbia's payload bay for the Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR) experiments for the mission. FREESTAR comprises Mediterranean Israeli Dust, Solar Constant, Shuttle Ozone Limb Sounding, Critical Viscosity of Xenon,  Low Power, and Space Experimental Module experiments.  Another payload is the SHI Research Double Module (SHI/RDM), also known as SPACEHAB. The experiments range from material sciences to life sciences.  STS-107 is scheduled to launch July 11, 2002 KSC-02pd0757

KENNEDY SPACE CENTER, FLA. -- Dressed in bunny suits, STS-107 Payload ...

KENNEDY SPACE CENTER, FLA. -- Dressed in bunny suits, STS-107 Payload Commander Michael Anderson (left) and 107 Payload Specialist Ilan Ramon (right), who is with the Israeli Space Agency, review data in Columb... More

KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is turned into position outside the Orbiter Processing Facility (OPF) for its tow to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is tur...

KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is turned into position outside the Orbiter Processing Facility (OPF) for its tow to the Vehicle Assembly Building (VAB). The move will allow work... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, workers are disconnecting and dismantling components on shuttle Endeavour. Seen here is the view from inside the spacecraft's airlock looking toward the payload bay.          The work is part of Endeavour's transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles over the course of its 19-year career. Endeavour's STS-134 and final mission was completed after landing on June 1, 2011. Photo credit: NASA/Kim Shiflett KSC-2011-4911

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, workers are disconnecting and dismantling components on shuttle Endeavour. Seen here is the view from inside t... More

KENNEDY SPACE CENTER, FLA. --  Installed on a transporter, the payload canister moves out of the Vertical Processing Facility.  Inside the canister are the SPACEHAB module and the port 5 truss segment for mission STS-116.  They will be moved into the payload changeout room at the pad and transferred into Space Shuttle Discovery's payload bay once the vehicle has rolled out to the pad. The payload canister is 65 feet long, 18 feet wide and 18 feet, 7 inches high. It has the capability to carry vertically or horizontally processed payloads up to 15 feet in diameter and 60 feet long, matching the capacity of the orbiter payload bay. It can carry payloads weighing up to 65,000 pounds. Clamshell-shaped doors at the top of the canister operate like the orbiter payload bay doors, with the same allowable clearances. Photo credit: NASA/George Shelton KSC-06pd2451

KENNEDY SPACE CENTER, FLA. -- Installed on a transporter, the payload...

KENNEDY SPACE CENTER, FLA. -- Installed on a transporter, the payload canister moves out of the Vertical Processing Facility. Inside the canister are the SPACEHAB module and the port 5 truss segment for missi... More

CAPE CANAVERAL, Fla. –  In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the external fuel tank for space shuttle Atlantis' STS-125 mission is moved out of the checkout cell.  The tank will be lowered into high bay 3 onto the mobile launcher platform and attached to the solid rocket boosters already installed. Atlantis' STS-125 mission is the fifth and final shuttle servicing mission to NASA’s Hubble Space Telescope.  Launch is targeted for May 12.  Photo credit: NASA/Jack Pfaller KSC-2009-1166

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Ken...

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the external fuel tank for space shuttle Atlantis' STS-125 mission is moved out of the checkout cell. The tan... More

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building at NASA's Kennedy Space Center, a crane lifts a frustum high above the transfer aisle.  The solid rocket booster segment is being moved into a high bay where it will be added to the stack being prepared for space shuttle mission STS-122, targeted for launch in December. On this mission, Atlantis will carry the Columbus Laboratory, the European Space Agency's largest contribution to the International Space Station.  Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, also called Harmony, to carry out experiments in materials science, fluid physics and biosciences, as well as to support a number of technological applications. Photo credit: NASA/Jack Pfaller KSC-07pd2847

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building at NASA...

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building at NASA's Kennedy Space Center, a crane lifts a frustum high above the transfer aisle. The solid rocket booster segment is being moved into a high... More

CAPE CANAVERAL, Fla. –  Space shuttle Discovery rolls to the Vehicle Assembly Building at NASA's Kennedy Space Center, Fla. The first motion of the shuttle out from Orbiter Processing Facility 3 was at 7:22 a.m. EDT. In the VAB, Discovery will be lifted into High Bay 1 and mated to the external fuel tank and solid rocket boosters already installed on the mobile launcher platform.  The shuttle is scheduled to roll out to Launch Pad 39A the first week of   August to prepare for the STS-128 mission to the International Space Station.  Discovery will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay.  Launch of Discovery is targeted for late August.  Photo credit: NASA/Kim Shiflett KSC-2009-4241

CAPE CANAVERAL, Fla. – Space shuttle Discovery rolls to the Vehicle A...

CAPE CANAVERAL, Fla. – Space shuttle Discovery rolls to the Vehicle Assembly Building at NASA's Kennedy Space Center, Fla. The first motion of the shuttle out from Orbiter Processing Facility 3 was at 7:22 a.m... More

KENNEDY SPACE CENTER, FLA. --    The payload for mission STS-118 is being installed in the payload bay on Space Shuttle Endeavour on Launch Pad 39A. Seen at center is the SPACEHAB module.   At left and right in the photo are the shuttle robotic arm and the orbiter boom sensor system. The payload also includes the S5 truss and external stowage platform 3. The mission is the 22nd flight to the International Space Station and is targeted for launch on Aug.7.   Photo credit: NASA/Amanda Diller KSC-07pd1860

KENNEDY SPACE CENTER, FLA. -- The payload for mission STS-118 is be...

KENNEDY SPACE CENTER, FLA. -- The payload for mission STS-118 is being installed in the payload bay on Space Shuttle Endeavour on Launch Pad 39A. Seen at center is the SPACEHAB module. At left and right in... More

KENNEDY SPACE CENTER, FLA. -  In NASA Kennedy Space Center’s Orbiter Processing Facility Bay 3, technicians install a remote manipulator system, or space shuttle arm, previously installed on the orbiter Atlantis, in Discovery’s payload bay.  The arms were switched because the arm that was installed on Atlantis has special instrumentation to gather loads data from the second return-to-flight mission, STS-121.  Discovery is the designated orbiter to fly on STS-121. scheduled to launch no earlier than May 2006. KSC-05pd2490

KENNEDY SPACE CENTER, FLA. - In NASA Kennedy Space Center’s Orbiter P...

KENNEDY SPACE CENTER, FLA. - In NASA Kennedy Space Center’s Orbiter Processing Facility Bay 3, technicians install a remote manipulator system, or space shuttle arm, previously installed on the orbiter Atlanti... More

CAPE CANAVERAL, Fla. –  After moving out of high bay 1 in the Vehicle Assembly Building at NASA's Kennedy Space Center, space shuttle Atlantis' external fuel tank-solid rocket booster stack, atop a mobile launcher platform, rolls into high bay 3.  The move makes room in high bay 1 for the ET-SRB stack for space shuttle Endeavour.  Atlantis is targeted for launch on the STS-125 mission on May 12 to service NASA's Hubble Space Telescope.  Endeavour will fly on the STS-127 mission to the International Space Station and bring the final segments for Japan's Kibo laboratory. Photo credit: NASA/Dimitri Gerondidakis KSC-2009-1525

CAPE CANAVERAL, Fla. – After moving out of high bay 1 in the Vehicle ...

