visibility Similar

code Related

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building, Richard Bruns, a United Space Alliance SRB technician, begins to detach the SRB system tunnel cover on the 36 cables inside. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6. <br KSC01pp0143

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building, Richard Bruns, a United Space Alliance SRB technician, pulls cables out of the solid rocket booster system tunnel. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6. <br KSC01pp0151

KENNEDY SPACE CENTER, FLA. -- United Space Alliance SRB technician Jim Glass conducts a Flex test on a cable on the solid rocket booster at left. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6. <br KSC01pp0157

KENNEDY SPACE CENTER, FLA. -- Solid rocket booster cables are exposed after removal of the SRB system tunnel cover. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6. <br KSC01pp0149

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building, Richard Bruns and Henry Jones, United Space Alliance SRB technicians, begin to detach the SRB system tunnel cover on the 36 cables inside. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6. <br KSC01pp0144

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building, United Space Alliance SRB technicians Robert G. Williams and Frank Meyer remove the cover of the solid rocket booster system tunnel. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6. <br KSC01pp0150

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building, United Space Alliance SRB technician Frank Meyer pulls cables out of the solid rocket booster system tunnel. Cable end covers are in a box near his feet. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6. <br KSC01pp0152

KENNEDY SPACE CENTER, FLA. -- Near the bottom of the solid rocket booster in the Vehicle Assembly Building, a United Space Alliance SRB technician detaches the SRB system tunnel cover on the 36 cables inside. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6 KSC01pp0147

KENNEDY SPACE CENTER, FLA. -- Near the bottom of the solid rocket booster, a worker in the Vehicle Assembly Building begins to detach the SRB system tunnel cover on the 36 cables inside. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6. <br KSC01pp0146

KENNEDY SPACE CENTER, FLA. -- United Space Alliance SRB technician Richard Bruns attaches a cable end cover to a cable pulled from the solid rocket booster on Space Shuttle Atlantis. The Shuttle was rolled back from Launch Pad 39A in order to conduct tests on the SRB cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6. <br KSC01pp0153

description

Summary

KENNEDY SPACE CENTER, FLA. -- United Space Alliance SRB technician Richard Bruns attaches a cable end cover to a cable pulled from the solid rocket booster on Space Shuttle Atlantis. The Shuttle was rolled back from Launch Pad 39A in order to conduct tests on the SRB cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6. <br

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Space Shuttle Atlantis was a space shuttle that was operated by NASA as part of the Space Shuttle program. It was the fourth operational shuttle built, and the last one to be built before the program was retired in 2011. Atlantis was named after the first research vessel operated by the Woods Hole Oceanographic Institution, and it made its first flight in October 1985. Over the course of its career, Atlantis completed 33 missions and spent a total of 307 days in space. Its last mission was STS-135, which was the final mission of the Space Shuttle program. Atlantis is now on display at the Kennedy Space Center Visitor Complex in Florida. Space Shuttle Atlantis (Orbiter Vehicle Designation: OV-104) was one of the four first operational orbiters in the Space Shuttle fleet of NASA, the space agency of the United States. (The other two are Discovery and Endeavour.) Atlantis was the fourth operational shuttle built. Atlantis is named after a two-masted sailing ship that operated from 1930 to 1966 for the Woods Hole Oceanographic Institute. Atlantis performed well in 25 years of service, flying 33 missions.

label_outline

Tags

kennedy space center srb technician richard bruns space alliance srb technician richard bruns cable cable end rocket booster rocket booster atlantis space shuttle atlantis launch pad order tests conduct tests srb cables nasa srb cable inventory conductor damage conductor damage shuttle managers integrity system tunnel system tunnel cables workers inspections continuity checks continuity checks x ray analysis x ray analysis space shuttle nasa
date_range

Date

20/01/2001
collections

in collections

Space Shuttle Program

Space Shuttle Atlantis

The Fourth Pperational Shuttle Built
place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Bruns, X Ray Analysis, Continuity Checks

[Assignment: 48-DPA-08-12-08_SOI_K_AZ_Border_Pat] Visit of Secretary Dirk Kempthorne to [Pima County,] Arizona's border area with Mexico, [where he joined] U.S. Customs and Border Protection personnel for meetings, tours, [flights, inspections] [48-DPA-08-12-08_SOI_K_AZ_Border_Pat_DOI_6354.JPG]

[Assignment: 48-DPA-08-12-08_SOI_K_AZ_Border_Pat] Visit of Secretary Dirk Kempthorne to [Pima County,] Arizona's border area with Mexico, [where he joined] U.S. Customs and Border Protection personnel for meetings, tours, [flights, inspections] [48-DPA-08-12-08_SOI_K_AZ_Border_Pat_IOD_2299.JPG]

Missile Maintenance Technicians from the 90th MXS/LSS stand at the opening of Minuteman III Silo, Alpha-7. Pictured are: SENIOR AIRMAN Eric Laboarde (on diveboard), STAFF SGT. Jason Bruns & STAFF SGT. Monte Reeder (in work cage)

[Assignment: 59-CF-DS-8743-03] Ribbon-cutting event for launch of computer systems integrity anti-virus software distribution initiative [Photographer: Mark Stewart--State] [59-CF-DS-8743-03_Anti-Virus_09.jpg]

Iver Olsen - Kammerorkester i stueunteriør

Production. Pratt and Whitney airplane engines. Careful inspections between honings assure compliance with rigid standards in making the master piston rods for Pratt and Whitney airplane engines. The superior performance of the engines, in which rods like this are used, depends upon faithful adherence to specifications. Pratt and Whitney Aircraft

A man in a vest and tie standing in front of a microphone. Heinrich bender conductor music, music.

Conductor F. T. Granstaff, working on his records in the caboose on the Atchison, Topeka, and Santa Fe Railroad between Marceline, Missouri and Argentine, Kansas

A. Bodansky, George Grantham Bain Collection

Rudolfo Fernandez conductor of the Lompoc Pops Orchestra leads the orchestra in a rendition of the theme from the movie "2001 A Space Odyssey" during the GUARDIAN CHALLENGE 2001 opening ceremony at Vandenberg Air Force Base, California. GUARDIAN CHALLENGE, the world's premier space and missile competition, is a four-day event hosted annually at Vandenberg AFB, CA "to recognize the best and demonstrate the commands warfighting skills. GUARDIAN CHALLENGE creates competition-tough crews; improves readiness and combat capabilities through preparation, innovation and sharing; enhances esprit de corps and strengthens teamwork across all mission areas in the command."

Bruns, Paul Jakob - Public domain portrait engraving

KENNEDY SPACE CENTER, FLA. - At Astrotech Space Operations in Titusville, Fla., the Mercury Surface, Space Environment, Geochemistry and Ranging (MESSENGER) spacecraft’s two solar arrays are undergoing cleaning inspections and voltage checks in preparation for installation on June 24 -25. One array will be installed each day, followed by a deployment test. The spacecraft will fly past Earth once, Venus twice and Mercury three times before starting a year-long orbital study of Mercury in March 2011. Launch is scheduled for July 30, 2004, from Pad 17-B at Cape Canaveral Air Force Station. MESSENGER was built for NASA by the Johns Hopkins University Applied Physics Laboratory in Laurel, Md. KSC-04pd1328

Topics

kennedy space center srb technician richard bruns space alliance srb technician richard bruns cable cable end rocket booster rocket booster atlantis space shuttle atlantis launch pad order tests conduct tests srb cables nasa srb cable inventory conductor damage conductor damage shuttle managers integrity system tunnel system tunnel cables workers inspections continuity checks continuity checks x ray analysis x ray analysis space shuttle nasa