Bill Parsons with Discovery Processing Team
Summary
United Space Alliance workers explain tile installation around Discovery’s nose landing gear to Shuttle Program Manager Bill Parsons (center). Discovery has been undergoing Orbiter Major Modifications. The OMM work ranged from wiring, control panels and black boxes to gaseous and fluid systems tubing and components. These systems were deserviced, disassembled, inspected, modified, reassembled, checked out and reserviced, as were most other systems onboard. The work included the installation of the Multifunction Electronic Display Subsystem (MEDS) - a state-of-the-art “glass cockpit.”
Nothing Found.
Tags
Date
29/08/2003
Location
OPF, Kennedy Space Center
Source
NASA
Link
Copyright info
Public Domain Dedication (CC0)