CAPE CANAVERAL, Fla. – After moving out of high bay 1 in the Vehicle Assembly Building at NASA's Kennedy Space Center, space shuttle Atlantis' external fuel tank-solid rocket booster stack, atop a mobile launc... More

KENNEDY SPACE CENTER, FLA. -   After its overnight rollout from the Vehicle Assembly Building, Space Shuttle Atlantis rests on the hard stand on Launch Pad 39B.   The shuttle sits on top of the mobile launcher platform.  The crawler, which transported it, is still underneath.  To the left is the rotating service structure, with the payload changeout room (PCR) open.  When the shuttle's payload is transported to the pad, it will be lifted into the PCR, the service structure will rotate to enclose the shuttle and the payload will be installed in Atlantis' payload bay.  The slow speed of the crawler results in a 6-hour trek to the pad approximately 4 miles away.  Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.   Photo credit: NASA/Troy Cryder KSC-06pd1713

KENNEDY SPACE CENTER, FLA. - After its overnight rollout from the Ve...

KENNEDY SPACE CENTER, FLA. - After its overnight rollout from the Vehicle Assembly Building, Space Shuttle Atlantis rests on the hard stand on Launch Pad 39B. The shuttle sits on top of the mobile launcher ... More

KENNEDY SPACE CENTER, FLA. -   Viewed from a camera in the midst of Florida greenery across the marshy water, Space Shuttle Discovery leaps through billows of smoke and steam on Launch Pad 39B on the historic Return to Flight mission STS-114.  Liftoff occurred at 10:39 a.m. EDT. This is the 114th Space Shuttle flight and the 31st for Discovery.  The 12-day mission is expected to end with touchdown at the Shuttle Landing Facility on Aug. 7.  On this mission to the International Space Station the crew will perform inspections on-orbit for the first time of all of the Reinforced Carbon-Carbon (RCC) panels on the leading edge of the wings and the Thermal Protection System tiles using the new Canadian-built Orbiter Boom Sensor System and the data from 176 impact and temperature sensors. Mission Specialists will also practice repair techniques on RCC and tile samples during a spacewalk in the payload bay.  During two additional spacewalks, the crew will install the External Stowage Platform-2, equipped with spare part assemblies, and a replacement Control Moment Gyroscope contained in the Lightweight Multi-Purpose Experiment Support Structure. KSC-05pp1779

KENNEDY SPACE CENTER, FLA. - Viewed from a camera in the midst of Fl...

KENNEDY SPACE CENTER, FLA. - Viewed from a camera in the midst of Florida greenery across the marshy water, Space Shuttle Discovery leaps through billows of smoke and steam on Launch Pad 39B on the historic R... More

KENNEDY SPACE CENTER, FLA. -- In the Payload Changeout Room (part of the Rotation Service Structure at the launch pad), the doors of the payload canister open to reveal its cargo, the SPACEHAB module (bottom) and Unpressurized Cargo Pallet (top).  The payload will be transferred from this environmentally controlled room into the payload bay of Shuttle Atlantis for mission STS-106.  The 11-day mission to the International Space Station will include service module support tasks on orbit, transfer supplies and outfit the Space Station for the first long-duration crew.  Atlantis is scheduled to launch Sept. 8 at 8:30 a.m. EDT. KSC-00pp1126

KENNEDY SPACE CENTER, FLA. -- In the Payload Changeout Room (part of t...

KENNEDY SPACE CENTER, FLA. -- In the Payload Changeout Room (part of the Rotation Service Structure at the launch pad), the doors of the payload canister open to reveal its cargo, the SPACEHAB module (bottom) a... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, workers are disconnecting and dismantling components on shuttle Endeavour. Seen here is the spacecraft's docking port in the payload bay.    The work is part of Endeavour's transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles over the course of its 19-year career. Endeavour's STS-134 and final mission was completed after landing on June 1, 2011. Photo credit: NASA/Kim Shiflett KSC-2011-4918

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, workers are disconnecting and dismantling components on shuttle Endeavour. Seen here is the spacecraft's docki... More

KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility bay 1, members of the STS-92 crew examine equipment that will be part of their mission to the International Space Station (ISS). The fourth U.S. flight to the ISS, the mission payload includes the Integrated Truss Structure Z1, an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power; Ku-band communication to support early science capability and U.S. television; and PMA-3 to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. The crew comprises Mission Commander Brian Duffy, Pilot Pamela Melroy, and Mission Specialists Koichi Wakata, Leroy Chiao, Peter "Jeff" Wisoff, Michael Lopez-Alegria, and William McArthur. Launch of STS-92 is scheduled for Sept. 21, 2000. Wakata is with the National Space Development Agency of Japan KSC00pp0522

KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility bay 1...

KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility bay 1, members of the STS-92 crew examine equipment that will be part of their mission to the International Space Station (ISS). The fourth U.S. ... More

KENNEDY SPACE CENTER, FLA. -   After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure.  The rollback was in preparation for launch July 1 on mission STS-121.  Extending toward the cockpit of the shuttle is the orbiter access arm with the White Room extended.  The White Room provides access into the orbiter for the astronauts.  The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench. The hinge column rests on the pad surface and is braced to the fixed service structure. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks that move along circular twin rails installed flush with the pad surface. The track crosses the flame trench on a permanent bridge.  The RSS is 102 feet long, 50 feet wide and 130 feet high. The structure has orbiter access platforms at five levels to provide access to the payload bay while the orbiter is being serviced in the RSS. Each platform has independent extendable planks that can be arranged to conform to a payload's configuration.  This mission is the 115th shuttle flight and the 18th U.S. flight to the International Space Station. Photo credit: NASA/Kim Shiflett KSC-06pd1308

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service ...

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure. The rollback w... More

KENNEDY SPACE CENTER, FLA. --  In NASA's Vehicle Assembly Building, orbiter Discovery is in place on the mobile launcher platform after being lowered into high bay 3 for mating with its external tank and solid rocket boosters.  Space Shuttle Discovery is expected to roll out to Launch Pad 39B later this week via the crawler-transporter.  Launch of Discovery on mission STS-121 is scheduled to take place in a window extending July 1 to July 19. Photo credit: NASA/Jim Grossmann KSC-06pd0833

KENNEDY SPACE CENTER, FLA. -- In NASA's Vehicle Assembly Building, or...

KENNEDY SPACE CENTER, FLA. -- In NASA's Vehicle Assembly Building, orbiter Discovery is in place on the mobile launcher platform after being lowered into high bay 3 for mating with its external tank and solid ... More

KENNEDY SPACE CENTER, FLA. --  In the transfer aisle of the Vehicle Assembly Building, external tank No. 125 is raised off its transporter.  The tank will be raised to a vertical position and then lifted into a checkout cell in high bay 4 to allow for processing. The tank will be part of the space shuttle stack for mission STS-122 targeted to launch Dec. 6.  Photo credit: NASA/Troy Cryder KSC-07pd2473

KENNEDY SPACE CENTER, FLA. -- In the transfer aisle of the Vehicle As...

KENNEDY SPACE CENTER, FLA. -- In the transfer aisle of the Vehicle Assembly Building, external tank No. 125 is raised off its transporter. The tank will be raised to a vertical position and then lifted into a... More

KENNEDY SPACE CENTER, FLA. -- In high bay 3 of the Vehicle Assembly Building at NASA's Kennedy Space Center, space shuttle Atlantis is lowered alongside the external tank and solid rocket boosters waiting below, already secured atop the mobile launcher platform.  On this mission, Atlantis will deliver the Columbus module to the International Space Station. The European Space Agency's largest contribution to the station, Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony. The module is approximately 23 feet long and 15 feet wide, allowing it to hold 10 large racks of experiments. The laboratory will expand the research facilities aboard the station, providing crew members and scientists from around the world the ability to conduct a variety of experiments in the physical, materials and life sciences. Mission STS-122 is targeted for launch on Dec. 6.  Photo credit: NASA/George Shelton KSC-07pd3099

KENNEDY SPACE CENTER, FLA. -- In high bay 3 of the Vehicle Assembly Bu...

