visibility Similar

code Related

Production. Steam power plant equipment. Grinding a girth seam on a high-pressure boiler drum in preparation for X-ray inspection. Steam boilers and other power-house equipment to supplement the hydroelectric installations of the Tennessee Valley Authority (TVA) system are produced in the large Chattanooga shops of the Combustion Engineering Company

Production. Steam power plant equipment. Grinding an inside girth seam on a heat exchanger for a high-pressure boiler. Steam boilers and other power-house equipment to supplement the hydroelectric installations of the Tennessee Valley Authority (TVA) system are produced in the large Chattanooga shops of the Combustion Engineering Company

Production. Steam power plant equipment. Chipping slag from a long arc-welded seam of a new high-pressure boiler. Steam boilers and other power-house equipment to supplement the hydroelectric installations of the Tennessee Valley Authority (TVA) system are produced in the large Chattanooga shops of the Combustion Engineering Company

Production. Steam power plant equipment. Grinding an inside girth seam on a heat exchanger for a high-pressure boiler. Steam boilers and other power-house equipment to supplement the hydroelectric installations of the Tennessee Valley Authority (TVA) system are produced in the large Chattanooga shops of the Combustion Engineering Company

Production. Steam power plant equipment. Chipping away excess metal on a girth seam of a high-pressure boiler drum. Steam boilers and other power-house equipment to supplement the hydroelectric installations of the Tennessee Valley Authority (TVA) system are produced in the large Chattanooga shops of the Combustion Engineering Company

Production. Steam power plant equipment. Chipping away excess metal on a girth seam of a high-pressure boiler drum. Steam boilers and other power-house equipment to supplement the hydroelectric installations of the Tennessee Valley Authority (TVA) system are produced in the large Chattanooga shops of the Combustion Engineering Company

Production. Steam power plant equipment. Filling tube holes on a high-pressure boiler drum. Steam boilers and other power-house equipment to supplement the hydroelectric installations of the Tennessee Valley Authority (TVA) system are produced in the large Chattanooga shops of the Combustion Engineering Company

Production. Steam power plant equipment. Chipping slag from a long arc-welded seam of a new high-pressure boiler. Steam boilers and other power-house equipment to supplement the hydroelectric installations of the Tennessee Valley Authority (TVA) system are produced in the large Chattanooga shops of the Combustion Engineering Company

Production. Steam power plant equipment. An electric arc-welder runs a seam on a new high-pressure boiler. Steam boilers and other power-house equipment to supplement the hydroelectric installations of the Tennessee Valley Authority (TVA) system are produced in the large Chattanooga shops of the Combustion Engineering Company

Production. Steam power plant equipment. Grinding a girth seam on a high-pressure boiler drum in preparation for X-ray inspection. Steam boilers and other power-house equipment to supplement the hydroelectric installations of the Tennessee Valley Authority (TVA) system are produced in the large Chattanooga shops of the Combustion Engineering Company

description

Summary

Picryl description: Public domain image of an aircraft, assembly line, industrial facility, 1930s aviation, free to use, no copyright restrictions.

label_outline

Tags

tennessee hamilton county chattanooga safety film negatives chattanooga tenn production steam equipment steam power plant equipment girth seam girth seam boiler preparation x ray inspection x ray inspection steam boilers power house power house equipment supplement installations valley authority tennessee valley authority tva system shops chattanooga shops combustion company united states history library of congress power plants electric power
date_range

Date

01/01/1942
person

Contributors

Palmer, Alfred T., photographer
United States. Office of War Information.
place

Location

Chattanooga (Tenn.) ,  35.04556, -85.30972
create

Source

Library of Congress
link

Link

http://www.loc.gov/
copyright

Copyright info

Public Domain

label_outline Explore Girth Seam, Chattanooga Shops, Steam Power Plant Equipment

Chickamauga Dam, Tennessee (Tennessee Valley Authority (TVA)). Generators

PROPULSION SYSTEMS LABORATORY PSL ENGINE INSTALLATIONS

Knoxville, Tennessee (Tennessee Valley Authority (TVA)). Training for war production at NYA (National Youth Administration) school

Hurricane/Tropical Storm - Middleburgh, N. Y. , August 31, 2011 -- Damaged properties after Hurricane Irene passed through on August 28, 2011. President declares Disaster for State of New York to supplement state and local recovery efforts in the area affected by Hurricane Irene. Photo by Elissa Jun/FEMA

Special Warfare Operator 1st Class (SEAL) Justin Gonzales performs at the AT&T Field during Chattanooga Navy Week.

Charles A. Williams, Jr., assistant secretary of the

STRAIN GAUGE INSTALLATIONS ON COMPRESSOR BLADES OF F-100 ENGINE

Tennessee Valley Authority. Watts Bar Dam hydroelectric plant. One of four tube-generating units which produce electric power at TVA's Watts Bar steam plant. This plant will supplement the big hydroelectric installations at Watts Bar Dam, which has an authorized output of 90,000 kilowatts, and a possible ultimate of 150,000 kilowatts. Each of the four big turbo-generators in the steam plant is rated at 60,000 kilowatts

At an entrance to Interstate Highway 70 (I-70), a member of the Glenwood Springs Police Department brief members of the 220th Military Police (MP) Company, Colorado Army National Guard (COARNG) on the Coal Seam Fires. The 220th MP will set up security access control points along the perimeter including I-70. The Coal Seam Fire started sometime in the mid-1970s as an underground fire burned along a rich vein of coal. Occassionally the fire breaks through to the surface. At this time it had burned 7,300 acres, damaged an estimated 40 structures, and caused the evacuation of 2,000 residents

The Douglas A-24 (Dauntless) light dive bomber, is the Army counterpart of the Navy SBD, with certain modifications to meet Army requirements. It was designed for dive-bombing operations against ground troops and installations. It is equipped with slotted diving flaps to decrease air speed and obtain greater accuracy. The Dauntless is more maneuverable than the German Stuka and is capable of carrying heavier bomb loads

A view of Air Force fire crash rescue vehicles that were sent here to supplement the 3665th AAF Fire Department during Exercise Gallant Eagle '82

Fort Knox. Power line construction. This husky member of a construction crew, building a new 33,000 volt electric power line into Fort Knox, Kentucky, is performing an important war service. Thousands of soldiers are in training at Fort Knox, and the new line from a hydroelectric plant at Louisville is needed to supplement the existing power supply

Topics

tennessee hamilton county chattanooga safety film negatives chattanooga tenn production steam equipment steam power plant equipment girth seam girth seam boiler preparation x ray inspection x ray inspection steam boilers power house power house equipment supplement installations valley authority tennessee valley authority tva system shops chattanooga shops combustion company united states history library of congress power plants electric power