visibility Similar

code Related

Construction is ongoing at Lock 1 on the Cumberland

description

Summary

Construction is ongoing at Lock 1 on the Cumberland River in Nashville, Tenn., Aug. 31, 1891. The view shows the stone blocks for the walls looking downstream. The U.S. Army Corps of Engineers Nashville District built the lock and dam to establish a navigation channel. The old locks and dams were replaced by today's modern dams. (USACE Photo)

label_outline

Tags

navigation usace tennessee corps of engineers nashville nashville district cumberland river lock 1 dam 1 leon roberts nashville district celebrating its 130th anniversary in 2018 dvids high resolution us army corps of engineers tennessee history
date_range

Date

2000 - 2022
create

Source

Defense Visual Information Distribution Service
link

Link

https://www.dvidshub.net/
copyright

Copyright info

Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright

label_outline Explore Corps Of Engineers, Tennessee History, Nashville

Topics

navigation usace tennessee corps of engineers nashville nashville district cumberland river lock 1 dam 1 leon roberts nashville district celebrating its 130th anniversary in 2018 dvids high resolution us army corps of engineers tennessee history