KENNEDY SPACE CENTER, FLA. -- In high bay 3 of the Vehicle Assembly Building at NASA's Kennedy Space Center, space shuttle Atlantis is lowered alongside the external tank and solid rocket boosters waiting below... More

KENNEDY SPACE CENTER, FLA. - As the orbiter Discovery, sitting on an orbiter transporter, moves away from NASA's Orbiter Processing Facility toward the Vehicle Assembly Building (VAB), workers accompany the vehicle.  The rollover to the VAB marks the start of the journey to the launch pad and, ultimately, launch.  Once inside the VAB, Discovery will be raised to vertical and lifted up and over into high bay 3 for stacking with its redesigned external tank and twin solid rocket boosters.  The rollout of Space Shuttle Discovery to Launch Pad 39B is expected in approximately a week.  Launch of Discovery on mission STS-121 is scheduled to take place in a window extending July 1 to July 19. Photo credit: NASA/Jim Grossmann KSC-06pd0818

KENNEDY SPACE CENTER, FLA. - As the orbiter Discovery, sitting on an o...

KENNEDY SPACE CENTER, FLA. - As the orbiter Discovery, sitting on an orbiter transporter, moves away from NASA's Orbiter Processing Facility toward the Vehicle Assembly Building (VAB), workers accompany the veh... More

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, members of space shuttle Endeavour's STS-130 crew put on their launch-and-entry suits before heading to the Astrovan for the ride to Launch Pad 39A. The crew is participating in a dress rehearsal for their upcoming launch, known as the Terminal Countdown Demonstration Test.  Making his second spaceflight on STS-130 is Mission Specialist Nicholas Patrick, seen here in his helmet.    The primary payload for the STS-130 mission is the International Space Station's Tranquility node, a pressurized module that will provide room for many of the station's life support systems. Attached to one end of Tranquility is a cupola, a unique work area with six windows on its sides and one on top.  The cupola resembles a circular bay window and will provide a vastly improved view of the station's exterior. The multi-directional view will allow the crew to monitor spacewalks and docking operations, as well as provide a spectacular view of Earth and other celestial objects. The module was built in Turin, Italy, by Thales Alenia Space for the European Space Agency.  Launch of STS-130 is targeted for Feb. 7. For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html.  Photo credit: NASA/Kim Shiflett KSC-2010-1358

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, members of space shuttle Endeavour's STS-130 crew put on their launch-and-entry suits before heading to ... More

CAPE CANAVERAL, Fla. - At the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, workers prepare to roll the transportation case protecting the Russian-built Mini Research Module1, or MRM1, from the cargo bay of a Volga-Dnepr Antonov AN-124-100, a Ukranian/Russian aircraft.    The second in a series of new pressurized components for Russia, the module, named Rassvet, will be permanently attached to the International Space Station's Zarya module on space shuttle Atlantis' STS-132 mission. An Integrated Cargo Carrier will join the MRM in Atlantis' payload bay. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock, and European robotic arm for the Russian Multi-purpose Laboratory Module also will be delivered to the station.  Launch is targeted for May 14, 2010.  Photo credit: NASA/Jack Pfaller KSC-2009-6857

CAPE CANAVERAL, Fla. - At the Shuttle Landing Facility at NASA's Kenne...

CAPE CANAVERAL, Fla. - At the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, workers prepare to roll the transportation case protecting the Russian-built Mini Research Module1, or MRM1, fro... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 1 at NASA's Kennedy Space Center, space shuttle Atlantis' payload bay has been thoroughly cleaned and is ready to receive the carriers transporting the instruments and equipment needed to service the Hubble Space Telescope.  Atlantis is targeted to launch Oct. 8 on the STS-125 mission to service Hubble. The mission crew will perform history-making, on-orbit “surgery” on two important science instruments aboard the telescope. After capturing the telescope, two teams of spacewalking astronauts will perform the repairs during five planned spacewalks. Photo credit: NASA/Jack Pfaller KSC-08pd2122

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 1 at NASA's Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 1 at NASA's Kennedy Space Center, space shuttle Atlantis' payload bay has been thoroughly cleaned and is ready to receive the carriers transporting the inst... More

CAPE CANAVERAL, Fla. -- At Launch Pad 39A at NASA's Kennedy Space Center in Florida, space shuttle Atlantis' STS-135 crew members take part in a payload bay walkdown to check out the cargo secured in Atlantis' bay. Seen here inspecting the airlock is Commander Chris Ferguson.        The astronauts are at Kennedy to participate in a launch countdown dress rehearsal called the Terminal Countdown Demonstration Test (TCDT) and related training. Atlantis and its crew are targeted to lift off July 8, taking with them the Raffaello multi-purpose logistics module packed with supplies and spare parts to the International Space Station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett KSC-2011-4736

CAPE CANAVERAL, Fla. -- At Launch Pad 39A at NASA's Kennedy Space Cent...

CAPE CANAVERAL, Fla. -- At Launch Pad 39A at NASA's Kennedy Space Center in Florida, space shuttle Atlantis' STS-135 crew members take part in a payload bay walkdown to check out the cargo secured in Atlantis' ... More

CAPE CANAVERAL, Fla. –  In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers check the attachments on the ground support equipment for the STS-125 Hubble Servicing Mission as it is transferred to a work stand.  The GSE are carriers, or pallets, that will hold equipment in space shuttle Atlantis’ payload bay.  Under the protective covering of the carrier can be seen the soft capture mechanism. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the servicing mission.  The three payload carriers or pallets are the Flight Support System, the Super Lightweight Interchangeable Carrier and the Orbital Replacement Unit Carrier.  At the end of July, a fourth and final carrier, the Multi-Use Lightweight Equipment carrier will join the others in the Payload Hazardous Servicing Facility where the Hubble payload is being prepared for launch. Photo credit: NASA/Cory Huston KSC-08pd2010

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at...

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers check the attachments on the ground support equipment for the STS-125 Hubble Servicing Mission as it i... More

A close-up view of Space Shuttle Discovery's tail section is featured in this image photographed by an Expedition 13 crew member on the International Space Station (ISS) during the STS-121 Rotating Pitch Maneuver (RPM) survey. Visible are the space shuttle's main engines (SSME), vertical stabilizer, orbital maneuvering system (OMS) pods and a portion of the aft cargo bay and wings. The Marshall Space Flight Center (MSFC) has management responsibility for development of the SSME. n/a

A close-up view of Space Shuttle Discovery's tail section is featured ...

A close-up view of Space Shuttle Discovery's tail section is featured in this image photographed by an Expedition 13 crew member on the International Space Station (ISS) during the STS-121 Rotating Pitch Maneuv... More

KENNEDY SPACE CENTER, FLA. -- Sitting atop the Mobile Launcher Platform, Space Shuttle Atlantis inches its way to the launch pad.  The Shuttle and MLP rest on top of the crawler-transporter beneath it, which moves about 1 mile per hour. Atlantis is scheduled for launch April 4 on mission STS-110, which will install the S0 truss, the framework that eventually will hold the power and cooling systems needed for future international research laboratories on the International Space Station.  The  Canadarm2 robotic arm will be used exclusively to hoist the 13-ton truss from the payload bay to the Station.  The S0 truss will be the first major U.S. component launched to the Station since the addition of the Quest airlock in July 2001.  The four spacewalks planned for the construction will all originate from the airlock.  The mission will be Atlantis' 25th trip to space KSC-02pd0275

KENNEDY SPACE CENTER, FLA. -- Sitting atop the Mobile Launcher Platfor...

