visibility Similar

code Related

KENNEDY SPACE CENTER, FLA. - After a week's delay of launching due to weather and technical issues, the crew of mission STS-115 have had the traditional breakfast before their third attempt to launch on Space Shuttle Atlantis. Seated left to right are Mission Specialists Heidemarie Stefanyshyn-Piper and Joseph Tanner, Commander Brent Jett, Pilot Christopher Ferguson and Mission Specialists Steven MacLean and Daniel Burbank. MacLean is with the Canadian Space Agency. The launch attempt on Sept. 8 was scrubbed due to an issue with a fuel cut-off sensor system inside the external fuel tank. This is one of several systems that protect the shuttle's main engines by triggering their shutdown if fuel runs unexpectedly low. Following the breakfast, the crew will don their launch suits before heading to Launch Pad 39B. During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Kim Shiflett KSC-06pd2090

KENNEDY SPACE CENTER, FLA. - The STS-115 crew members stride out of the Operations and Checkout Building eager to get to Launch Pad 39B and the start of their mission to the International Space Station. This is the second attempt at launch after a week's postponement due to weather and technical concerns. On the left side, front to back, are Pilot Christopher Ferguson and Mission Specialists Steven MacLean and Heidemarie Stefanyshyn-Piper. On the right side, front to back, are Commander Brent Jett and Mission Specialists Daniel Burbank and Joseph Tanner. On its second attempt for launch, Atlantis is scheduled to lift off at 11:41 a.m. EDT today from Launch Pad 39B. During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Kim Shiflett KSC-06pd2088

KENNEDY SPACE CENTER, FLA. - The STS-115 crew members walk toward the Astrovan that will take them to Launch Pad 39B. Seen left to right are Mission Specialists Heidemarie Stefanyshyn-Piper, Steven MacLean, Joseph Tanner and Daniel Burbank; Pilot Christopher Ferguson; and Commander Brent Jett. This is the second attempt at launch after a week's postponement due to weather and technical concerns. Atlantis is scheduled to lift off at 11:41 a.m. EDT on this date from Launch Pad 39B. During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Kim Shiflett KSC-06pd2089

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Steven MacLean dons his launch and re-entry suit before heading to the launch pad. MacLean is with the Canadian Space Agency. MacLean is making his second shuttle flight on this mission to the International Space Station aboard Space Shuttle Atlantis. On its second attempt for launch, Atlantis is scheduled to lift off at 11:41 a.m. EDT today from Launch Pad 39B. During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Kim Shiflett KSC-06pd2077

KENNEDY SPACE CENTER, FLA. - The crew of mission STS-115 stop to talk to the media after arriving at NASA Kennedy Space Center's Shuttle Landing Facility to prepare for a second launch attempt on Sept. 6 to the International Space Station. Seen here, left to right, are Mission Specialists Steven MacLean and Joseph Tanner, Commander Brent Jett, Pilot Christopher Ferguson, and Mission Specialists Heidemarie Stefanyshyn-Piper and Daniel Burbank. Mission managers cancelled Atlantis' first launch campaign due to a lightning strike at the pad and the passage of Tropical Storm Ernesto along Florida's east coast. The mission will deliver and install the 17-and-a-half-ton P3/P4 truss segment to the port side of the integrated truss system on the orbital outpost. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. STS-115 is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett KSC-06pd2012

KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Joseph Tanner waits to complete suiting up before heading to the launch pad. Tanner is making his fourth shuttle flight on this mission to the International Space Station aboard Space Shuttle Atlantis. On its second attempt for launch, Atlantis is scheduled to lift off at 11:41 a.m. EDT today from Launch Pad 39B. During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Kim Shiflett KSC-06pd2085

KENNEDY SPACE CENTER, FLA. - The crew of mission STS-115 stop to talk to the media after arriving at NASA Kennedy Space Center's Shuttle Landing Facility to prepare for launch on Aug. 27 to the International Space Station. Seen here, left to right, are Mission Specialists Joseph Tanner, Heidemarie Stefanyshyn-Piper and Steven MacLean (at the microphone), and Commander Brent Jett. The mission will deliver and install the 17-and-a-half-ton P3/P4 truss segment to the port side of the integrated truss system on the orbital outpost. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. STS-115 is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett KSC-06pd1899

