visibility Similar

STS100-719-016 - STS-100 - View of the newly installed SSRMS boom taken during the STS-100 mission

CAPE CANAVERAL, Fla. –NASA's Project Morpheus prototype lander is lifted by a crane in preparation for a tethered-flight test at the north end of the Shuttle Landing Facility at NASA’s Kennedy Space Center in Florida. For the 40-second test, the lander will be hoisted 20 feet. The spacecraft will ascend an additional five feet and hover for five seconds. Morpheus then will perform a 5.6-foot ascent coupled with a 9.8-foot traverse, and hover for five more seconds before returning to the launch point. A number of changes have been made, primarily focused on autonomous landing and hazard avoidance technology ALHAT and moving the Doppler Lidar to the front of the forward liquid oxygen tank. The tether test was cut short due to Morpheus exceeding onboard abort rate limits. The vehicle was taken back to the hangar and data from the test is being studied. After review, managers will determine when a new test date will be set. The landing facility provides the lander with the kind of field necessary for realistic testing, complete with rocks, craters and hazards to avoid. Morpheus’ ALHAT payload allows it to navigate to clear landing sites amidst rocks, craters and other hazards during its descent. For more information on Project Morpheus, visit http://morpheuslander.jsc.nasa.gov/. Photo credit: NASA/Kim Shiflett KSC-2014-4522

Contractors lift the special access program facility

WEST TOWER PANEL ERECTION. NASA public domain image colelction.

(TRACT) Transport Rotorcraft Aircraft Testbed

TRACT 2 Frame Drop Test AT NASA Langley Research Center's Landin

STS100-719-018 - STS-100 - View of the newly installed SSRMS boom taken during the STS-100 mission

CAPE CANAVERAL, Fla. - On the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, a crane lifts one of the final components of the Japan Aerospace Exploration Agency's Kibo laboratory to place it on a flatbed trailer. It will be transported to the Space Station Processing Facility. The components are the Kibo Exposed Facility, or EF, and the Experiment Logistics Module Exposed Section, or ELM-ES. The EF provides a multipurpose platform where science experiments can be deployed and operated in the exposed environment. The payloads attached to the EF can be exchanged or retrieved by Kibo's robotic arm, the JEM Remote Manipulator System. The ELM-ES will be attached to the end of the EF to provide payload storage space and can carry up to three payloads at launch. In addition, the ELM-ES provides a logistics function where it can be detached from the EF and returned to the ground aboard the space shuttle. The two JEM components will be carried aboard space shuttle Endeavour on the STS-127 mission targeted for launch in May 2009. Photo credit: NASA/Jim Grossmann KSC-08pd2920

Loadmasters from the 5th Expeditionary Air Mobility

code Related

Lunarbotics - Preparation of Robots 2010-3503

description

Summary

Lunarbotics - Preparation of Robots

Public domain photograph related to NASA research activity, space exploration, free to use, no copyright restrictions image - Picryl description

Nothing Found.

label_outline

Tags

kennedy space center lunarbotics preparation robots high resolution nasa
date_range

Date

25/05/2010
place

Location

KSC - AHOF
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Preparation, Kennedy Space Center, Robots

A Cardwell-500 drilling rig mast is lifted onto a support structure atop a 40-K-loader in preparation for loading onto a 60th Marine Air Wing C-5B Galaxy aircraft. The rig will be flown to Semipalatinsk, USSR, where it will be used to drill a satellite h

Airman 1st Class Brianna Renninger, 386th Expeditionary

41B-05-153 - STS-41B - Mission Specialist Ronald McNair loads food trays during meal preparation

Airman 1st Class Robert Davis, 48th Logistics Readiness

S127E007703 - STS-127 - Barratt closes Crew Lock of the A/L during EVA-3 Preparation

Hard work equals mission accomplishment in the preparation for Hurricane Bertha by the Hurricane Response Team from McGuire AFB

KENNEDY SPACE CENTER, FLA. -- Boeing technicians move a piece of hardware into position on Node 1 of the International Space Station (ISS) in KSC's Space Station Processing Facility in preparation for mating with Pressurized Mating Adapter (PMA)-2. The node is the first element of the ISS to be manufactured in the United States and is currently scheduled to lift off aboard the Space Shuttle Endeavour on STS-88 later this year, along with PMAs 1 and 2. The 18-foot-in-diameter, 22-foot-long aluminum module was manufactured by the Boeing Co. at Marshall Space Flight Center. Once in space, Node 1 will function as a connecting passageway to the living and working areas of the ISS. It has six hatches that will serve as docking ports to the U.S. laboratory module, U.S. habitation module, an airlock and other space station elements KSC-98pc539

STS-132 TCDT - CREW M113 TRAINING 2010-2907

Boatswain's Mate Seamen Colby Todd, left, and Alexander Mohney rig a pulley system in preparation for a replenishment-at-sea aboard the guided-missile destroyer USS Mason (DDG 87).

Production. Veneer for aircraft and other war essentials. Torpedo boats need veneer of Philippine mahogany, which will be cut from these slabs, or flitches. A sling-load of quarter flitches being lowered into a heating vat in preparation for knife slicing at a Midwest veneer plant. Louisville, Kentucky

Starboard bow view of the US Navy (USN) New Attack Submarine (NAS) Pre-Commissioning Unit (PCU) VIRGINIA (SSN 774), as it is moved out doors for the first time in preparation for its christening, at the Electric Boat Corporation of Connecticut facility, located at Groton Shipyard, Connecticut (CT)

S129E011137 - STS-129 - View of MS Stott during Deorbit Preparation

Topics

kennedy space center lunarbotics preparation robots high resolution nasa