KENNEDY SPACE CENTER, FLA. -- Sitting atop the Mobile Launcher Platform, Space Shuttle Atlantis inches its way to the launch pad. The Shuttle and MLP rest on top of the crawler-transporter beneath it, which mo... More

CAPE CANAVERAL, Fla. –  In the Orbiter Processing Facility at NASA's Kennedy Space Center, STS-125 Mission Specialist Michael Good checks out part of the equipment in space shuttle Atlantis' payload bay.  Equipment familiarization is part of the crew equipment interface test, which provides hands-on experience with hardware and equipment for the mission.  Atlantis is targeted to launch Oct. 8 on the STS-125 mission to service the Hubble Space Telescope. The mission crew will perform history-making, on-orbit “surgery” on two important science instruments aboard the telescope.  After capturing the telescope, two teams of spacewalking astronauts will perform the repairs during five planned spacewalks.    Photo credit: NASA/Kim Shiflett KSC-08pd1957

CAPE CANAVERAL, Fla. – In the Orbiter Processing Facility at NASA's K...

CAPE CANAVERAL, Fla. – In the Orbiter Processing Facility at NASA's Kennedy Space Center, STS-125 Mission Specialist Michael Good checks out part of the equipment in space shuttle Atlantis' payload bay. Equip... More

CAPE CANAVERAL, Fla. – In High Bay 1 in the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, space shuttle Endeavour hovers over the mobile launcher platform to which its external fuel tank and solid rocket boosters are secured.  Next, Endeavour will be attached to the tank to complete the shuttle stack.    Rollout of the stack to Kennedy’s Launch Pad 39A, a significant milestone in launch processing activities, is planned for early January 2010. The Italian-built Tranquility module, the primary payload for Endeavour's STS-130 mission, will be installed in the payload bay after the shuttle arrives at the pad.  Launch is targeted for early February. For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html.  Photo credit: NASA/Jack Pfaller KSC-2009-6777

CAPE CANAVERAL, Fla. – In High Bay 1 in the Vehicle Assembly Building ...

CAPE CANAVERAL, Fla. – In High Bay 1 in the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, space shuttle Endeavour hovers over the mobile launcher platform to which its external fuel tank ... More

CAPE CANAVERAL, Fla. - In the Payload Changeout Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, members of the STS-129 crew, dressed in clean-room attire known as "bunny suits," pause a moment during their payload familiarization training for a photo. From left are Mission Specialists Robert L. Satcher Jr. and Leland Melvin.    The training affords the crew an opportunity to observe the placement of the Express Logistics Carriers 1 and 2 in space shuttle Atlantis' payload bay before launch.  The six astronauts for space shuttle Atlantis’ STS-129 mission came to Kennedy to participate in their launch dress rehearsal, the Terminal Countdown Demonstration Test.  Additional training associated with the test was done last month, but the simulated countdown was postponed because of a scheduling conflict with the launch of NASA’s Ares I-X test rocket.  Launch of Atlantis on its STS-129 mission to the International Space Station is set for Nov. 16.  On STS-129, the crew will deliver to the station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  For information on the STS-129 crew and mission objectives, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-6105

CAPE CANAVERAL, Fla. - In the Payload Changeout Room on Launch Pad 39A...

CAPE CANAVERAL, Fla. - In the Payload Changeout Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, members of the STS-129 crew, dressed in clean-room attire known as "bunny suits," pause a moment... More

In the Space Station Processing Facility, workers help guide the Multi-Purpose Logistics Module Donatello as it moves the length of the SSPF toward a workstand. In the SSPF, Donatello will undergo processing by the payload test team, including integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle’s payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo. Donatello will be launched on mission STS-130, currently planned for September 2004 KSC-01pp0247

In the Space Station Processing Facility, workers help guide the Multi...

In the Space Station Processing Facility, workers help guide the Multi-Purpose Logistics Module Donatello as it moves the length of the SSPF toward a workstand. In the SSPF, Donatello will undergo processing by... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, technicians in the payload changeout room have maneuvered space shuttle Atlantis' cargo, the Raffaello multi-purpose logistics module (MPLM) into the shuttle's payload bay using the payload ground-handling mechanism at Launch Pad 39A. The rotating service structure that protects the shuttle from the elements and provides access has been moved back into place.              STS-135 Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandy Magnus and Rex Walheim are targeted to lift off on Atlantis July 8, taking with them the MPLM packed with supplies, logistics and spare parts to the station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett KSC-2011-4598

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, tec...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, technicians in the payload changeout room have maneuvered space shuttle Atlantis' cargo, the Raffaello multi-purpose logistics module (MPLM) in... More

KENNEDY SPACE CENTER, FLA.  -   In the transfer aisle of the Vehicle Assembly Building, an overhead crane and sling raise Atlantis off its transporter in preparation for lifting it to a vertical position.  Atlantis then will be lifted into high bay 3 for stacking with the external tank and solid rocket boosters already installed on the mobile launcher platform. After mating with the external tank and boosters, Atlantis will undergo a shuttle interface test and other prelaunch processing.  Atlantis' launch window begins Aug. 28. During its 11-day mission to the International Space Station, the STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.  Photo credit: NASA/Kim Shiflett KSC-06pd1657

KENNEDY SPACE CENTER, FLA. - In the transfer aisle of the Vehicle A...

KENNEDY SPACE CENTER, FLA. - In the transfer aisle of the Vehicle Assembly Building, an overhead crane and sling raise Atlantis off its transporter in preparation for lifting it to a vertical position. Atla... More

KENNEDY SPACE CENTER, FLA. -- In high bay 3 of the Vehicle Assembly Building at NASA's Kennedy Space Center, space shuttle Atlantis is lowered toward the external tank and solid rocket boosters waiting below, already secured atop the mobile launcher platform.  On this mission, Atlantis will deliver the Columbus module to the International Space Station. The European Space Agency's largest contribution to the station, Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony. The module is approximately 23 feet long and 15 feet wide, allowing it to hold 10 large racks of experiments. The laboratory will expand the research facilities aboard the station, providing crew members and scientists from around the world the ability to conduct a variety of experiments in the physical, materials and life sciences. Mission STS-122 is targeted for launch on Dec. 6.  Photo credit: NASA/George Shelton KSC-07pd3097

KENNEDY SPACE CENTER, FLA. -- In high bay 3 of the Vehicle Assembly Bu...

KENNEDY SPACE CENTER, FLA. -- In high bay 3 of the Vehicle Assembly Building at NASA's Kennedy Space Center, space shuttle Atlantis is lowered toward the external tank and solid rocket boosters waiting below, a... More

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, members of space shuttle Endeavour's STS-130 crew put on their launch-and-entry suits before heading to the Astrovan for the ride to Launch Pad 39A. The crew is participating in a dress rehearsal for their upcoming launch, known as the Terminal Countdown Demonstration Test.  Making his first spaceflight on STS-130 is Pilot Terry Virts, seen here in his helmet.    The primary payload for the STS-130 mission is the International Space Station's Tranquility node, a pressurized module that will provide room for many of the station's life support systems. Attached to one end of Tranquility is a cupola, a unique work area with six windows on its sides and one on top.  The cupola resembles a circular bay window and will provide a vastly improved view of the station's exterior. The multi-directional view will allow the crew to monitor spacewalks and docking operations, as well as provide a spectacular view of Earth and other celestial objects. The module was built in Turin, Italy, by Thales Alenia Space for the European Space Agency.  Launch of STS-130 is targeted for Feb. 7. For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html.  Photo credit: NASA/Kim Shiflett KSC-2010-1363

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, members of space shuttle Endeavour's STS-130 crew put on their launch-and-entry suits before heading to ... More

KENNEDY SPACE CENTER, FLA. --   United Space Alliance technician Larry Tanner makes a fit check on the piece of gap filler to be installed on the orbiter Discovery, which is being processed in Orbiter Processing Facility Bay 3 at NASA’s Kennedy Space Center.  This work is being performed due to two gap fillers that were protruding from the underside of Discovery on the first Return to Flight mission, STS-114. New installation procedures have been developed to ensure the gap fillers stay in place and do not pose any hazard during the shuttle's re-entry to the atmosphere. Discovery is the scheduled orbiter for the second space shuttle mission in the return-to-flight sequence. KSC-05pd2596

KENNEDY SPACE CENTER, FLA. -- United Space Alliance technician Larry...