KENNEDY SPACE CENTER, FLA. - The crew of mission STS-115 stop to talk to the media after arriving at NASA Kennedy Space Center's Shuttle Landing Facility to prepare for launch on Aug. 27 to the International Space Station. Seen here, left to right, are Mission Specialists Steven MacLean and Daniel Burbank, Pilot Christopher Ferguson, Commander Brent Jett, and Mission Specialists Heidemarie Stefanyshyn-Piper and Joseph Tanner. The mission will deliver and install the 17-and-a-half-ton P3/P4 truss segment to the port side of the integrated truss system on the orbital outpost. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. STS-115 is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett KSC-06pd1900

KENNEDY SPACE CENTER, FLA. - The crew of mission STS-115 arrives at NASA Kennedy Space Center's Shuttle Landing Facility to prepare for launch on Aug. 27 to the International Space Station. They have paused to talk to the media before heading to crew quarters in the Operations and Checkout Building. From left are Mission Specialists Steven MacLean, Joseph Tanner and Heidemarie Stefanyshyn-Piper, Commander Brent Jett, Pilot Christopher Ferguson and Mission Specialist Daniel Burbank. MacLean represents the Canadian Space Agency. The mission will deliver and install the 17-and-a-half-ton P3/P4 truss segment to the port side of the integrated truss system on the orbital outpost. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. STS-115 is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett KSC-06pd1897

KENNEDY SPACE CENTER, FLA. - After a week's delay of launching due to weather and technical issues, the crew of mission STS-115 enjoy the traditional breakfast before their second attempt to launch on Space Shuttle Atlantis. Seated left to right are Mission Specialists Joseph Tanner and Heidemarie Stefanyshyn-Piper, Pilot Christopher Ferguson, Commander Brent Jett and Mission Specialists Steven MacLean and Daniel Burbank. MacLean is with the Canadian Space Agency. Following the breakfast, the crew will don their launch suits before heading to Launch Pad 39B. During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Kim Shiflett KSC-06pd2075

description

Summary

KENNEDY SPACE CENTER, FLA. - After a week's delay of launching due to weather and technical issues, the crew of mission STS-115 enjoy the traditional breakfast before their second attempt to launch on Space Shuttle Atlantis. Seated left to right are Mission Specialists Joseph Tanner and Heidemarie Stefanyshyn-Piper, Pilot Christopher Ferguson, Commander Brent Jett and Mission Specialists Steven MacLean and Daniel Burbank. MacLean is with the Canadian Space Agency. Following the breakfast, the crew will don their launch suits before heading to Launch Pad 39B. During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Kim Shiflett

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Space Shuttle Atlantis was a space shuttle that was operated by NASA as part of the Space Shuttle program. It was the fourth operational shuttle built, and the last one to be built before the program was retired in 2011. Atlantis was named after the first research vessel operated by the Woods Hole Oceanographic Institution, and it made its first flight in October 1985. Over the course of its career, Atlantis completed 33 missions and spent a total of 307 days in space. Its last mission was STS-135, which was the final mission of the Space Shuttle program. Atlantis is now on display at the Kennedy Space Center Visitor Complex in Florida. Space Shuttle Atlantis (Orbiter Vehicle Designation: OV-104) was one of the four first operational orbiters in the Space Shuttle fleet of NASA, the space agency of the United States. (The other two are Discovery and Endeavour.) Atlantis was the fourth operational shuttle built. Atlantis is named after a two-masted sailing ship that operated from 1930 to 1966 for the Woods Hole Oceanographic Institute. Atlantis performed well in 25 years of service, flying 33 missions.