KENNEDY SPACE CENTER, FLA. -- United Space Alliance technician Larry Tanner makes a fit check on the piece of gap filler to be installed on the orbiter Discovery, which is being processed in Orbiter Processin... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility bay 3 at NASA's Kennedy Space Center in Florida, (at left) one of three space shuttle main engines is being prepared for installation in space shuttle Discovery.  Each engine is 14 feet long, weighs about 6,700 pounds, and is 7.5 feet in diameter at the end of the nozzle. Discovery is being processed for its next mission, STS-119, targeted for launch on Feb. 12, 2009. Discovery and its crew will deliver integrated truss structure 6 (S6) and solar arrays to the International Space Station. Photo credit: NASA/Dimitri Gerondidakis KSC-08pd2943

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility bay 3 at NASA's ...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility bay 3 at NASA's Kennedy Space Center in Florida, (at left) one of three space shuttle main engines is being prepared for installation in space shuttle Disco... More

KENNEDY SPACE CENTER, FLA. -   After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure.  The rollback was in preparation for launch July 1 on mission STS-121.  Extending toward the cockpit of the shuttle is the orbiter access arm with the White Room extended.  The White Room provides access into the orbiter for the astronauts.  The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench. The hinge column rests on the pad surface and is braced to the fixed service structure. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks that move along circular twin rails installed flush with the pad surface. The track crosses the flame trench on a permanent bridge.  The RSS is 102 feet long, 50 feet wide and 130 feet high. The structure has orbiter access platforms at five levels to provide access to the payload bay while the orbiter is being serviced in the RSS. Each platform has independent extendable planks that can be arranged to conform to a payload's configuration.  This mission is the 115th shuttle flight and the 18th U.S. flight to the International Space Station. Photo credit: NASA/Kim Shiflett KSC-06pd1307

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service ...

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure. The rollback w... More

KENNEDY SPACE CENTER, FLA. -- Cameras are prepared to record the launch of Space Shuttle Atlantis from Launch Pad 39A following sunrise on a cloudy Florida day. Rollback of the pad's rotating service structure, or RSS, is one of the milestones in preparation for the launch of mission STS-117 on June 8. Rollback started at 10:56 p.m. EDT June 7 and was complete at 11:34 p.m. The RSS, the massive structure to the left of the shuttle, provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the side of the pad's flame trench. The hinge column rests on the pad surface and is braced to the fixed service structure. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks that move along circular twin rails installed flush with the pad surface. The track crosses the flame trench on a permanent bridge. The RSS is 102 feet long, 50 feet wide and 130 feet high. The structure has orbiter access platforms at five levels to provide access to the payload bay while the orbiter is being serviced in the RSS. Each platform has independent extendable planks that can be arranged to conform to a payload's configuration. This mission is the 118th shuttle flight and the 21st U.S. flight to the International Space Station and will deliver and install the S3/S4 truss segment, deploy a set of solar arrays and prepare them for operation. Photo credit: NASA/Ken Thornsley KSC-07pd1399

KENNEDY SPACE CENTER, FLA. -- Cameras are prepared to record the launc...

KENNEDY SPACE CENTER, FLA. -- Cameras are prepared to record the launch of Space Shuttle Atlantis from Launch Pad 39A following sunrise on a cloudy Florida day. Rollback of the pad's rotating service structure,... More

KENNEDY SPACE CENTER, FLA. --  In the Space Station Processing Facility, the P5 truss for mission STS-116 is lowered into the payload canister.  The canister will transport the truss to Launch Pad 39B where it will wait for installation in Space Shuttle Discovery’s payload bay. The third port truss segment, the P5 will be attached to the P3/P4 truss on the International Space Station during the 11-day mission. The window for launch of mission STS-116 opens Dec. 7.   Photo credit: NASA/George Shelton KSC-06pd2409

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facilit...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, the P5 truss for mission STS-116 is lowered into the payload canister. The canister will transport the truss to Launch Pad 39B where it ... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's Kennedy Space Center in Florida, a crane lifts the gaseous nitrogen tank from space shuttle Discovery's payload bay with the aid of a "fish pole" lifting fixture.  The tank is being removed during processing for the shuttle's STS-131 mission to the International Space Station.    The tanks are used for atmosphere conditioning and for moving potable water in the crew module.  The seven-member STS-131 crew will deliver a Multi-Purpose Logistics Module filled with science racks to be transferred to laboratories on the station.  Three spacewalks will include work to attach a spare ammonia tank assembly to the station's exterior and return a European experiment from outside the station's Columbus module. This will be the 33rd shuttle mission to the station. Launch is targeted for March 18, 2010.  Photo credit: NASA/Troy Cryder KSC-2009-6101

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's ...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's Kennedy Space Center in Florida, a crane lifts the gaseous nitrogen tank from space shuttle Discovery's payload bay with the aid of a "fish ... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 3 at NASA's Kennedy Space Center in Florida, members of space shuttle Discovery's STS-131 crew participate in training activities during the Crew Equipment Interface Test, or CEIT, for their mission.  Here, Mission Specialists Rick Mastracchio, left, and Clay Anderson review the placement of the hardware in Discovery's payload bay.    The CEIT provides the crew with hands-on training and observation of shuttle and flight hardware. The seven-member crew will deliver the multi-purpose logistics module Leonardo, filled with resupply stowage platforms and racks to be transferred to locations around the International Space Station.  Three spacewalks will include work to attach a spare ammonia tank assembly to the station's exterior and return a European experiment from outside the station's Columbus module.  Discovery's launch is targeted for March 18.  For information on the STS-131 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts131/index.html.  Photo credit: NASA/Kim Shiflett KSC-2010-1143

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 3 at NASA's Kenn...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 3 at NASA's Kennedy Space Center in Florida, members of space shuttle Discovery's STS-131 crew participate in training activities during the Crew Equipment ... More

Catching the glow of the late afternoon sun, the Shuttle Carrier Aircraft (SCA) rolls down the runway at the Shuttle Landing Facility as it returns the orbiter Discovery to KSC. The ferry flight started in California after the orbiter’s landing more than a week ago at Edwards Air Force Base at the end of mission STS-92. Discovery wears a tail cone protecting its aft nozzles for the ferry flight. Discovery will be demated from the SCA via the mate/demate device at the SLF and transported to the Orbiter Processing Facility bay 1. There it will undergo preparations for its next launch, STS-102, scheduled for February 2001 KSC00padig080

Catching the glow of the late afternoon sun, the Shuttle Carrier Aircr...

Catching the glow of the late afternoon sun, the Shuttle Carrier Aircraft (SCA) rolls down the runway at the Shuttle Landing Facility as it returns the orbiter Discovery to KSC. The ferry flight started in Cali... More

KENNEDY SPACE CENTER, FLA. -- Works at Launch Pad 39A begin closing the payload bay doors on Space Shuttle Atlantis. The payload includes the SPACEHAB Double Module (center) and two GetAway Special (GAS) canisters containing student experiments, known as MARS and SEM-06. The primary mission of STS-101 is to deliver logistics and supplies to the International Space Station, plus prepare the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. The crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A KSC-00pp0495

KENNEDY SPACE CENTER, FLA. -- Works at Launch Pad 39A begin closing th...

KENNEDY SPACE CENTER, FLA. -- Works at Launch Pad 39A begin closing the payload bay doors on Space Shuttle Atlantis. The payload includes the SPACEHAB Double Module (center) and two GetAway Special (GAS) canist... More

CAPE CANAVERAL, Fla. --  With red umbilical lines attached, the payload containing space shuttle Discovery's S6 truss and solar arrays is lifted up to the Payload Changeout Room, or PCR, on Launch Pad 39A at NASA's Kennedy Space Center in Florida. The payload will be transferred inside the PCR where it will wait until Discovery rolls out to the pad. Then the payload will be installed in the shuttle's payload bay. Launch of Discovery on the STS-119 mission is scheduled for Feb. 12. During Discovery's 14-day mission, the crew will install the S6 truss segment and its solar arrays to the starboard side of the station, completing the station's backbone, or truss.  Photo credit: NASA/Jim Grossmann KSC-2009-1096

CAPE CANAVERAL, Fla. -- With red umbilical lines attached, the payloa...

CAPE CANAVERAL, Fla. -- With red umbilical lines attached, the payload containing space shuttle Discovery's S6 truss and solar arrays is lifted up to the Payload Changeout Room, or PCR, on Launch Pad 39A at NA... More

KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39A, the payload canister with the SPACEHAB Double Module and the Integrated Cargo Carrier (ICC) inside is lifted off the payload transporter toward the Payload Changeout Room (PCR) on the Rotating Service Structure (RSS). The PCR is an environmentally controlled facility supporting cargo delivery to the pad and vertical installation in the orbiter cargo bay. At right of the RSS is the Fixed Service Structure. The primary payloads on mission STS-101, the module and ICC contain internal logistics and resupply cargo for restoring full redundancy to the International Space Station power system in preparation for the arrival of the next pressurized module, the Russian-built Zvezda. The payloads will be transferred to Space Shuttle Atlantis after Atlantis rolls out to the pad. Launch of Atlantis on mission STS-101 is scheduled no earlier than April 17, 2000 KSC-00pp0369

KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39A, the payload canister ...

KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39A, the payload canister with the SPACEHAB Double Module and the Integrated Cargo Carrier (ICC) inside is lifted off the payload transporter toward the Payload Chang... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the STS-133 payload canister is lifted into the rotating service structure on Launch Pad 39A.      The payload then will be moved into space shuttle Discovery's payload bay. Discovery and its STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Launch is targeted for 4:40 p.m. EDT, Nov. 1. Photo credit: NASA/Troy Cryder KSC-2010-5019

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the STS-133 payload canister is lifted into the rotating service structure on Launch Pad 39A. The payload then will be moved into space sh... More

CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center removes the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope.  The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller KSC-08pd2081

CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servic...

CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center removes the protective wrapping from the Orbit... More

KENNEDY SPACE CENTER, FLA. --  The orbiter Discovery backs out of the Orbiter Processing Facility bay 3 for the short rollover to the Vehicle Assembly Building. First motion was at 9:23 p.m. Oct. 31.  In the VAB the orbiter will be mated to its large external tank and twin solid rocket boosters already stacked on the mobile launcher platform.  Space Shuttle Discovery is scheduled to roll out to Launch Pad 39B no earlier than Nov. 7 for mission STS-116.  The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Kim Shiflett KSC-06pd2413

KENNEDY SPACE CENTER, FLA. -- The orbiter Discovery backs out of the ...

KENNEDY SPACE CENTER, FLA. -- The orbiter Discovery backs out of the Orbiter Processing Facility bay 3 for the short rollover to the Vehicle Assembly Building. First motion was at 9:23 p.m. Oct. 31. In the VA... More

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, space shuttle Atlantis is lowered into High Bay 3. In the bay, the shuttle will be mated with its external fuel tank and solid rocket boosters on the mobile launcher platform. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A for a targeted launch on May 12 on the STS-125 mission to service NASA's Hubble Space Telescope.   Photo credit: NASA/Kim Shiflett KSC-2009-2278

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kenn...

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, space shuttle Atlantis is lowered into High Bay 3. In the bay, the shuttle will be mated with its external fuel... More

CAPE CANAVERAL, Fla. -- In High Bay 3 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, a large yellow, metal sling lowers shuttle Discovery to its external fuel tank and solid rocket boosters. The lift and mate operation began Sept. 9 and wrapped up early Sept. 10. Discovery is scheduled to roll out to Launch Pad 39A later this month in preparation for its launch to the International Space Station on the STS-133 mission.    Targeted to lift off Nov. 1, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the station. Photo credit: NASA/Jack Pfaller KSC-2010-4626

CAPE CANAVERAL, Fla. -- In High Bay 3 of the Vehicle Assembly Building...

CAPE CANAVERAL, Fla. -- In High Bay 3 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, a large yellow, metal sling lowers shuttle Discovery to its external fuel tank and solid rocket ... More

CAPE CANAVERAL, Fla. –  In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the 250-ton high bay crane suspends space shuttle Discovery above the transfer aisle, ready to lift the shuttle into the upper levels and lower it into High Bay 1. Visible on Discovery's underside are the umbilical areas, the external fuel tank attach points. In High Bay 1, Discovery will be attached to the external tank and solid rocket boosters already stacked on the mobile launcher platform.  Discovery is scheduled to roll out to Launch Pad 39A the first week of August to prepare for the STS-128 mission to the International Space Station.  The shuttle will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay.  Launch of Discovery is targeted for late August.  Photo credit: NASA/Ben Smegelsky KSC-2009-4251

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Ken...

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the 250-ton high bay crane suspends space shuttle Discovery above the transfer aisle, ready to lift the shuttl... More

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building's high bay 3 at NASA's Kennedy Space Center in Florida, a worker closely observes space shuttle Atlantis as it rolls in after leaving Launch Pad 39A.  In the VAB, Atlantis will await launch on its STS-125 mission to repair NASA's Hubble Space Telescope.  First motion of Atlantis off the pad was at 6:48 a.m. EDT. Atlantis' targeted launch on Oct. 14 was delayed when a system that transfers science data from the orbiting observatory to Earth malfunctioned on Sept. 27. The new target launch date is under review.  Photo credit: NASA/Kim Shiflett KSC-08pd3279

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building's high bay 3 a...

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building's high bay 3 at NASA's Kennedy Space Center in Florida, a worker closely observes space shuttle Atlantis as it rolls in after leaving Launch Pad 39A. In ... More

Members of the STS-102 crew check out Discovery’s payload bay in the Orbiter Processing Facility bay 1. Dressed in green, they are Mission Specialist Paul W. Richards (left) and Pilot James W. Kelly. The crew is at KSC for Crew Equipment Interface Test activities. Above their heads on the left side are two of the experiments being carried on the flight. STS-102 is the 8th construction flight to the International Space Station and will carry the Multi-Purpose Logistics Module Leonardo. STS-102 is scheduled for launch March 1, 2001. On that flight, Leonardo will be filled with equipment and supplies to outfit the U.S. laboratory module Destiny. The mission will also be carrying the Expedition Two crew to the Space Station, replacing the Expedition One crew who will return on Shuttle Discovery KSC01pp0173

Members of the STS-102 crew check out Discovery’s payload bay in the O...

Members of the STS-102 crew check out Discovery’s payload bay in the Orbiter Processing Facility bay 1. Dressed in green, they are Mission Specialist Paul W. Richards (left) and Pilot James W. Kelly. The crew i... More

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a battery charge-discharge unit is lifted by crane high above the hardware on the bay's floor. The unit is being moved toward an EXPRESS Logistics Carrier where it will be installed for flight.  The carrier is part of the STS-129 payload on space shuttle Atlantis, which will deliver to the International Space Station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm. STS-129 is targeted to launch Nov. 12. Photo credit: NASA/Jim Grossmann KSC-2009-4680

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NAS...