Nothing Found.

label_outline

Tags

vab sts 115 kennedy space center delay crew sts mission sts breakfast attempt second attempt atlantis space shuttle atlantis specialists joseph tanner mission specialists joseph tanner heidemarie stefanyshyn piper heidemarie stefanyshyn piper pilot christopher ferguson pilot christopher ferguson commander brent jett commander brent jett steven maclean mission specialists steven maclean daniel burbank daniel burbank canadian canadian space agency suits launch pad astronauts truss segment truss segment girder like girder like truss giant arrays batteries electronics one fourth power generation capability power generation capability space shuttle flight orbiter orbiter atlantis international space station space shuttle high resolution nasa
date_range

Date

08/09/2006
collections

in collections

Space Shuttle Program

Space Shuttle Atlantis

The Fourth Pperational Shuttle Built
place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Mission Specialists Steven Maclean, Mission Specialists Joseph Tanner, Pilot Christopher Ferguson

S115E06206 - STS-115 - STS-115 MS Stefanyshyn-Piper works on P3/P4 Trusses during third EVA

S115E06100 - STS-115 - Jett and Reiter close the hatch in the Air Lock during Expedition 13 / STS-115 Joint Operations

S115E05811 - STS-115 - MacLean and Burbank performing second EVA spacewalk

STS115-301-029 - STS-115 - STS-115 MS MacLean holding shaver in the MDDK of the Space Shuttle Atlantis

S126E015021 - STS-126 - Bowen, Ferguson and Stefanyshyn-Piper on FD

STS072-314-010 - STS-072 - Pilot Brent Jett and Mission Specialist Koichi Wakata work at aft flight deck station

S115E05828 - STS-115 - MacLean performing second EVA spacewalk

S115E05800 - STS-115 - MacLean and Burbank performing second EVA spacewalk

KENNEDY SPACE CENTER, Fla. -- The Space Shuttle orbiter Discovery touches down in darkness on Runway 15 of the KSC Shuttle Landing Facility, bringing to a close the 10-day STS-82 mission to service the Hubble Space Telescope (HST). Main gear touchdown was at 3:32:26 a.m. EST on February 21, 1997. It was the ninth nighttime landing in the history of the Shuttle program and the 35th landing at KSC. The first landing opportunity at KSC was waved off because of low clouds in the area. The seven-member crew performed a record-tying five back-to-back extravehicular activities (EVAs) or spacewalks to service the telescope, which has been in orbit for nearly seven years. Two new scientific instruments were installed, replacing two outdated instruments. Five spacewalks also were performed on the first servicing mission, STS-61, in December 1993. Only four spacewalks were scheduled for STS-82, but a fifth one was added during the flight to install several thermal blankets over some aging insulation covering three HST compartments containing key data processing, electronics and scientific instrument telemetry packages. Crew members are Mission Commander Kenneth D. Bowersox, Pilot Scott J. "Doc" Horowitz, Payload Commander Mark C. Lee, and Mission Specialists Steven L. Smith, Gregory J. Harbaugh, Joseph R. "Joe" Tanner and Steven A. Hawley. STS-82 was the 82nd Space Shuttle flight and the second mission of 1997 KSC-97pc352

STS106-389-004 - STS-106 - Burbank and Mastracchio work on the TORU container in Zarya during STS-106

S115E06242 - STS-115 - STS-115 MS Stefanyshyn-Piper works on P3/P4 Trusses during third EVA

S126E008344 - STS-126 - Stefanyshyn-Piper and Kimbrough during EVA 2

Topics

vab sts 115 kennedy space center delay crew sts mission sts breakfast attempt second attempt atlantis space shuttle atlantis specialists joseph tanner mission specialists joseph tanner heidemarie stefanyshyn piper heidemarie stefanyshyn piper pilot christopher ferguson pilot christopher ferguson commander brent jett commander brent jett steven maclean mission specialists steven maclean daniel burbank daniel burbank canadian canadian space agency suits launch pad astronauts truss segment truss segment girder like girder like truss giant arrays batteries electronics one fourth power generation capability power generation capability space shuttle flight orbiter orbiter atlantis international space station space shuttle high resolution nasa