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a battery charge-discharge unit is lifted by crane high above the hardware on the bay's floor. The unit... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery backs out of its processing bay, Orbiter Processing Facility-2, or OPF-2, to begin the move to the Vehicle Assembly Building, or VAB.    Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit   www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html.  Photo credit: NASA/Jim Grossmann KSC-2011-5527

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, spa...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery backs out of its processing bay, Orbiter Processing Facility-2, or OPF-2, to begin the move to the Vehicle Assembly Bui... More

CAPE CANAVERAL, Fla. – Pratt & Whitney Rocketdyne technicians install a space shuttle main engine on space shuttle Endeavour in Orbiter Processing Facility Bay 2 at NASA's Kennedy Space Center in Florida.  The engine will fly on the shuttle's STS-130 mission to the International Space Station.    Even though this engine weighs one-seventh as much as a locomotive engine, its high-pressure fuel pump alone delivers as much horsepower as 28 locomotives, while its high-pressure oxidizer pump delivers the equivalent horsepower of an additional 11 locomotives. The maximum equivalent horsepower developed by the shuttle's three main engines is more than 37 million horsepower.  Endeavour is targeted to launch Feb. 4, 2010. Photo credit: NASA/Jim Grossmann KSC-2009-6123

CAPE CANAVERAL, Fla. – Pratt & Whitney Rocketdyne technicians install ...

CAPE CANAVERAL, Fla. – Pratt & Whitney Rocketdyne technicians install a space shuttle main engine on space shuttle Endeavour in Orbiter Processing Facility Bay 2 at NASA's Kennedy Space Center in Florida. The ... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery -- its nose encased in protective plastic, its cockpit windows covered, and strongbacks attached to its payload bay doors -- awaits entry into the Vehicle Assembly Building, or VAB, after rolling from Orbiter Processing Facility-2, or OPF-2.    Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit   www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html.  Photo credit: NASA/Frankie Martin KSC-2011-5550

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, spa...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery -- its nose encased in protective plastic, its cockpit windows covered, and strongbacks attached to its payload bay doo... More

CAPE CANAVERAL, Fla. -- In the Press Site auditorium at NASA's Kennedy Space Center in Florida, Shuttle Launch Director Mike Leinbach briefs media about the launch status of space shuttle Endeavour's STS-134 mission and announces a new launch date.      Technicians replaced and tested the aft load control assembly-2 (ALCA-2) and wiring located in Endeavour's aft avionics bay 5. ALCA-2 distributes power to nine shuttle systems and is believed to have caused fuel line heaters for Endeavour's auxiliary power unit-1 (APU-1) to fail April 29 during the first launch attempt. Launch now is scheduled for May 16 at 8:56 a.m. EDT. Endeavour and its crew will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the station. This will be the final spaceflight for Endeavour. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Jack Pfaller KSC-2011-3421

CAPE CANAVERAL, Fla. -- In the Press Site auditorium at NASA's Kennedy...

CAPE CANAVERAL, Fla. -- In the Press Site auditorium at NASA's Kennedy Space Center in Florida, Shuttle Launch Director Mike Leinbach briefs media about the launch status of space shuttle Endeavour's STS-134 mi... More

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, technicians oversee the lifting of the Cosmic Origins Spectrograph, or COS, from a stand.  The COS will be moved to and placed on the Orbital Replacement Unit Carrier that will be installed in space shuttle Atlantis' payload bay.  The COS is part of the payload for the Hubble servicing mission, STS-125, targeted to launch in mid-May. Installing the COS during the mission will effectively restore spectroscopy to Hubble’s scientific arsenal, and at the same time provide the telescope with unique capabilities. COS is designed to study the large-scale structure of the universe and how galaxies, stars and planets formed and evolved. It will help determine how elements needed for life such as carbon and iron first formed and how their abundances have increased over the lifetime of the universe.  Photo credit: NASA/Kim Shiflett KSC-2009-2162

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at ...

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, technicians oversee the lifting of the Cosmic Origins Spectrograph, or COS, from a stand. The COS w... More

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is lowered into high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller KSC-2011-3041

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA'...

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is lowered into high bay-1 for j... More

CAPE CANAVERAL, Fla. - In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a technician works to replace the protective cover on the Super Lightweight Interchangeable Carrier, or SLIC.  The cover was removed to clean  the carrier of contaminants found Sept. 17 during preparations to deliver NASA's Hubble Space Telescope servicing payload to Launch Pad 39A. Cleanliness is extremely important for space shuttle Atlantis’ STS-125 mission to Hubble, and the teams have insured that the SLIC  is ready to fly.  The SLIC, which holds battery module assemblies, is built with state-of-the-art, lightweight, composite materials - carbon fiber with a cyanate ester resin and a titanium metal matrix composite. These composites have greater strength-to-mass ratios than the metals typically used in spacecraft design. The carrier is one of four being transferred to Launch Pad 39A. At the pad, the carriers will be loaded into Atlantis’ payload bay.  Launch of Atlantis is targeted for Oct. 10.   Photo credit: NASA/Jack Pfaller KSC-08pd2655

CAPE CANAVERAL, Fla. - In the Payload Hazardous Servicing Facility at ...

CAPE CANAVERAL, Fla. - In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a technician works to replace the protective cover on the Super Lightweight Interchangeable Carrier, or SLIC. ... More

KENNEDY SPACE CENTER, FLA. --  In the transfer aisle of the Vehicle Assembly Building, space shuttle Endeavour is lifted off its transporter.  The shuttle will be raised to a vertical position and lifted up into high bay 1 to be attached to its external fuel tank and solid rocket boosters in preparation for launch on the STS-123 mission, targeted for March 11.  The mission will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre.   Photo credit: NASA/Dimitri Gerondidakis KSC-08pd0275

KENNEDY SPACE CENTER, FLA. -- In the transfer aisle of the Vehicle As...

KENNEDY SPACE CENTER, FLA. -- In the transfer aisle of the Vehicle Assembly Building, space shuttle Endeavour is lifted off its transporter. The shuttle will be raised to a vertical position and lifted up int... More

In the Space Station Processing Facility, workers help guide the overhead crane as it lifts the Multi-Purpose Logistics Module Donatello out of the shipping container. In the SSPF, Donatello will undergo processing by the payload test team, including integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle’s payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo. Donatello will be launched on mission STS-130, currently planned for September 2004 KSC-01pp0246

In the Space Station Processing Facility, workers help guide the overh...

In the Space Station Processing Facility, workers help guide the overhead crane as it lifts the Multi-Purpose Logistics Module Donatello out of the shipping container. In the SSPF, Donatello will undergo proces... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery rolls along the towway from Orbiter Processing Facility-2, or OPF-2, to the Vehicle Assembly Building, or VAB.  Railings, called strongbacks, are installed along Discovery's payload bay doors to assist with opening and closing of the doors when the shuttle's hydraulic system is not operational and support the doors while they are open.    Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit   www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html.  Photo credit: NASA/Frankie Martin KSC-2011-5540

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, spa...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery rolls along the towway from Orbiter Processing Facility-2, or OPF-2, to the Vehicle Assembly Building, or VAB. Railing... More

KENNEDY SPACE CENTER, FLA. -  STS-114 Mission Specialist Stephen Robinson is helped by the Closeout Crew with his launch and entry suit before entering Space Shuttle Discovery.  The Return to Flight mission to the International Space Station carries the External Stowage Platform-2, equipped with spare part assemblies, and a replacement Control Moment Gyroscope contained in the Lightweight Multi-Purpose Experiment Support Structure and Multi-Purpose Logistics Module Raffaello, housing 15 tons of hardware and supplies that will be transferred to the Station after the Shuttle docks to the complex .  On this mission, the crew will perform inspections on-orbit for the first time of all of the Reinforced Carbon-Carbon (RCC) panels on the leading edge of the wings and the Thermal Protection System tiles using the new Canadian-built Orbiter Boom Sensor System and the data from 176 impact and temperature sensors. Mission Specialists will also practice repair techniques on RCC and tile samples during a spacewalk in the payload bay. KSC-05pp1799

KENNEDY SPACE CENTER, FLA. - STS-114 Mission Specialist Stephen Robin...

KENNEDY SPACE CENTER, FLA. - STS-114 Mission Specialist Stephen Robinson is helped by the Closeout Crew with his launch and entry suit before entering Space Shuttle Discovery. The Return to Flight mission to ... More

KENNEDY SPACE CENTER, FLA. --   On Launch Pad 39B at NASA's Kennedy Space Center, the payload canister holding Space Shuttle Discovery's payloads is lifted off its transporter toward the payload changeout room on the rotating service structure. The payload changeout room provides an environmentally clean or "white room" condition in which to receive a payload transferred from a protective payload canister. After the shuttle arrives at the pad, the rotating service structure will close around it and the payloads, which include the multi-purpose logistics module and integrated cargo carrier, will then be transferred from the changeout room into Discovery's payload bay. Discovery's launch to the International Space Station on mission STS-121 is targeted for July 1 in a launch window that extends to July 19. During the 12-day mission, crew members will test new hardware and techniques to improve shuttle safety. Photo credit: NASA/Kim Shiflett KSC-06pd0855

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39B at NASA's Kennedy Sp...

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39B at NASA's Kennedy Space Center, the payload canister holding Space Shuttle Discovery's payloads is lifted off its transporter toward the payload changeout room ... More

KENNEDY SPACE CENTER, FLA. -- This 30-second timed exposure captures the bright lights around the Vehicle Assembly Building (VAB) plus the equally bright moon (upper right) as Space Shuttle Atlantis (far left) rolls out of the east side bay 1.  The Launch Control Center sits between the Shuttle and the VAB.  The full stack of Shuttle, solid rocket boosters and external tank are taking part in a fit check for the newly renovated crawlerway and high bay 2, which is on the west side.  The major modifications to the crawlerway and VAB provide Shuttle flight hardware more storage space and protection - "Safe Haven" - from hurricanes or tropical storms.  Atlantis began moving out of VAB high bay 1 at 2:59 a.m. EDT.  After the successful Safe Haven fit check, Shuttle Atlantis is scheduled to roll out to Launch Pad 39B in preparation for the STS-106 launch on Sept. 8. KSC-00pp1127

KENNEDY SPACE CENTER, FLA. -- This 30-second timed exposure captures t...

KENNEDY SPACE CENTER, FLA. -- This 30-second timed exposure captures the bright lights around the Vehicle Assembly Building (VAB) plus the equally bright moon (upper right) as Space Shuttle Atlantis (far left) ... More

CAPE CANAVERAL, Fla. –– On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the payload canister is lifted toward the payload changeout room, or PCR, on the rotating service structure. The red umbilical lines are still attached. The canister's cargo of Hubble Space Telescope equipment will be deposited in the PCR and later transferred to the payload bay on space shuttle Atlantis, at right. Atlantis' 11-day STS-125 mission to service Hubble is targeted for launch May 12.  The flight will include five spacewalks in which astronauts will refurbish and upgrade the telescope with state-of-the-art science instruments. As a result, Hubble's capabilities will be expanded and its operational lifespan extended through at least 2014.  Photo credit: NASA/Kim Shiflett KSC-2009-2784

CAPE CANAVERAL, Fla. –– On Launch Pad 39A at NASA's Kennedy Space Cent...

CAPE CANAVERAL, Fla. –– On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the payload canister is lifted toward the payload changeout room, or PCR, on the rotating service structure. The red umbilica... More

CAPE CANAVERAL, Fla. ---    In the Orbiter Processing Facility at NASA's Kennedy Space Center, workers prepare space shuttle Discovery's payload bay for payload installation.  The launch of Discovery on its STS-124 mission is targeted for April 24. On the mission, Discovery will transport the Kibo Japanese Experiment Module - Pressurized Module and the Japanese Remote Manipulator System to the International Space Station.   Photo credit: NASA/Kim Shiflett KSC-08pd0772

CAPE CANAVERAL, Fla. --- In the Orbiter Processing Facility at NASA...

CAPE CANAVERAL, Fla. --- In the Orbiter Processing Facility at NASA's Kennedy Space Center, workers prepare space shuttle Discovery's payload bay for payload installation. The launch of Discovery on its STS... More

KENNEDY SPACE CENTER, FLA. -- Inside the Orbiter Processing Facility, space shuttle Endeavour settles on its transporter for the trip to the Vehicle Assembly Building.  In high bay 1 of the VAB, Endeavour will be attached to its external fuel tank and solid rocket boosters in preparation for its upcoming mission, STS-123, to the International Space Station targeted for March 11.  The mission will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre.   Photo credit: NASA/Jim Grossmann KSC-08pd0264

KENNEDY SPACE CENTER, FLA. -- Inside the Orbiter Processing Facility, ...

KENNEDY SPACE CENTER, FLA. -- Inside the Orbiter Processing Facility, space shuttle Endeavour settles on its transporter for the trip to the Vehicle Assembly Building. In high bay 1 of the VAB, Endeavour will ... More

CAPE CANAVERAL, Fla. -  In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, an overhead crane lifts the Orbital Replacement Unit Carrier, or ORUC, and moves it across the floor to install it in the payload canister.  The carrier is one of four associated with the STS-125 mission to service the Hubble Space Telescope. It will be installed in the payload canister for transfer to Launch Pad 39A. At the pad, all the carriers will be loaded into space shuttle Atlantis’ payload bay. Launch of Atlantis is targeted for Oct. 10.  Photo credit: NASA/Jack Pfaller KSC-08pd2713

CAPE CANAVERAL, Fla. - In the Payload Hazardous Servicing Facility at...

CAPE CANAVERAL, Fla. - In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, an overhead crane lifts the Orbital Replacement Unit Carrier, or ORUC, and moves it across the floor to instal... More

With Capt. George Hoggard, trainer with the KSC Fire Department, riding on top, Mission Specialist Koichi Wakata of Japan practices driving the M-113, part of emergency egress training during Terminal Countdown Demonstration Test (TCDT) activities. Riding in the back (on the left) are other crew members, waiting their turn to drive. The tracked vehicle could be used by the crew in the event of an emergency at the pad during which the crew must make a quick exit from the area. The TCDT also provides simulated countdown exercises and opportunities to inspect the mission payloads in the orbiter’s payload bay. STS-92 is scheduled to launch Oct. 5 at 9:30 p.m. EDT on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program KSC-00pp1320

With Capt. George Hoggard, trainer with the KSC Fire Department, ridin...

With Capt. George Hoggard, trainer with the KSC Fire Department, riding on top, Mission Specialist Koichi Wakata of Japan practices driving the M-113, part of emergency egress training during Terminal Countdown... More

CAPE CANAVERAL, Fla. -- In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, shuttle Atlantis is lifted by an overhead crane and moved into a high bay where it will be attached to its external fuel tank and solid rocket boosters which are already on the mobile launcher platform.                      Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandra Magnus and Rex Walheim are expected to launch in mid-July, taking with them the Raffaello multi-purpose logistics module packed with supplies, logistics and spare parts. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing spacecraft and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Dimitri Gerondidakis KSC-2011-3822

CAPE CANAVERAL, Fla. -- In the Vehicle Assembly Building at NASA's Ken...

CAPE CANAVERAL, Fla. -- In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, shuttle Atlantis is lifted by an overhead crane and moved into a high bay where it will be attached to its ext... More

Previous

of 44

Next